13967 SARA Concurrence · OPW16/0237
Attached to the e-mail Operational Works Application OPW16/0237.
Our reference: SPL-1016-034178 Your reference: 13967 Date: 10 October 2016 Debbie Gilbert Holdings Pty Ltd C/- Superior Jetties PO Box 920 NERANG QLD 4211 Attention: Jackie Hogan Dear Ms Hogan Concurrence agency response before application is made—with conditions 107 Noosa Parade, Noosaville QLD 4566; Lot 65 on N10572 (Related to section 271 and given under section 285 of the Sustainable Planning Act 2009) Reference is made to your correspondence dated 07 October 2016 requesting the Department of Infrastructure, Local Government and Planning provide a referral agency response for the proposed development before the development application is made to the assessment manager. Applicant details Applicant name: Debbie Gilbert Holdings Pty Ltd Applicant contact details: C/- Superior Jetties PO Box 920 Nerang QLD 4211 Site details Street address: 107 Noosa Parade, Noosaville QLD 4566 Real property description: 65 N10572 Local government area: Noosa Shire Council Application details Proposed development: Development Permit for Operational Works – Tidal Works (Pontoon) Page 1 SEQ North Region Level 8, Mike Ahern Building 12 First Avenue PO Box 1129 Maroochydore QLD 4558
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 5 pages
Page 2
SPL-1016-034178
Aspects of development and type of approval being sought
Nature of Approval Type Brief Proposal of Level of
Development Description Assessment
Operational Development Permit Tidal Works Code
Work (Pontoon) Assessment
Referral triggers
The development application would be referred to the department under the following
provisions of the Sustainable Planning Regulation 2009:
Referral trigger: Schedule 7, Table 2, Item 15 – Tidal Works, or development in a
coastal management district
Documents supplied to support request
Version and
Plan / Report title Author Reference no.
date
Site and Elevation Plan Superior Jetties 13967 – D01 6 October 2016
Conditions
Under section 287(1)(a) of the Sustainable Planning Act 2009, the department requires that
the conditions set out in Attachment 1 attach to any development approval.
Reasons for decision to impose conditions
Under section 289(1) of the Sustainable Planning Act 2009, the department is required to
set out the reasons for the decision to impose conditions. These reasons are set out in
Attachment 2.
Pursuant to section 272(3) of the Sustainable Planning Act 2009, you will not be required to
refer your application to the department if you submit this response in its entirety when
making the application to the assessment manager, and the following conditions are
satisfied:
Any changes to the proposal before the application is made to the assessment manager
do not result in a substantially different development to that which was presented to the
department with the request for a referral agency response
The development application must be made to the assessment manager within 12
months of the date of this referral agency response.
If you require any further information, please contact Candace Mitchell, Senior Planning
Officer, on 5352 9708 who will be pleased to assist.
Yours sincerely
Department of Infrastructure, Local Government and Planning Page.2
Page 3
SPL-1016-034178
Garth Nolan
Manager (Planning)
enc: Attachment 1—Conditions to be imposed
Attachment 2—Reasons for decision to impose conditions
Attachment 3—Approved plans and specifications
Department of Infrastructure, Local Government and Planning Page.3
Page 4
SPL-1016-034178
Our reference: SPL-1016-034178
Your reference: 13967
Attachment 1—Conditions to be imposed
No. Conditions Condition timing
Development Permit for Operational Work – Pontoon
Schedule 7, Table 2, Item 15 – Pursuant to section 255D of the Sustainable Planning Act
2009, the chief executive administering the Sustainable Planning Act 2009 nominates the
Director-General of the Department of Department of Transport and Main Roads to be the
assessing authority for the development to which this development approval relates for the
administration and enforcement of any matter relating to the following condition(s):
General
1. The development must be carried out generally in At all times
accordance with the following plans:
Site and Elevation Plan, Superior Jetties, 13967-
D01, dated 06/10/2016
Tidal Works
2. The structure must be lit/marked in accordance with the At all times
following specifications, such that it does not cause a risk to
the safe navigation of other ships:
section 3 of AS4282-1997 Control of the obtrusive
effects of outdoor lighting
3. The construction, operation or maintenance of the structure, At all times
and any ship berthed, moored or attached to the structure,
must not:
encroach into, pass over or under a navigation
corridor; or
be located in a high risk maritime zone
4. Any debris or similar obstruction generated whilst While works are
undertaking the work must be removed from the waterway occurring
and suitably disposed of at the applicant’s expense.
5. All piles and/or structures to be demolished, both above Prior to the
and below the waterline must be completely completion of the
extracted/removed. works
Department of Infrastructure, Local Government and Planning Page 4
Page 5
SPL-1016-034178
Our reference: SPL-1016-034178
Your reference: 13967
Attachment 2—Reasons for decision to impose conditions
The reasons for this decision are:
To ensure the development is carried out generally in accordance with the plans of
development submitted with the application.
To ensure that at all times, all lights on or above the development site do not interfere
with safe navigation in surrounding waterways.
To ensure the development does not encroach on the navigation corridor or high risk
maritime zone to ensure the safe passage of vessels (terms underlined are defined in
the glossary of Part C: Fast track framework of the State Development Assessment
Provisions, version 1.9).
To ensure that debris from the development does not create a hazard to navigation.
To ensure that there is no residual material that could create a hazard to navigation.
Findings on material questions of fact
The development is for a single pontoon at 107 Noosa Parade, Noosaville (Lot 65 on
N10572).
The proposed development is not within the navigation corridor or high risk maritime
zone.
Evidence or other material on which the findings were based
Development application, including plans provided.
State Development Assessment Provision, version 1.9, published by the Department
of Infrastructure, Local Government and Planning.
Sustainable Planning Act 2009.
Sustainable Planning Regulation 2009.
Department of Infrastructure, Local Government and Planning Page 5
Page 6
SPL-1016-034178 Our reference: SPL-1016-034178 Your reference: 13967 Attachment 3—Approved plans and specifications Department of Infrastructure, Local Government and Planning Page 6
Used in these records
13967 SARA Concurrence.pdfRelated documentApplication case desk ↗
About this file
- File size
- 273 KB (small file)
- File type
No other editions are linked here.