Our reference:      SPL-1016-034178
Your reference:     13967


Attachment 1—Conditions to be imposed


No.        Conditions                                                        Condition timing
Development Permit for Operational Work – Pontoon
Schedule 7, Table 2, Item 15 – Pursuant to section 255D of the Sustainable Planning Act
2009, the chief executive administering the Sustainable Planning Act 2009 nominates the
Director-General of the Department of Department of Transport and Main Roads to be the
assessing authority for the development to which this development approval relates for the
administration and enforcement of any matter relating to the following condition(s):
General
1.       The development must be carried out generally in               At all times
         accordance with the following plans:

                     Site and Elevation Plan, Superior Jetties, 13967-
                      D01, dated 06/10/2016
Tidal Works
2.         The structure must be lit/marked in accordance with the           At all times
           following specifications, such that it does not cause a risk to
           the safe navigation of other ships:
                 section 3 of AS4282-1997 Control of the obtrusive
                   effects of outdoor lighting
3.         The construction, operation or maintenance of the structure,      At all times
           and any ship berthed, moored or attached to the structure,
           must not:
                 encroach into, pass over or under a navigation
                   corridor; or
                 be located in a high risk maritime zone
4.         Any debris or similar obstruction generated whilst                While works are
           undertaking the work must be removed from the waterway            occurring
           and suitably disposed of at the applicant’s expense.
5.         All piles and/or structures to be demolished, both above          Prior to the
           and below the waterline must be completely                        completion of the
           extracted/removed.                                                works




Department of Infrastructure, Local Government and Planning                            Page 4

Used in these records

About this file

File size
273 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

13967 SARA Concurrence.pdf · 273 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.