Att 2 SWMP

of 40

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Attachment 2
Stormwater Management Plan
Response to Council’s Information Request–
Application for a Development Permit to
Establish Caretakers accommodation,
Outdoor Sales and Low Impact Industry
MCU21/0104

Address: 16 Rene St, Noosaville
Lot 13 on RP150347


Scooter Style Pty Ltd
Ronald and Margaret Salmon
Log in to download the original file

Att 2 SWMP.pdf · 3.7 MB (large file)

The download may take up to a minute.

Full text of the other 39 pages

Page 2

Scooter Style, 16 Rene St
20210121


RG Strategic
Preliminary Stormwater Management Plan


October 2021

Page 3

Document control record
Document prepared by:

RECOR Pty Ltd
ABN 89 647 469 707
37 Mary Street
Noosaville, QLD 4566
Australia

T +61 7 5211 1003
E [email protected]
W recorconsulting.com

A person using RECOR documents or data accepts the risk of:
a)     Using the documents or data in electronic form without requesting and checking them for accuracy against the original hard
       copy version.
b)     Using the documents or data for any purpose not agreed to in writing by RECOR.



 Document control

 Report title                      Preliminary Stormwater Management Plan

 Document code                     20210121-SWMP01                  Project number                  20210121

 File path                         Https://recorconsulting.sharepoint.com/sites/BusinessDevelopment/Shared
                                   Documents/General/Templates/Report Template.docx

 Client                                RG Strategic

 Client contact                    -                                Client reference                -
 Rev      Date                     Revision details/status          Author          Reviewer        Verifier              Approver
                                                                                                    (if required)

 0        07/10/2021               Initial Version                  B. Parry        M. Poynter




 Current revision                  0


 Approval

 Author signature                                                   Approver signature




 Name                             B. Parry                          Name

 Title                            Civil Engineer                    Title




                                                                                                                    recorconsulting.com
                                                A 37 Mary St, Noosaville Qld 4566                                   E [email protected]
P +61 7 5211 1003

Page 4

Contents
Introduction..........................................................................................................................................4
Site Details ...........................................................................................................................................5
          2.1. Existing Site Description ...................................................................................................................... 5
          2.2. Existing Drainage Patterns .................................................................................................................. 5
          2.3. Proposed Development Drainage Pattern ......................................................................................... 6
          2.4. Flood Considerations ........................................................................................................................... 7
          2.5. Acid Sulphate Soils .............................................................................................................................. 7

Stormwater Quantity ............................................................................................................................9
          3.1. Pre-Post Comparison .......................................................................................................................... 9

Stormwater Quality ........................................................................................................................... 13
          4.1. Construction Phase ........................................................................................................................... 13
          4.2. Operational Phase ............................................................................................................................ 14

Conclusion ........................................................................................................................................ 20




Appendices
Appendix A
          Proposed Stormwater Layout Plan

Appendix B
          WBNM Modelling Parameters

Appendix C
          Bioretention Inspection Checklist

Appendix D
          Noosa Council Works Code Checklist




Project number 20210121
File RECOR Preliminary Stormwater Management Report - 20210121.docx, 2021-10-07
Revision 0
                                                                                                                                         recorconsulting.com
P +61 7 5211 1003                                      A 37 Mary St, Noosaville Qld 4566                                                E [email protected]

Page 5

 INTRODUCTION
RECOR has been commissioned to prepare a preliminary Stormwater Management Report to
accompany a development application for a caretaker building and an additional carparking area
within an existing industrial lot.

This report examines the stormwater management considerations for the existing and proposed
development site and assesses how the run-off from the site is to be managed in accordance with
Noosa Shire Council requirements for stormwater drainage.




Project number 20210121
File RECOR Preliminary Stormwater Management Report - 20210121.docx, 2021-10-07                                 Page 4 of 26
Revision 0

P +61 7 5211 1003                A 37 Mary St, Noosaville Qld 4566                E [email protected]   recorconsulting.com

Page 6

 SITE DETAILS

     2.1. Existing Site Description
Lot 13 (RP150347), located at 16 Rene Street, covers an area of 1298m², including an existing
building with a roof area of 350.5m² and impervious ground surfaces covering 265.2m² of the site
(total impervious area of 615.7m²). The site contains an easement housing existing sewer and
stormwater along the southern boundary of the property. The subject land falls east towards Rene
Street at grades of typically 4%. The upstream run-off from the Council works depot site at the
western boundary is intercepted by a concrete spoon drain in the adjacent property so no upstream
flows are expected to encumber the site.


     2.2. Existing Drainage Patterns
The surface run-off from the existing site is captured in inlet pits within the existing driveway and a
trench drain at the driveway access that discharge to the Council stormwater infrastructure within
Rene St. At the rear of the site to the west, a small earthen bund at the approximate location of the
edge of the easement separates run-off running within the easement area from the run-off within the
rest of the site.
Roof run-off from the building appears to be discharged through downpipes into the stormwater
drainage running through the easement at the south of the site.




                          Figure 2.1 - Site Locality Plan (Noosa Council Intramaps, 2021)



Project number 20210121
File RECOR Preliminary Stormwater Management Report - 20210121.docx, 2021-10-07                                 Page 5 of 26
Revision 0

P +61 7 5211 1003                A 37 Mary St, Noosaville Qld 4566                E [email protected]   recorconsulting.com

Page 7

          2.2.1 Stormwater Catchments




                                          Figure 2.2 – Existing Catchments Plan




     2.3. Proposed Development Drainage Pattern

          2.3.1 Stormwater Concept
Stormwater run-off from the new caretaker building roof area will be conveyed into a single 7.5kL
rainwater tank. The tanks will be plumbed for internal reuse in toilets and laundry areas, with 3.75kL
of the tank allocated for reuse, and the remaining 3.75kL dedicated to attenuating the roof run-off.
To minimise pollutants entering the tank, first flush diverters will be installed to divert the initial
capture of roof water to irrigation of the vegetated areas on site.

Run-off from the new driveway area will be graded to fall towards a bioretention area to the west of
the existing building for water quality treatment. A trench drain at the edge of the existing pavement
will be provided to ensure that the majority of run-off from the proposed driveways at the rear of the
site will be treated prior to discharge from the site. The bioretention area inlet pit will connect into
the drainage line within the easement, where it will be discharged from the site as the legal point of
discharge for the proposed development area.

The roof and allotment drainage system for the proposed site shall be designed to comply with:

     1. Noosa Shire Council Planning Scheme Policy (PSP) - Engineering Design Standards – Roads,
        drainage and earthworks;

     2. The Queensland Urban Drainage Manual (QUDM); and

     3. AS/NZS 3500.3:2015 - Plumbing and Drainage Part 3: Stormwater Drainage.

Refer to Appendix A Proposed Stormwater Layout Plan for the proposed stormwater drainage
layout plan.




Project number 20210121
File RECOR Preliminary Stormwater Management Report - 20210121.docx, 2021-10-07                                 Page 6 of 26
Revision 0

P +61 7 5211 1003                A 37 Mary St, Noosaville Qld 4566                E [email protected]   recorconsulting.com

Page 8

          2.3.2 Stormwater Catchments
A schematic layout plan of the proposed development and its drainage catchments as described in
the previous sections is shown below in Figure 2.3 – Proposed Catchments Plan.




                                        Figure 2.3 – Proposed Catchments Plan



     2.4. Flood Considerations
Review of the Noosa Shire Council Intramaps flood layers including the Flood Hazards Overlay has
identified that the site is located outside of any flood or inundation areas within the locality indicating
it is not expected that that the proposed development will be subject to flooding.


     2.5. Acid Sulphate Soils
Review of the Noosa Shire Council Intramaps Land Subject to Acid Sulphate Soils Overlay identifies
that the site is located within Area 2 of the overlay, for lands between 5m AHD and 20m AHD. Acid
Sulphate Soil testing is typically required in areas with surface levels less than 5.0m Australian Height
Datum (AHD) as stated in the State Planning Policy 2017. The requirements for acid sulphate testing
are to be assessed by a geotechnical engineer prior to the detailed design stage of this proposed
development.




Project number 20210121
File RECOR Preliminary Stormwater Management Report - 20210121.docx, 2021-10-07                                 Page 7 of 26
Revision 0

P +61 7 5211 1003                A 37 Mary St, Noosaville Qld 4566                E [email protected]   recorconsulting.com

Page 9

 Figure 2.4 – Land Subject to Acid Sulphate Soils Overlay (Colour indicates above 5m AHD to 20m AHD)




Project number 20210121
File RECOR Preliminary Stormwater Management Report - 20210121.docx, 2021-10-07                                 Page 8 of 26
Revision 0

P +61 7 5211 1003                A 37 Mary St, Noosaville Qld 4566                E [email protected]   recorconsulting.com

Page 10

 STORMWATER QUANTITY

     3.1. Pre-Post Comparison
The site conditions were modelled using the Watershed Bounded Network Model (WBNM) software
in combination with Storm Injector. This combination allows the site to be modelled to determine the
critical storm events for the existing site and the proposed development to assess whether there is
an increase to the peak run-off and if so, to determine the level of stormwater detention required to
ensure peak outflows from the site are not increased.

The models have been run using the ensemble of storm events for 63.2%, 50%, 20%, 10%, 5%, 2%
and 1% Annual Exceedance Probability (AEP) for durations from 1 minutes to 12 hours to
determine the critical storm duration and the mean peak flowrate from the storms. The parameters
obtained from the Australian Rainfall and Runoff (ARR) Data Hub for the location and the rainfall
data obtained from the Bureau of Meteorology have been used to generate the storms.

As identified in the Noosa Shire Council Works Code, climate change impacts are to be accounted
for in the stormwater modelling. Discussions with Council have indicated that a 20% increase to the
Bureau of Meteorology rainfall data will provide an acceptable allowance, therefore the rainfall data
has been increased by 20% for all storm events to account for this.

Both the existing and developed site have been modelled as a single catchment representing the full
site with the actual impervious fractions determined from the site survey and the proposed design
plans. A catchment lag parameter of 1.6 has been applied along with a non-linearity parameter of
0.77 as recommended by the ARR Guide to Flood Estimation Book 7 Application of Catchment
Modelling Systems. The modelling parameters and rainfall intensities used are provided in Appendix
B WBNM Modelling Parameters.

The hydrographs and box plots of the different storm events for the critical storms for the existing
site and the proposed development site based on this modelling are provided in Figure 3.1 – Pre-
development site critical storm rainfall hydrographs showing peak flow rates and Figure 3.2 – Post-
development site critical storm rainfall hydrographs showing peak flow rates.




Project number 20210121
File RECOR Preliminary Stormwater Management Report - 20210121.docx, 2021-10-07                                 Page 9 of 26
Revision 0

P +61 7 5211 1003                A 37 Mary St, Noosaville Qld 4566                E [email protected]   recorconsulting.com

Page 11

       Figure 3.1 – Pre-development site critical storm rainfall hydrographs showing peak flow rates




      Figure 3.2 – Post-development site critical storm rainfall hydrographs showing peak flow rates



Project number 20210121
File RECOR Preliminary Stormwater Management Report - 20210121.docx, 2021-10-07                                 Page 10 of 26
Revision 0

P +61 7 5211 1003                A 37 Mary St, Noosaville Qld 4566                E [email protected]   recorconsulting.com

Page 12

The results of the modelling against the range of design storms for the development under the
existing and proposed development conditions are shown in Table 3.1 Existing and proposed
unmitigated site peak discharge rates.

                     Table 3.1 Existing and proposed unmitigated site peak discharge rates

                                                         16 Rene Street
                                                                                      Qchange
                                A.E.P        Qexisting     Qproposed      Qchange      (%)
                                             (m³/s)        (m³/s)         (m³/s)

                               63.20%        0.031         0.034       0.003         10%
                               50%           0.038         0.040       0.002         5%
                               20%           0.062         0.065       0.003         5%
                               10%           0.077         0.082       0.005         6%
                               5%            0.093         0.094       0.001         1%
                               2%            0.106         0.108       0.002         2%
                               1%            0.116         0.121       0.005         4%


As is expected, the increased impervious area will generate a higher peak storm discharge that will
require attenuation to ensure no worsening of the current run-off from the site.

The post-development model was updated to provide storage through a rainwater tank with
attenuation storage connected to the new roof area, as well as the storage provided by the
bioretention area for surface run-off. An iterative process was used to determine a suitable
configuration of storage volume, low-flow, and high flow pipe outlets for the rainwater tank to deliver
the required reduction of the flow rates from the site.

The tank has been modelled as a 7,500L rainwater detention tank. A low flow outlet with 25mm orifice
plate is provided at half the tank height with the volume below the low flow assumed to be full at the
time of the stormwater. A high flow 90mm diameter outlet at the top of the tank acts as the overflow
for larger storm events.

The bioretention area has been modelled based on the sizing determined through MUSIC modelling
to deliver the required stormwater quality improvements. A 5m² area is modelled with a low flow
100mm diameter slotted ag pipe at the base of the garden, and the inlet pit operating as a weir inlet.
A 600mm media filter depth with an assumed porosity of 0.3 and the extended detention depth of
200mm provides the storage capacity for the bio-garden.

Using this combination of parameters, has been found to achieve the desired results as shown below
in Table 3.2 Existing and proposed mitigated site peak discharge rates. The resulting hydrograph is
shown in Figure 3.3 – Mitigated post development site critical storm rainfall hydrographs showing
peak flow rates.




Project number 20210121
File RECOR Preliminary Stormwater Management Report - 20210121.docx, 2021-10-07                                   Page 11 of 26
Revision 0

P +61 7 5211 1003                A 37 Mary St, Noosaville Qld 4566                  E [email protected]   recorconsulting.com

Page 13

                      Table 3.2 Existing and proposed mitigated site peak discharge rates

                                                         16 Rene Street
                                                                                      Qchange
                                A.E.P        Qexisting     Qproposed      Qchange      (%)
                                             (m³/s)        (m³/s)         (m³/s)

                               63.20%        0.031         0.030       -0.001        -3%
                               50%           0.038         0.036       -0.002        -5%
                               20%           0.062         0.059       -0.003        -5%
                               10%           0.077         0.074       -0.003        -4%
                               5%            0.093         0.085       -0.008        -9%
                               2%            0.106         0.099       -0.007        -7%
                               1%            0.116         0.107       -0.009        -8%




 Figure 3.3 – Mitigated post development site critical storm rainfall hydrographs showing peak flow rates

As the total peak flows are equal to or below the existing site conditions, the development suitably
controls the peak flow storm events from the development.




Project number 20210121
File RECOR Preliminary Stormwater Management Report - 20210121.docx, 2021-10-07                                   Page 12 of 26
Revision 0

P +61 7 5211 1003                A 37 Mary St, Noosaville Qld 4566                  E [email protected]   recorconsulting.com

Page 14

 STORMWATER QUALITY
The following sections discuss the stormwater quality considerations for the construction and
operational phase of the development.


     4.1. Construction Phase

          4.1.1 Erosion and Sediment Control Measures
During construction, it will be necessary to manage stormwater run-off to avoid potential
contamination of downstream waterways from sediments and other pollutants from the site. Best
practice erosion and sediment controls shall be installed to minimise the discharge of potential
contaminants from the site, in accordance with the objectives of Appendix 2 of the SPP (DERM, July
2017) shown below in Figure 4.1.




           Figure 4.1 SPP 2017 Construction Phase Stormwater Management Design Objectives

A site-specific erosion and sediment control plan shall be prepared as part of a future submission for
Operational Works approval. Suitable erosion and sediment controls for the site may include:

     1. Sediment fencing along downstream of the work areas within the site to prevent sediment
        from leaving the construction area.

     2. A shakedown area is to be installed at the construction entry/exit to the proposed
        development area to minimise sediment being transported to and from the site.


Project number 20210121
File RECOR Preliminary Stormwater Management Report - 20210121.docx, 2021-10-07                                 Page 13 of 26
Revision 0

P +61 7 5211 1003                A 37 Mary St, Noosaville Qld 4566                E [email protected]   recorconsulting.com

Page 15

     3. Ensuring any stockpiles and construction materials are contained using sediment fencing
        downstream of these areas.

     4. Downstream pits within the property to be protected through filter socks or similar.


     4.2. Operational Phase
The development is to comply with the Noosa Council Water Quality and Drainage Code, AO6.2
which states:

“All stormwater runoff is treated to achieve maximum removal of nutrients, gross pollutants and
suspended solids as determined by cost to efficiency ratios. (e.g., bioretention basins must be sized
to achieve at least 80% reduction in total suspended solids, 60% reduction in total phosphorous, 45%
reduction in total nitrogen and 90% reduction in gross pollutants >5mm).”

It is proposed that the following measures to be implemented will provide the required level of
stormwater quality improvement to minimise impacts to the downstream network:

     •    First-flush divertors will be installed for roof-water drainage to divert initial run-off capture
          to irrigation of the vegetated areas on site.
     •    A 7,500L Slimline Rainwater tanks will be used to capture roof run-off from the proposed
          caretaker building, with 50% of the tank volume allocated to reuse, and 50% to attenuation
          storage.
     •    A 5m² bioretention area will be used to treat and detain stormwater run-off from the newly
          developed area prior to discharge from the site.



          4.2.1 MUSIC Modelling
The proposed development and the above treatment train have been modelled in MUSIC (Model
for Urban Stormwater Improvement Conceptualisation) software in accordance with the Water by
Design MUSIC Guidelines 2018.

The climatic data has been modelled using the rainfall and PET data at station 40059 (Cooroy
Composite) in 6-minute timesteps. The rainfall run-off parameters have been set as defined for the
Southeast Queensland region, shown below in Figure 4.2 - Rainfall run-off parameters for SEQ.




Project number 20210121
File RECOR Preliminary Stormwater Management Report - 20210121.docx, 2021-10-07                                 Page 14 of 26
Revision 0

P +61 7 5211 1003                A 37 Mary St, Noosaville Qld 4566                E [email protected]   recorconsulting.com

Page 16

                                   Figure 4.2 - Rainfall run-off parameters for SEQ

As the existing site is largely unchanged, only the proposed additions to the site have been
modelled The source nodes have been created using a split catchment approach with the
proposed new roof and driveway areas separated and modelled with stochastic pollutant
generation for each of the surface types as per Table 4.1 - Industrial Split Node Pollutant
Generation Parameters. The area and impervious fractions for each catchment are actual values
based on the design plans.


                        Table 4.1 - Industrial Split Node Pollutant Generation Parameters

  Flow Type         Surface        TSS LOG¹º                         TP LOG¹º VALUES          TN LOG¹º VALUES
                    Type           Mean      St. Dev                 Mean      St. Dev        Mean      St. Dev
  Baseflow          Roof             N/A        N/A                     N/A       N/A           N/A        N/A
                    Driveway         0.78       0.45                   -1.11      0.48          0.14       0.20
                    Ground           0.78       0.45                   -1.11      0.48          0.14       0.20
  Stormflow         Roof             1.30       0.44                   -0.89      0.36          0.25       0.32
                    Driveway         2.43       0.44                   -0.30      0.36          0.25       0.32
                    Ground           1.92       0.44                   -0.59      0.36          0.25       0.32

The proposed treatment train has been modelled as shown in Figure 4.3 - MUSIC Stormwater
Treatment Train. The details of the treatments are described in the following sections




Project number 20210121
File RECOR Preliminary Stormwater Management Report - 20210121.docx, 2021-10-07                                 Page 15 of 26
Revision 0

P +61 7 5211 1003                A 37 Mary St, Noosaville Qld 4566                E [email protected]   recorconsulting.com

Page 17

                                   Figure 4.3 - MUSIC Stormwater Treatment Train




                    4.2.1.1.             Rainwater Tanks
The rainwater tanks connected to the source nodes representing their drained catchments. Each of
the tanks to be provided is modelled as a 3kL storage volume, with 1.5kL allocated for re-use
(assumed to be full at beginning of the modelling) and the remaining portion being for attenuation
capacity.




                       Figure 4.4 – 7.5kL Rainwater Attenuation Tank node configuration



Project number 20210121
File RECOR Preliminary Stormwater Management Report - 20210121.docx, 2021-10-07                                 Page 16 of 26
Revision 0

P +61 7 5211 1003                A 37 Mary St, Noosaville Qld 4566                E [email protected]   recorconsulting.com

Page 18

The tanks will be plumbed for internal reuse which has been modelled in accordance with the Water
by Design MUSIC Modelling guidelines. The reuse demands have been determined assuming the
caretaker facility would share similar characteristics to a 1 bedroom detached dwelling as follows:

     -    Internal Reuse

               o    All homes are assumed to be fitted with full water saving devices,

                          ▪    21L/Person/day for toilets

               o    1-bedroom detached dwelling:

                          ▪    1.6 persons per dwelling

                          ▪    1.6 * 21L = 33.6L/day/unit


               4.2.1.2. Bioretention Areas
A 5m² bioretention areas is to be provided within the property to capture and treat surface run-off
from the driveways as well as overflows from attenuation tanks. The bioretention areas are
modelled in accordance with the Water by Design MUSIC Guidelines 2018 with the node
configuration for one of the areas shown below in Figure 4.5 – Bioretention Node details.




                                         Figure 4.5 – Bioretention Node details

Table 4.2 – Indicative Bioretention Area Plantings below (based on the Brisbane City Council Water
Sensitive Urban Design Engineering Guidelines) presents a sample of suitable plants that shall be
used to ensure the garden delivers effective nutrient removal in the bioretention areas.




Project number 20210121
File RECOR Preliminary Stormwater Management Report - 20210121.docx, 2021-10-07                                 Page 17 of 26
Revision 0

P +61 7 5211 1003                A 37 Mary St, Noosaville Qld 4566                E [email protected]   recorconsulting.com

Page 19

                                  Table 4.2 – Indicative Bioretention Area Plantings

                                                                                                                        Planting
                                                                                                                        Density
 Scientific Name                                   Common Name                     Form          Height (mm)            (Qty/m²)
 Myoporum parvifolium                              Creeping Boobialla              Prostrate                    150     4-6
 Cymbopogon refractus                              Barbed Wire Grass               Tufted                       300     8-10
 Cyperus polystachyos                              Bunchy Sedge                    Tufted                       600     6-8
 Dianella brevipendunculata                        Flax Lily                       Tufted                       500     4-6
 Dianella caerulea cv ‘Breeze’                     Blue Flax-lily                  Tufted                       600     4-6
 Dianella caerulea cv ‘Little Jess’                Blue Flax-lily                  Tufted                       400     4-6
 Dianella longifolia var. longifolia               Pale Flax-lily                  Tufted                       550     6-8
 Dichelachne crinita                               Long Haired Plume Grass         Tufted                       200     6-8
 Erograstis elongata cv ‘Elvera’                   Elvera                          Tufted                       300     6-8
 Imperata cylindrica                               Blady Grass                     Tufted                       500     4-6
 Lepidosperma laterale                             Variable Sword Sedge            Tufted                       750     8-10
 Lomandra confertifolia                            Matting Lomandra                Tufted                       300     4-6
 Lomandra confertifolia subs pallida               Mat Rush                        Tufted                       400     4-6
 Lomandra longifolia                               Matt Rush                       Tufted                  1000         4-6
 Lomandra longifolia cv 'Tanika'                   Tanika                          Tufted                       500     4-6
 Poa labillardiere cv ‘Eskdale’                    Eskdale                         Tufted                       450     6-8
 Themeda australis                                 Kangaroo Grass                  Tufted                       400     6-8
 Themeda australis cv ‘Mingo                       Mingo                           Tufted                       200     8-10



                4.2.1.3. MUSIC modelling results
The proposed treatment train for each site can achieve the required water quality improvements as
shown below in Table 4.3 - MUSIC Modelling results for 16 Rene St.

                                 Table 4.3 - MUSIC Modelling results for 16 Rene St.

  Pollutant                                  Sources           Residual           Percentage          Percentage
                                                               Load               Target              Reduction

  Total Suspended Solids (kg/yr)                94.482               13.132             80                  86.101

  Total Phosphorus (kg/yr)                       0.177               0.046              60                      74.01

  Total Nitrogen (kg/yr)                         0.912               0.492              45                  46.011

  Gross Pollutants (kg/yr)                       8.119               0.313              90                  96.142




Project number 20210121
File RECOR Preliminary Stormwater Management Report - 20210121.docx, 2021-10-07                                        Page 18 of 26
Revision 0

P +61 7 5211 1003                A 37 Mary St, Noosaville Qld 4566                 E [email protected]         recorconsulting.com

Page 20

          4.2.2 Operational Maintenance
Periodic maintenance and monitoring of the bioretention area proposed for this development shall
be carried out to ensure it is operating effectively during the operational phase. The responsibility
for these maintenance activities shall be the body corporate or owner of the site.

The bioretention areas shall be maintained following a schedule of routine inspections undertaken
after every significant rainfall event (30mm of rainfall in a 24-hour period) or on a three-monthly
basis within the first twelve months and on a six-monthly basis thereafter. The inspection shall
ensure the proper functioning and condition of the bioretention area and ensure that the planting
and vegetation health is suitably maintained. An inspection checklist from the Healthy Waterways
Technical Design Guidelines for Southeast Queensland has been provided in Appendix C
Bioretention Inspection Checklist that provides the structure for the inspections to be undertaken.

In addition to regular inspections, the first 4 months of establishment of the bioretention areas
requires a watering frequency of:

    i.    Week 1 - 6: 5 times per week


   ii.    Week 6-10: 3 times per week


  iii.    Week 11-15: 2 times per week


After 5 months, watering frequency shall be adjusted based on the local conditions to ensure plants
are maintained in a healthy state.




Project number 20210121
File RECOR Preliminary Stormwater Management Report - 20210121.docx, 2021-10-07                                 Page 19 of 26
Revision 0

P +61 7 5211 1003                A 37 Mary St, Noosaville Qld 4566                E [email protected]   recorconsulting.com

Page 21

 CONCLUSION
This Stormwater Management Report has outlined how the stormwater run-off from the site is to be
managed to comply with the relevant requirements and minimise any adverse impacts to the
downstream catchments.

     •    The existing site surface run-off is captured internally and discharge into the Council
          stormwater infrastructure on Rene St and within the easement on the property.

     •    The proposed legal point of discharge for the newly developed area of the site will be the
          stormwater network within the easement on the property.

     •    The existing and proposed development site have been modelled for the critical design
          storm events for the site, which found attenuation would be required. Provision of a 7.5kL
          rainwater attenuation tank with 3.75kL of attenuation storage was found to provide suitable
          mitigation to the development to ensure that there will be no increase to existing peak flow
          discharges from the site for any of the storm events.

     •    During construction, erosion and sediment control measures are to be implemented to
          minimise potential contaminants impacting the downstream receiving environment. An
          erosion and sediment control plan shall be developed as part of a submission for Operational
          Works approvals.

     •    In the operational phase of the development, a stormwater treatment train will provide
          quality improvements as required by the Noosa Council Planning Scheme Policy. Roof run-
          off from the new caretaker’s facility will be captured in a 7,500L rainwater reuse and
          attenuation tanks. The tank is to be plumbed for reuse in internal toilets, serving to provide
          both treatment and reduce the volume of run-off leaving the site. Overflows from the tanks,
          as well as the surface run-off from the driveway will be directed toward a 5m2 bioretention
          areas providing the required treatment for the proposed development. Outflows from the
          bioretention area will be discharged through the stormwater infrastructure in the drainage
          easement within the property

          By implementing the proposed stormwater treatments, the development will reduce the
          quantity of stormwater pollutants by more than 90% of gross pollutants, 80% of total
          suspended solids, 60% total phosphorous and 45% total nitrogen, exceeding the pollutant
          reduction targets required for the site.

     •    The proposed stormwater solution is considered to minimise any adverse impacts to the
          downstream environment arising from the stormwater run-off while also meeting the
          stormwater quality targets required for the development.




Project number 20210121
File RECOR Preliminary Stormwater Management Report - 20210121.docx, 2021-10-07                                 Page 20 of 26
Revision 0

P +61 7 5211 1003                A 37 Mary St, Noosaville Qld 4566                E [email protected]   recorconsulting.com

Page 22

Appendix A
Proposed Stormwater Layout Plan




Project number 20210121
File RECOR Preliminary Stormwater Management Report - 20210121.docx, 2021-10-07                                 Page 21 of 26
Revision 0

P +61 7 5211 1003                A 37 Mary St, Noosaville Qld 4566                E [email protected]   recorconsulting.com

Page 23

                                                                                                                                                                                                                                                                                                                                                                                                                       PRELIMINARY
                                                                                                                                                                                                                                                                                                                                                                                                                       NOT FOR CONSTRUCTION


                                                                                           100mm GRATED                                                                                                                                                                                                                                                                                                                              BIORETENTION GARDEN
                                                                                           TRENCH DRAIN
                                                                                                                                                                                                                EXISTING                                                                                                                                                                                                             TRENCH DRAIN
                     PROVIDE 7,500L SLIMLINE                                                                                                                                                                    DRIVEWAY
                     RAINWATER ATTENUATION
                     TANKS AS PER DETAIL B.
                                                                                                                                                                                                                                                                                                                                                                                                                                     RAINWATER TANK


                                                                                                                                                                                                                                                                                                                                                                                                                                    OVERLAND FLOW DIRECTION

                                                                                   PROPOSED NEW
                                                                                   DRIVEWAY                                                                                                                                                                                                                                                                                                                                        DRAINAGE LINE




                         PROPOSED
                         CARETAKERS
                         BUILDING
                                                                                                                                                                                                                     EXISTING
                                                             COVERED
                                                                                                                                                       5m² BIORETENTION AREA.                                        BUILDING
                                                             CARETAKERS
                                                             CAR PARK                                                                                  600MM FILTER MEDIA
                                                                                                                                                       200MM EXTENDED DETENTION DEPTH
                                                                                                                                                       REFER TO DETAIL A.

                                                                                                                                                                                                                                                                                                                         TANDEM CAR
                                                                                                                                                                                                                                                                                                                         PARK


       STORM WATER PIT
                                  APPROX STORM WATER LINE

                                                                                                                                                     PROVIDE 600x600 GRATED INLET
                                                                 SMH                                                                                 CLASS B GRATED LID
                                                                                                                                 APPROX SEWER LINE
                                                                                                                                                                                                                                                                                                                                                SMH
                                                              EXTENDED DETENTION
                                                                 NOMINAL 200MM




                                                                                                  PLANTING SPECIES TO PROVIDE EFFECTIVE
                                                                                                  REMOVAL OF NUTRIENTS. PLANT VARIETIES
          MAINTENANCE HATCH                                                                       AND PLANTING DENSITIES TO ARCHITECTURAL
          SECURE CAPPED END WITH
          SCREWS
                                                                                                  SPECIFICATIONS
                                                                                                                                                           LOW FLOW JUNCTION WITH SCREW CAP DETAIL                                                                                                                                                                                                                      DO NOT SCALE, IF IN DOUBT ASK!
                                                                                                                                                           NTS
                               600x600 RAISED GRATE                                                                                                                                                           ORIFICE PLATE DISK WITH                100Ø HIGH FLOW OUTLET ROOF DOWNPIPE CONNECTION TO HYDRAULIC
                                  FIELD INLET PIT S.L.                                                                                                                                                        25mm ORIFICE                                                 ENGINEERS SPECIFICATIONS
1 IN
       4 MA
           X                                                                                               MAX                                                                     HIGH FLOW
                                                                                                  1 IN 4           EXTEND GEOFABRIC 500MM                                                                           TANK WALL
                                                                                                                                                                                   OUTLET
                                                                                                                    AND PIN UNDER TOPSOIL

                                                                                                                                                                                                              RETENTION LEVEL                                        7,500L SLIMLINE RAINWATER TANK
                                                                                                                                                                             SCREW ON
                                                                                                             500MM SANDY LOAM FILTER MEDIA                                   ACCESS CAP
                                                                                                             (0.45MM AVERAGE PARTICLE SIZE)                                                                                                                                     ATTENUATION
                                                                                                                                                                                                                                                                                VOLUME 3.75KL                                                                                                             0 8/10/21 INITIAL PREPARATION                                       BP MP
                                                                                                                                                                                                                                                                                                                                                                                                         Rev Date Description                                                 By Chk
                                                                                                                                                                                 OUTLET TO
                                                                                                                                                                                 DRAINAGE
                                                                                                                                                                                 NETWORK
                                                                                                                 100MM COARSE SAND TRANSITION                                                       ORIFICE DISK TO BE GLUED INSIDE                                      RAINWATER REUSE VOLUME
                                                                                                                 FILTER MEDIA                                                                       JUNCTION. uPVC OUTLET FROM TANK                                              3.75KL
                                                                                                                 (NOMINAL SIZE 0.5 - 2MM)                                                           TO BUTT UP AGAINST ORIFICE DISK

               PROVIDE                                     PROVIDE SLOTTED SUBSOIL DRAIN AT
               END CAP                                     MIN 0.5% GRADE TO PIT                           NOMINAL 200MM GRAVEL DRAINAGE LAYER                                                                                                                                                                                                                                                             [email protected]
                                                                                                           (FINE AGG., NOMINAL SIZE 2 - 5MM)
                                                                                                                                                                                                                                                                                                                                                                                                           37 MARY ST NOOSAVILLE, QLD
                                                         BIDIM A34 GEOFABRIC OR SIMILAR                                                                                                                                                                                                                                                                                                                    07 5211 1003
                        SUBSOIL DRAIN CLEANOUT           TO BE WRAPPED AROUND
                                                          WALLS AND BASE OF FILTER MEDIA
                                                                                                                                                                                                                                             DETAIL B - RAINWATER ATTENUATION TANK                                                                                                                       Client
               (NON-SLOTTED PVC) AND 135° ELBOW                                                                                                                                                                                              NTS                                                                                                                                                         RG STRATEGIC
                                    CONNECTOR
                                                                                                                                                                                                                                                                                                                                                                                                         Project Name

                                                                                                                                                                                                                                                                                                                                                                                                     SCOOTER STYLE
                                                                                                                                                                                                                                                                                                                                                                                                     16 RENE ST
                               DETAIL A -BIORETENTION AREA                                                                                                         DRAINAGE NOTES                                                                                             SUBJECT STRUCTURE TO BE CONSTRUCTED TO.
                                                                                                                                                                                                                                                                         7.   CONTRACTOR TO ENSURE ALL MANHOLE AND PIT STRUCTURES COMPLY WITH THE MAXIMUM DEPTH SPECIFIED                            NOOSAVILLE 4566 QLD
                               NTS                                                                                                                                                                                                                                            BY THE LOCAL AUTHORITY FROM FINISHED SURFACE LEVEL TO UNDERSIDE OF SLAB. ANY NON CONFORMANCE
                                                                                                                                                                   1.   BUILDING DRAINAGE TO BE DESIGNED BY HYDRAULIC CONSULTANT.                                                                                                                                                                         Title
                                                                                                                                                                                                                                                                              IS TO BE RECTIFIED AT THE CONTRACTORS EXPENSE.
                                                                                                                                                                   2.   ALL STORMWATER PIPES ARE TO BE MANUFACTURED TO RELEVANT AUSTRALIAN STANDARDS INCLUDING BUT                                                                                                                                        PRELIMINARY STORMWATER LAYOUT
                                                                                                                                                                        NOT LIMITED TO AS4058 AND AS1992.                                                          8.         THE CONTRACTOR IS TO CONFIRM THE LOCATION OF SERVICE CONDUITS WITH THE SUPERINTENDENT PRIOR
                                                                                                                                                                                                                                                                              TO LAYING STORMWATER DRAINAGE. ALL TRENCH EXCAVATION AND CONSTRUCTION SHALL COMPLY WITH THE
                                                                                                                                                                   3.   CONTRACTOR TO CONFIRM LOCATION AND LEVEL OF EXISTING STORMWATER DRAINAGE WHERE CONNECTING             REQUIREMENTS OF THE QUEENSLAND WORKPLACE HEALTH AND SAFETY ACT 2011.
                                                                                                                                                                        ON TO EXISTING AND NOTIFY ENGINEER OF ANY CONFLICTS.
                                                                                                                                                                                                                                                                         9.   REFER TO ARCHITECTURAL PLANS FOR ALL DIMENSIONS.
                                                                                                                                                                   4.   ALL STORMWATER GRATES/LIDS WITHIN TRAFFICABLE AREAS TO BE CLASS "D" IN ACCORDANCE WITH AS3996.
                                                                                                                                                                   5.   ALL GRATES AND LIDS SHALL SIT FLAT WITH ITS SURROUND AND NOT BE LOOSE OR MOVE UNDER WHEEL                                                                                                                                        Project No.               Discipline                 Status
                                                                                                                                                                        LOADS.                                                                                                                                                                                                                                     20210121                     CIVIL                 PRELIMINARY
                                                                                                                                                                   6.   ALL STORMWATER STRUCTURES TO BE CONSTRUCTED IN ACCORDANCE WITH LOCAL AUTHORITY GUIDELINES                                                                                                                                        Designed By               Drawn By                   Scale
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          (at
                                                                                                                                                                        AND SPECIFICATIONS. WHERE STRUCTURES EXCEED MAXIMUM DEPTH AS IDENTIFIED WITHIN STANDARD                                                                                                                                                    B.PARRY                      J.CARR                   1:100           A1)
                                                                                                                                                                        DRAWINGS THE CONTRACTOR WILL ENSURE AN ADEQUATE STRUCTURAL DESIGN IS UNDERTAKEN FOR THE
                                                                                                                                                                                                                                                                                                                                                                                                          Drawing No.                                                         Revision

                                                                                                                                                                                                                                                                                                                                                                                                              S01.01                                                               1


                                                                                                                                                                                                                                                                                                                                                                             FULL SIZE ON ORIGINAL   0            10    20    30        40        50     60    70        80       90        100 mm

Page 24

Appendix B
WBNM Modelling Parameters




Project number 20210121
File RECOR Preliminary Stormwater Management Report - 20210121.docx, 2021-10-07                                 Page 22 of 26
Revision 0

P +61 7 5211 1003                A 37 Mary St, Noosaville Qld 4566                E [email protected]   recorconsulting.com

Page 25

Modelling Parameters
Project number:                            20210121
Street Address:                16 Rene St, Noosaville
Locality:                      Noosaville, Noosa Shire Council

Storm Injector Configuration

Page 26

Modelling Parameters
Project number:                          20210121
Street Address:              16 Rene St, Noosaville
Locality:                    Noosaville, Noosa Shire Council

ARR Datahub Parameters
Input Data Information                            Storm Losses                      Temporal Patterns
Latitude:                              -26.413755 Storm Initial Losses          27 Code                            EC North
Longitude:                             153.042472 Storm Continuing Losses       2.6

WBNM Parameters
Catchments
                             Existing Site            Developed Site                                                  Existing Site          Developed Site
Area                                         0.013                     0.013       Non-Linearity Exponent                              0.77                     0.77
Fraction Impervious                          47.39                      67.3       Initial Loss (Base*)                                   27                      27
Lag Parameter                                   1.6                       1.6      Continuing Loss                                       2.6                     2.6
Impervious Lag Factor                           0.1                       0.1      Impervious Initial Loss                                 0                       0
                                                                                   * Initial loss used in models is reduced by pre-burst storm event

OSD
Roof Tank                                                                          Biogarden
Storage                      H                        S                            Storage                        H                          S
                         0                       0                       0                                     0                        0                          0
                         1                       1                0.00375                                      1 0.6**                                         0.009
                         2                       2                   0.075                                     2                       0.8                    0.0019
                                                                                                               3                         1                    0.0029
                                                                                   ** assumed media porosity of 0.3

Low Flow Diameter                               25 mm                              Low Flow Diameter                                 100 mm
Low Flow Elevation                               1m                                Low Flow Elevation                                   0m
High Flow Diameter                              90 mm                              Weir Length                                        2.4 mm
High Flow Elevation                            1.9 m                               Weir Elevation                                     0.8 m
Pervious Flow to OSD                             0%                                Weir Coefficient                                  1.66
Impervious Flow to OSD                       14.54 %                               Pervious Flow to OSD                                 0%
                                                                                   Impervious Flow to OSD                           29.54 %

Page 27

Rational Method Calculations
Project number:                                    20210121                                                                        Calculations:                                       B. Parry
Street Address                                     16 Rene St                                                                      Date:                                               7/10/2021
Locality:                                          Noosaville, Noosa Shire Council




Site Area Composition

Existing Site Roof Area:                                                   350.5 m2                                                Developed Site Roof Area:                                         477.62 m2
Existing Site Paved Area:                                                 265.19 m2                                                Developed Site Paved Area:                                        396.28 m2
Existing Site Total (Impermeable):                                        615.69 m2                                                Developed Site Total (Impermeable):                                873.9 m2
Existing Site Total (Permeable):                                       683.3445 m2                                                 Developed Site Total (Permeable):                               425.1345 m2

Total Site Area:                                                      1299.0345 m2                                                 Increase Impermeable Area:                                       258.210 m2
                                                                                                                                                                                                      0.026 Ha.


Time of Concentration

Existing Site                                                                                                                      Proposed Site

                                              tc                             5.0 mins                                                                                             tc                   5.00 mins



Rational Method - Peak Flow Calculation

Existing Site                                                                                                                      Proposed Site
                                   Area (Ha.)                              0.130 Ha.                                                                                       Area                       0.130 Ha.
                                           fi                              0.474                                                                                              Fi                      0.673
                                         1                                                                                                                                   1
                                             I10                          80.987 mm/hr                                                                                           I10                 80.987 mm/hr
                                          C10                               0.79                                                                                             C10                       0.83




A.E.P                                              Fy                              Cy            Iy            Qy (m3/s)           A.E.P                                               Fy                     Cy            Iy            Qy (m3/s)
                                   63.2% AEP                                 0.8         0.636        135.16               0.031                                       63.2% AEP                        0.8         0.668        135.16               0.033
                                    50% AEP                                 0.85         0.676        152.60               0.037                                         50% AEP                       0.85         0.709        152.60               0.039
                                    20% AEP                                 0.95         0.755        208.19               0.057                                         20% AEP                       0.95         0.793        208.19               0.060
                                    10% AEP                                    1         0.795        245.25               0.070                                         10% AEP                          1         0.835        245.25               0.074
                                      5% AEP                                1.05         0.835        280.13               0.084                                          5% AEP                       1.05         0.876        280.13               0.089
                                      2% AEP                                1.15         0.914        325.91               0.107                                          2% AEP                       1.15         0.960        325.91               0.113
                                      1% AEP                                 1.2         0.954        360.79               0.124                                          1% AEP                        1.2         1.001        360.79               0.130

Page 28

Rational Method Calculations
Project number:                            20210121                                                                            Calculations:                             B. Parry
Street Address                             16 Rene St                                                                          Date:                                     7/10/2021
Locality:                                  Noosaville, Noosa Shire Council




Validation of Pre-Development Model                                                                                            Pre / Post Comparison
A.E.P                                      Q (m3/s) - WBNM                 Q (m3/s) - Rational           Differential          A.E.P                                     Qy Pre (m3/s)           Qy Post (m3/s)           Qchange (m3/s)    Qchange (%)
                               63.2% AEP                           0.031                         0.031                    0%                                 63.2% AEP                   0.031                    0.034             0.003                 10%
                                50% AEP                            0.038                         0.037                   -3%                                  50% AEP                    0.038                    0.040             0.002                  5%
                                20% AEP                            0.062                         0.057                   -8%                                  20% AEP                    0.062                    0.065             0.003                  5%
                                10% AEP                            0.077                         0.070                   -9%                                  10% AEP                    0.077                    0.082             0.005                  6%
                                  5% AEP                           0.093                         0.084                  -10%                                    5% AEP                   0.093                    0.094             0.001                  1%
                                  2% AEP                           0.106                         0.107                    1%                                    2% AEP                   0.106                    0.108             0.002                  2%
                                  1% AEP                           0.116                         0.124                    7%                                    1% AEP                   0.116                    0.121             0.005                  4%




Validation of Post-Development Model                                                                                           Pre / Post (OSD) Comparison
A.E.P                                      Q (m3/s) - WBNM                 Q (m3/s) - Rational           Differential          A.E.P                                     Qy Pre (m3/s)           Qy OSD (m3/s)            Qchange (m3/s)    Qchange (%)
                               63.2% AEP                           0.034                         0.033                   -3%                                 63.2% AEP                   0.031                    0.030            -0.001                 -3%
                                50% AEP                            0.040                         0.039                   -3%                                  50% AEP                    0.038                    0.036            -0.002                 -5%
                                20% AEP                            0.065                         0.060                   -8%                                  20% AEP                    0.062                    0.059            -0.003                 -5%
                                10% AEP                            0.082                         0.074                  -10%                                  10% AEP                    0.077                    0.074            -0.003                 -4%
                                  5% AEP                           0.094                         0.089                   -5%                                    5% AEP                   0.093                    0.085            -0.008                 -9%
                                  2% AEP                           0.108                         0.113                    5%                                    2% AEP                   0.106                    0.099            -0.007                 -7%
                                  1% AEP                           0.121                         0.130                    7%                                    1% AEP                   0.116                    0.107            -0.009                 -8%

Page 29

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

IEDs Frequent and Infrequent Storm Events vw
Project number: 20210121 ae
street Address: 16 Rene St, Noosaville aT
Locality: Noosaville, Noosa Shire Council
Source Http://www bom gov.au/water/designRainfalls/revised-ifd/
Location: Latitude
26.4138,
Longitude
153.0425
Date obtained: 07/10/2021
Annual Exceedance Probability (AEP) Annual Exceedance Probability (AEP) + 20% climate change increase
Duration 63% 50% 20%" 10% 5% 2% 1% 63% 50% 20%" 10% 5% 2% 1%
Lmin 170 193 262] 306| 349] 403} aaa] 185.3 210.37 285.58 333.54 380.41 439.27 483.96
2 min 144 164 227] 270) 312] 369] aaa) 156.96| 178.76| 247.43 294.3 340.08 402.21 451.26
3 min 136 154 212] 252] 230) 342] 381] 148.24] 167.86| 231.08 274.68 316.1 372.78 415.29
4 min 129 147 201) 237] 272! 319] 354] 140.61 160.23 219.09 258.33 296.48 347.71 385.86
5 min 124.00 140.00 191.00 225.00 257.00 299.00 331.00 135.16 152.60 208.19 245.25 280.13 325.91 360.79
10 min 101 114 154 180 204] 235| 258] 110.09 124.26| 167.86| 196.2) 222.36 256.15 281.22
15 min 85.7 96.9 131 152 173 199 217] 93.413 105.621 142.79 165.68| 188.57 216.91 236.53
20 min 74.8 84.6 14 133 151 174 191 81.532 92.214 124.26| 144.97 164.59 129.66| 208.19
25 min 66.7 75.4 102 119 136 157 172 72.703 82.186 111.18| 123.71 148.24] 171.13 187.48|
30 min 60.4 68.3 92.6 109 124 143 158 65.836 74.447 100.934] 118.81 135.16| 155.87 172.22
45 min 477 54.2 74 37.2 100 117 129 51,993 59.078 80.66 95.048 109 127.53 140.61
TL hour 40.1 45.6 62.7 74.3 35.5 100 112 43.709 49.704 68.343 80.987 93.195 109 12.08|
1.5 hour B11 35.5 49.5 59] 68.4 a1 90.7 33.899 38.695 53.955 64.31 74.556 38.29 98.863
2 hour 26| 29.8 418 50.1 58.3 69.5 78.1 28.34 32.482 45.562 54,609 63.547 75.755 85.129
3 hour 20.2 23.2 33 39.8 46.7 56| 63.2 22.018 25.288 35.97 43.382 50.903 61.04 68.888
4.5 hour 15.7 18.2 26.2 318 37.4 45.1 51.2 17.113 19.838| 28.558 34.662 40.766 49.159 55.808
[6 hour 13.2 15.3 22.2 27.1 32, 38.7 aa 14.388] 16.677 24.198 29.539 34.88 42.183 47.96
9 hour 10.3 2 17.7 21.6 25.7 312 35.6 11.227 13.08| 19.293 23.544 28.013 34.008 38.804
12 hour 8.68 10.2 15 18.4 21.9 26.7 30.5 9.4612 1.118] 16.35] 20.056 23.871 29.103 33.245
18 hour 6.78 7.96 138 146 175| 21.4 24.5 7.3902 8.6764 12.862 15.914] 19.075 23.326 26.705
24 hour 5.67 6.65 9.93 12.3 1438 18.2 20.9 6.1803 7.2485 10.8237 13.407 16.132 19.838| 22.781
30 hour 491 5.76 8.63 10.7 12.9 15.9) 18.4 5.3519 6.2784 9.4067 11.663 14.061 17.331 20.056
36 hour 4.35 5.11 7.66 9.55 115 143 165| 4.7415 5.5699 3.3494 10.4095 12.535 15.587 17.985
48 hour 3.57 4.19 63 7.88 9.55 11.9) 13.9) 3.8913 4.5671 6.867 8.5892 10.4095 12.971 15.151
[72 hour 2.66 3.12 47 5.91 72 9.05 10.6 2.8994 3.4008 5.123 6.4419 7.848 9.8645 11.554]
{96 hour 2.14 25 3.7 4.75 5.8 7.33 8.6 2.3326 2.725 4.1093 5.1775 6.322 7.9897 9.374
120 hour 18 2.1 3.16 3.98 4.86 6.15 7.23 1.962] 2.289 3.4444 4.3382 5.2974 6.7035 7.8807
144 hour 155 1.82] 2.72 3.43 4.19 5.29 62 1.6895 1.9838| 2.9648 3.7387 4.5671 5.7661 6.758
168 hour 137] 16 24 3.02 3.68 4.62 5.41 1.4933 1744] 2.616 3.2918 4.0112 5.0358 5.8969

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 30

Appendix C
Bioretention Inspection Checklist




Project number 20210121
File RECOR Preliminary Stormwater Management Report - 20210121.docx, 2021-10-07                                 Page 23 of 26
Revision 0

P +61 7 5211 1003                A 37 Mary St, Noosaville Qld 4566                E [email protected]   recorconsulting.com

Page 31

                                      BIORETENTION SWALE MAINTENANCE CHECKLIST
                                                                    3 to 6        Date of
  Inspection Frequency:
                                                                    monthly       Visit:
  Location:
  Description:
  Site Visit by:
  INSPECTION ITEMS                                                        Y          N         ACTION REQUIRED (DETAILS)
  Sediment accumulation at inflow points?
  Litter within swale?
  Erosion at inlet or other key structures?
  Traffic damage present?
  Vegetation condition satisfactory (density, weeds
  etc)?
  Replanting required?
  Mowing required?
  Clogging of drainage points?
  Evidence of ponding?
  Set down from kerb still present?
  Damage/vandalism to structures?
  Surface clogging visible?
  Drainage system inspected?
  Remulching of trees and shrubs required?
  Soil additives or amendments required?
  Pruning and/ or removal of dead or diseased
  vegetation required?
  Resetting of system required?
                                                                   COMMENTS




Project number 20210121
File RECOR Preliminary Stormwater Management Report - 20210121.docx, 2021-10-07                                    Page 24 of 26
Revision 0


P +61 7 5211 1003                          A 37 Mary St, Noosaville Qld 4566        E [email protected]       recorconsulting.com

Page 32

Appendix D
Noosa Council Works Code Checklist




Project number 20210121
File RECOR Preliminary Stormwater Management Report - 20210121.docx, 2021-10-07                                Page 25 of 26
Revision 0


P +61 7 5211 1003                          A 37 Mary St, Noosaville Qld 4566      E [email protected]    recorconsulting.com

Page 33

Stormwater drainage design Table 9.4.8.3 Criteria for assessment (part)
                         Performance Outcomes                                                                                  Acceptable Outcomes                                                                                                               Response
Stormwater drainage design
PO1                                                                             AO1
The development and its stormwater management system is planned and             A stormwater management plan is prepared consistent with PSP6 Engineering Design Standards - Roads, drainage and           Complies - Refer to the SWMP that has been designed to be consistent with the PSP6 Engineering Design Standards -
designed having regard to:                                                      earthworks.                                                                                                                Roads, drainage and earthworks and QUDM.

   1. the natural features of the site;
   2. the need to avoid impacts and potential risks to ecologically important
   areas;
   3. the likely effectiveness of erosion and sediment control and stormwater
   drainage measures during rainfall events during and post construction; and
   4. the need to protect environmental values and water quality of receiving
   waters both during and post construction.

PO2                                                                             AO2.1
                                                                                Stormwater drainage planning, design and construction is in accordance with PSP6 Engineering Design Standards -
Stormwater drainage infrastructure is planned, designed and constructed to:                                                                                                                                To be complied with at detailed design in conjunction with the SWMP
                                                                                Roads, drainage and earthworks and the latest version of the Queensland Urban Drainage Design Manual.


   1. incorporate allowance for increased flood risk and tidal inundation through
                                                                                  AO2.2
   pipework as a result of cilmate change and sea level rise;
                                                                                  The stormwater drainage system connects to a lawful point of discharge in accordance with PSP6 Engineering Design
   2. ensure the development is adequately drained; and                                                                                                                                                    Complies - Stormwater drainage connects into existing Council owned stormwater drainage line
                                                                                  Standards - Roads, drainage and earthworks.
   3. ensure stormwater is managed and lawfully discharged without altering
   stormwater drainage characteristics external to the site.
                                                                                  AO2.3
                                                                                  Stormwater flows discharging from the development are demonstrated to be consistent with pre-development                 Complies - Refer to SWMP. The increase in flows arising from the development have been mitigated to pre-development
                                                                                  characteristics.                                                                                                         levels.

                                                                                AO2.4
                                                                                Development provides for the management of stormwater to incorporate appropriate allowance for climate change
                                                                                                                                                                                                           Complies - A 20% increase to rainfall intensities has been considered to account for climate change impacts. Refer to
                                                                                impacts (including rainfall intensity and sea level rise), in accordance with PSP6 Engineering Design Standards – Roads,
                                                                                                                                                                                                           SWMP.
                                                                                Drainage and Earthworks.

Page 34

PO3                                                                                 AO3.1
Stormwater drainage infrastructure conveys run-off in a manner that allows
                                                                                    Stormwater drainage infrastructure meets the desired standards of service for roads functionality set out in PSP6       Complies - The site captures and mitigates new run-off to pre-existing levels, and discharges into an existing Council
roads to deliver desired standards of service appropriate to the local conditions
                                                                                    Engineering Design Standards - Roads, Drainage and Earthworks.                                                          Stormwater network. Existing infrastructure will no be impacted by the development.
and local stormwater drainage characteristics.

PO4                                                                                 AO4.1
Stormwater infrastructure is compatible with existing infrastructure, allows for
                                                                                    The location, design and construction of stormwater drainage structures is in accordance with PSP6 Engineering Design
easy access for the ongoing maintenance by Council, is cost effective across its                                                                                                                            To be complied with at detailed design in conjunction with the SWMP
                                                                                    Standards - Roads, drainage and earthworks.
design life.

                                                                                    AO4.2
                                                                                    Where infrastructure is located on private land an easement is dedicated over the infrastructure in accordance          Complies - The stormwater solution proposes to connect into an existing drainage system within an easement through
                                                                                    with PSP6 Engineering Design Standards - Roads, drainage and earthworks.                                                the property.

                                                                                    AO4.3
                                                                                    Any alterations or repairs to infrastructure as a result of the development are made at no cost to Council.             To be complied with at detailed design in conjunction with the SWMP

                                                                                    AO4.4
                                                                                    Development avoids stormwater inflow and infiltration to the sewer infrastructure network.                              Complies - no stormwater discharged to sewer network.

                                                                                    AO4.5
                                                                                    Stormwater infrastructure is designed to minimise maintenance costs and the requirement for specialized equipment for Complies - Maintenance of the stormwater solution is the responsibility of the site owner and no additional
                                                                                    maintenance techniques.                                                                                               infrastructure is to be maintained by Council.

PO5                                                                              AO5.1
Stormwater drainage infrastructure is aligned to avoid crossing waterways,
wetlands, drainage lines and ecological important areas, or where it is          Stormwater drainage infrastructure avoids crossing waterways, wetlands drainage lines and ecologically important areas
                                                                                                                                                                                                        Complies - Refer to stormwater layout plan. No waterways or ecologically important areas are impacted.
demonstrated this is unavoidable, disturbed areas are reinstated and revegetated or follows the edge of existing disturbed areas.
upon completion of works.

                                                                                    AO5.2
                                                                                    Stormwater drainage infrastructure is co-located with other infrastructure within a combined utility corridor where
                                                                                                                                                                                                            N/A - Stormwater is wholly contained within the proposed site.
                                                                                    appropriate.

                                                                                    AO5.3
                                                                                    Temporary vehicular crossings of waterways must be designed and constructed to be consistent with the current
                                                                                                                                                                                                            N/A - No waterways are impacted by the proposed development.
                                                                                    International Erosion Control Association Best Practice Book Series.

Page 35

Stormwater quality and protection of receiving waters Table 9.4.8.3 Criteria for assessment (part)
                          Performance Outcomes                                                                                     Acceptable Outcomes
Stormwater quality and protection of receiving waters
PO6                                                                                 AO6.1
Development is located, designed, constructed and operated to protect and
                                                                                    Stormwater runoff discharging into High Ecological Value waters as a result of development causes no increase in gross
enhance environmental values and water quality of waterways, wetlands, lakes,                                                                                                                                   N/A - stormwater does not discharge into high ecological value waters.
                                                                                    pollutants, total suspended solids, total phosphorous or total nitrogen compared to a pre-development scenario.
ground waters and drainage systems.

                                                                                    AND
Editor’s note: Environmental values of waters and water quality objectives are
prescribed in Schedule 1 of the Environmental Protection (Water) Policy 2009 and
are identified on the State Planning Policy Interactive Mapping System.
                                                                                    AO6.2
                                                                                    All stormwater runoff is treated to achieve maximum removal of nutrients, gross pollutants and suspended solids as
                                                                                    determined by cost to efficiency ratios. (e.g. bioretention basins must be sized to achieve at least 80% reduction in total
                                                                                                                                                                                                                Complies - refer to SWMP Quality section.
                                                                                    suspended solids, 60% reduction in total phosphorous, 45% reduction in total nitrogen and 90% reduction in gross
                                                                                    pollutants >5mm).

                                                                                    OR

                                                                                    AO6.3
                                                                                    Developments achieve a minimum 3 drop rating consistent with the Water by Design Living Waterways Scoring Guide
                                                                                                                                                                                                                N/A
                                                                                    (Healthy Land and Water).


                                                                                    Editor’s note— PSP6 Engineering Design Standards - Roads, Drainage and Earthworks provides guidance on stormwater
                                                                                    design and modelling requirements.

PO7                                                                                 AO7.1

                                                                              Water quality treatment systems are designed to be integrated into the landscape consistent with the technical design
Water quality treatment systems use natural processes and materials, whenever
                                                                              guideline published by Healthy Land and Water Water by Design for the feature. (eg. For Bioretention Basins:
possible, and are integrated into development to enhance biodiversity and                                                                                                                           Complies - Refer to SWMP for details.
                                                                              Bioretention Technical Design Guidelines (October 2014) and for Wetland Systems the Wetland Technical
landscape benefits.
                                                                              Design Guideline (May 2017).

PO8                                                                                 AO8.1
Water quality treatment infrastructure to be dedicated as public assets are
                                                                                    Detailed life cycle costing is provided for the entire treatment train system including replacement costs of asset parts.   N/A - no water quality treatment infrastructure is to be dedicated to council.
proven to be suitable for its use and of a cost effective and efficient standard.


                                                                                    AO8.2 Treatment systems dedicated as public assets are designed to minimise maintenance, renewal and adaption costs
                                                                                                                                                                                                        N/A - no water quality treatment infrastructure is to be dedicated to council.
                                                                                    and the requirement for specialised equipment, material or maintenance techniques.

                                                                                    AO8.3
                                                                                    Vegetated stormwater management systems to be dedicated as public assets are established and maintained during the
                                                                                    maintenance period to ensure optimal vegetated growth and that the functional elements of the system achieve the   N/A - no water quality treatment infrastructure is to be dedicated to council.
                                                                                    design function at the end of the maintenance period.

PO9                                                                                 AO9.1
                                                                                    Free draining inlets and outlets are provided to ensure that waters do not pond for more than 24 hours.                     To be complied with at detailed design in conjunction with the SWMP.
Treatment systems are designed to eliminate or minimise health, safety and
aesthetic hazards, including risks associated with insect breeding, odour and
public safety.
                                                                                    AO9.2
                                                                                    Developments are designed to eliminate retaining walls in excess of 0.8m for any water quality treatment device.            To be complied with at detailed design in conjunction with the SWMP.

Page 36

Hydrology and waterway stability Table 9.4.8.3 Criteria for assessment (part)
                           Performance Outcomes                                                                                  Acceptable Outcomes
Hydrology and waterway stability
PO10                                                                              AO10

Development prevents increased bed and bank erosion and sedimentation in
receiving waterways by avoiding changes in low rate, peak flow run-off and flow   The development is designed to:                                                                                          Complies - Refer to SWMP for details.
duration.

                                                                                     1. limit the peak 1 year ARI event discharge within the receiving waterway to the pre-development peak 1 year
                                                                                     discharge;
                                                                                     2. maximise pervious areas by using pervious alternatives for otherwise impervious areas wherever possible;
                                                                                     3. provide for capture and reuse of stormwater for non-potable purposes for gardening, toilet flushing, laundry and
                                                                                     hot water supply uses;
                                                                                     4. incorporate appropriate detention features; and
                                                                                     5. incorporate natural channel design principles



                                                                                  Editor’s note: The Sustainable Building Design Code includes requirements for stormwater capture and reuse.


PO11                                                                              AO11.1
                                                                                  The design and construction of a natural channel or natural channel rehabilitation works are in accordance with the
Water sensitive urban design principles are applied to achieve multifunctional
                                                                                  Natural Channel Design Guidelines (Brisbane City Council) having regard to local topography, geology and                 N/A - No channels are proposed or impacted upon by the proposed development.
design of waterways, wetlands and drainage lines that provide for:
                                                                                  geomorphology.

   1. stormwater conveyance that uses natural channel design;
   2. protection of landscape features and ecological important areas including
   terrestrial and aquatic habitat;
   3. aesthetic and passive recreation values;                                    AO11.2
   4. flood management and conveyance of external catchment stormwater            Landscape features, plant species and habitat types used in stormwater conveyance channels are complementary to the
                                                                                                                                                                                                      To be complied with at detailed design in conjunction with the SWMP.
   through the development;                                                       local context and natural waterways.
   5. landscaping that incorporates local native species; and
   6. bed and bank stability.

                                                                                  AO11.3
                                                                                  Bank and bed stability and planting densities result in a stable channel over the long term and minimal potential for pest
                                                                                                                                                                                                             To be complied with at detailed design in conjunction with the SWMP.
                                                                                  plant species.

                                                                                  AO11.4
                                                                                  Water Sensitive Design measures are incorporated into the development, as detailed in the document Water Sensitive
                                                                                  Designs small improvements, new ideas, concepts and sketch designs for stormwater filtration systems (Healthy            Complies - Refer to SWMP for water sensitive design measures incorporated into the solution.
                                                                                  Waterways Water by Design).

                                                                                  AO11.5
                                                                                  Floodplain management is designed in accordance with the Framework for the Integration of Flood and Stormwater
                                                                                  Management into Open Space published by Healthy Waterways Water by Design (version current at the time of                N/A - Noosa Council mapping indicates that no flood plains are located within the development area.
                                                                                  development application)

Page 37

PO12                                                                           AO12.1
                                                                               Where run-off from or within the site passes through or drains to natural channels, waterways or wetlands,
Development protects in-stream ecology by maintaining pre-development low                                                                                                                         N/A - Development will connect and drain into existing stormwater infrastructure and does not make use of natural
                                                                               development protects in-steam ecology by maintaining pre-development low flow discharge regimes in accordance with
flow discharge regimes and maintaining fish passages.                                                                                                                                             channels or waterways.
                                                                               the frequent flow management objectives in PSP6 Engineering Design Standards - Roads, drainage and earthworks


                                                                               AO12.2
                                                                               Instream structures such as roads, bridges, culverts, and other stormwater infrastructure do not cause barriers to fish
                                                                                                                                                                                                         N/A - No instream structures are proposed
                                                                               passage and facilitate the movement of terrestrial and aquatic fauna along waterway corridors.


                                                                               AO12.3
                                                                               Benthic substrate retains a continuous grade with the direction of flow consistent with the natural bed profile.          To be complied with at detailed design in conjunction with the SWMP.

PO13                                                                           AO13.1
Development is designed and constructed to maintain surface and ground water
                                                                              The location and form of stormwater discharge points do not alter the pre-development hydrology of receiving surface       Complies - Discharge from site is mitigated to pre-development levels and discharges into existing stormwater
balances that sustain the environmental values of water dependent ecosystems,
                                                                              water or groundwater.                                                                                                      infrastructure within the site.
including downstream aquatic, riparian, wetland and terrestrial ecosystems.


                                                                               AO13.2
                                                                               Developments located on groundwater recharge or discharge areas are designed and managed in accordance with a
                                                                               groundwater recharge and discharge management plan prepared by a suitably experienced and qualified groundwater
                                                                                                                                                                                                         N/A - Development is not located on groundwater recharge or discharge areas.
                                                                               hydrologist. The groundwater recharge or discharge must demonstrate that the development does not affect
                                                                               groundwater balances beyond the property boundaries.


                                                                               Editor's Note— PSP6 Engineering Design Standards - Roads, drainage and earthworks provides guidance on prepare a
                                                                               groundwater recharge and discharge plan.

Page 38

Construction and establishment of stormwater management systems Table 9.4.8.3 Criteria for assessment (part)
                         Performance Outcomes                                                                                        Acceptable Outcomes
Construction and establishment of stormwater management systems
PO14                                                                               AO14.1
Construction methods provide for appropriate controls to avoid entry and           An erosion and sediment control plan prepared in accordance with the International Erosion Control Association Best
transport of litter, sediment, and associated prescribed water contaminants into   Practice Books demonstrates that the capture and release of stormwater achieves the design objectives listed in Table A: To be complied with at detailed design in conjunction with the SWMP.
receiving waters.                                                                  Construction phase – stormwater management design objectives of the State Planning Policy (Appendix 2 ).
Editor's note— Water contaminants are prescribed in the Environmental              Editor’s note— PSP6 Engineering Design Standards - Roads, drainage and earthworks provides guidance on
Protection Act 1994.                                                               requirements for preparing an Erosion Management Plan.

                                                                                   AO14.2
                                                                                   Construction works are designed and managed to restrict the extent of clearing and soil exposure to the minimum
                                                                                                                                                                                                               To be complied with at detailed design in conjunction with the SWMP.
                                                                                   necessary for access, and safe construction at any one time.

                                                                                   AO14.3
                                                                                   For buildings:
                                                                                      1. upstream runoff is diverted around the construction site;                                                             To be complied with at detailed design in conjunction with the SWMP.
                                                                                      2. sediment barriers are provided downslope of disturbed areas to prevent sediment washing into gutters, drains
                                                                                      and waterways , wetlands or drainage lines either on or off the site; and
                                                                                      3. temporary or permanent downpipes are connected to the stormwater system before laying the roof; or
                                                                                      4. localised erosion is avoided by directing flow from downpipes over non-erosive areas.

                                                                                   AO14.4
                                                                                   Chemical flocculants used as part of an erosion and sediment control plan do not harm the environmental values within
                                                                                                                                                                                                         To be complied with at detailed design in conjunction with the SWMP.
                                                                                   receiving waters.

                                                                                   AO14.5
                                                                                   Appropriately sized litter containment areas, with provision for sorting recyclables are provided for the type of litter
                                                                                                                                                                                                               To be complied with at detailed design in conjunction with the SWMP.
                                                                                   expected to be generated onsite.


Wastewater management and effluent disposal Table 9.4.8.3 Criteria for assessment (part)
                         Performance Outcomes                                                                                        Acceptable Outcomes

Wastewater management and effluent disposal
PO15                                                                               AO15
Development does not discharge wastewater unless it can be
demonstrated to not compromise environmental values of waters and                  Wastewater (non-sewage) generated from the development is collected and contained on-site, and is:
water quality objectives.
Editor’s Note— Environmental values of waters and water quality
objectives are prescribed in Schedule 1 of the Environmental Protection               1. lawfully disposed to sewer; or                                                                                        To be complied with at detailed design.
(Water) Policy 2009.
                                                                                      2. transferred off-site for treatment/disposal to an appropriately licenced facility;
                                                                                      3. reused on-site in a closed-cycle irrigation scheme, industrial processes, washing or cleaning or other purpose; or
                                                                                      4. treated to meet the drinking water supply environmental values prior to release.


                                                                                   Editor’s Note —The Plumbing and Drainage Act 2003 sets out requirements for wastewater management.
PO16                                                                               AO16
On-site effluent treatment and disposal systems are designed, constructed and
managed to not compromise the environmental values of waters and water             An onsite effluent system and disposal area is:                                                                             To be complied with at detailed design.
quality objectives.
                                                                                      1. not located on a slope greater than 1 in (10%);
                                                                                      2. not located at or below the 1% annual exceedance probability (AEP flood event);
                                                                                      3. not located within a riparian buffer area mapped on a Biodiversity, Waterways and Wetlands Overlay Map; and
                                                                                       4. setback 400 metres minimum from the full supply level of Lake Macdonald.
                                                                                   Editor’s Note— The Plumbing and Drainage Act 2003 sets out requirements for on-site effluent treatment and
                                                                                   disposal. The Queensland Plumbing and Wastewater Code and associated guidelines are used to confirm the suitability
                                                                                   of each site to accommodate an on-site sewerage facility; or where a centrally located group collection treatment system
                                                                                   is proposed, confirmation as to the suitability of the designated site to accommodate the on-site sewerage facility.
                                                                                   Additionally, where the combined total peak design capacity of effluent treatment is less than 21 equivalent persons, the
                                                                                   design of the system achieves a low to medium risk classification in accordance with Seqwater’s Land Use Risk Tool for
                                                                                   onsite sewerage facilities.

Page 39

Document prepared by

RECOR Pty Ltd
ABN 89 647 469 707
37 Mary Street
Noosaville, QLD 4566
Australia

T +61 7 5211 1003
E [email protected]
W recorconsulting.com




Project number 20210121
File RECOR Preliminary Stormwater Management Report - 20210121.docx, 2021-10-07                                Page 26 of 26
Revision 0


P +61 7 5211 1003                          A 37 Mary St, Noosaville Qld 4566      E [email protected]    recorconsulting.com

Page 40

a

G

STRATEGIC

STRATEGIC SOLUTIONS,
CREATIVE THINKING

rgstrategic.com.au

 

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.