Att 2 SWMP
Table 3.2 Existing and proposed mitigated site peak discharge rates
16 Rene Street
Qchange
A.E.P Qexisting Qproposed Qchange (%)
(m³/s) (m³/s) (m³/s)
63.20% 0.031 0.030 -0.001 -3%
50% 0.038 0.036 -0.002 -5%
20% 0.062 0.059 -0.003 -5%
10% 0.077 0.074 -0.003 -4%
5% 0.093 0.085 -0.008 -9%
2% 0.106 0.099 -0.007 -7%
1% 0.116 0.107 -0.009 -8%
Figure 3.3 – Mitigated post development site critical storm rainfall hydrographs showing peak flow rates
As the total peak flows are equal to or below the existing site conditions, the development suitably
controls the peak flow storm events from the development.
Project number 20210121
File RECOR Preliminary Stormwater Management Report - 20210121.docx, 2021-10-07 Page 12 of 26
Revision 0
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.