Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Att 2 SWMP

of 40

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                                   Figure 4.3 - MUSIC Stormwater Treatment Train




                    4.2.1.1.             Rainwater Tanks
The rainwater tanks connected to the source nodes representing their drained catchments. Each of
the tanks to be provided is modelled as a 3kL storage volume, with 1.5kL allocated for re-use
(assumed to be full at beginning of the modelling) and the remaining portion being for attenuation
capacity.




                       Figure 4.4 – 7.5kL Rainwater Attenuation Tank node configuration



Project number 20210121
File RECOR Preliminary Stormwater Management Report - 20210121.docx, 2021-10-07                                 Page 16 of 26
Revision 0

P +61 7 5211 1003                A 37 Mary St, Noosaville Qld 4566                E [email protected]   recorconsulting.com
Log in to download the original file

Att 2 SWMP.pdf · 3.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.