Original source · versioned page text
Att 2 SWMP
2.3.2 Stormwater Catchments
A schematic layout plan of the proposed development and its drainage catchments as described in
the previous sections is shown below in Figure 2.3 – Proposed Catchments Plan.
Figure 2.3 – Proposed Catchments Plan
2.4. Flood Considerations
Review of the Noosa Shire Council Intramaps flood layers including the Flood Hazards Overlay has
identified that the site is located outside of any flood or inundation areas within the locality indicating
it is not expected that that the proposed development will be subject to flooding.
2.5. Acid Sulphate Soils
Review of the Noosa Shire Council Intramaps Land Subject to Acid Sulphate Soils Overlay identifies
that the site is located within Area 2 of the overlay, for lands between 5m AHD and 20m AHD. Acid
Sulphate Soil testing is typically required in areas with surface levels less than 5.0m Australian Height
Datum (AHD) as stated in the State Planning Policy 2017. The requirements for acid sulphate testing
are to be assessed by a geotechnical engineer prior to the detailed design stage of this proposed
development.
Project number 20210121
File RECOR Preliminary Stormwater Management Report - 20210121.docx, 2021-10-07 Page 7 of 26
Revision 0
P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.