Council archive · source document
Geotech Report Reference Document OPW19-0239 · OPW19/0239
Very large file (10.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Gympie Terrace Noosaville Pty Ltd Table of Contents 1.0 INTRODUCTION .................................................................................................................................... 1 2.0 PROPOSED DEVELOPMENT ............................................................................................................... 1 3.0 SITE DESCRIPTION .............................................................................................................................. 1 4.0 METHOD OF INVESTIGATION ............................................................................................................. 2 4.1 Review of available information .............................................................................................................. 2 4.2 Fieldwork................................................................................................................................................. 2 4.3 Geotechnical Laboratory Testing............................................................................................................ 2 5.0 RESULTS OF INVESTIGATION ............................................................................................................ 3 5.1 Published Geological Information & Acid Sulfate Soil Information ......................................................... 3 5.2 Subsurface Conditions............................................................................................................................ 4 5.3 Groundwater ........................................................................................................................................... 4 6.0 GEOTECHNICAL COMMENTS & RECOMMENDATIONS ................................................................... 5 6.1 Site Preparation and Trafficability ........................................................................................................... 5 6.2 Excavatability & Stability ......................................................................................................................... 5 6.2.1 Temporary Support & Dewatering ...................................................................................................... 5 6.3 Material Suitability for Re-use ................................................................................................................. 6 6.4 Basement Design ................................................................................................................................... 6 6.5 Foundations ............................................................................................................................................ 6 6.5.1 High Level Footings ............................................................................................................................ 6 6.5.2 Piles .................................................................................................................................................... 7 6.5.3 General ............................................................................................................................................... 7 6.6 Retaining structures ................................................................................................................................ 8 6.7 Drainage ................................................................................................................................................. 8 6.8 Aggressivity of soils ................................................................................................................................ 8 7.0 ACID SULFATE SOIL ASSESSMENT ................................................................................................... 9 7.1 ASS Summary ........................................................................................................................................ 9 8.0 LIMITATIONS ....................................................................................................................................... 10 C1.0 ACID SULFATE SOILS INVESTIGATION METHOD AND RESULTS ................................................ 15 C1.1 Laboratory testing ................................................................................................................................. 15 C1.2 Groundwater Quality Analysis .............................................................................................................. 15 C1.3 Preliminary Screening........................................................................................................................... 16 C1.4 Quantitative Soils Analysis ................................................................................................................... 16 Tables Table 1: Summary of laboratory testing............................................................................................................. 3 Table 2: Summary of Groundwater Conditions (14 November 2018) ............................................................... 4 Table 3: Retaining structure design parameters. .............................................................................................. 8 Table 4: Liming Rates ........................................................................................................................................ 9 J000799-002-R-Rev0 Page ii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Geotech Report Reference Document OPW19-0239.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.