Council archive · source document
Geotech Report Reference Document OPW19-0239 · OPW19/0239
Very large file (10.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Gympie Terrace Noosaville Pty Ltd 1.0 INTRODUCTION This report presents the results of a geotechnical and acid sulfate soils (ASS) investigation carried out by Core Consultants Pty Ltd (Core) for a proposed unit development at 217 to 219 Gympie Terrace, Noosaville. The work was carried out for Gympie Terrace Noosaville Ltd, in accordance with our proposal Q001837-001- L-Rev0, dated 26 October 2018. 2.0 PROPOSED DEVELOPMENT The proposed development is to comprise a three-storey apartment building with a single level basement carpark (excavation depth of approximately 2 m). A concept sketch of the proposed development is shown in Image 1. Column loads are anticipated to be about 2000 kN to 2500 kN. Image 1: Concept sketch of proposed development (Image from Chris Clout Design, Dwg No. C4.0). 3.0 SITE DESCRIPTION The site is located at 217 to 219 Gympie Terrace, Noosaville; covering a total area of approximately 0.11 hectares. The site was generally flat and clear at the time of our investigation, comprising short grass and a few small to medium sized trees located in the south east corner. Site conditions at the time of our investigation are shown in Photograph 1. J000799-002-R-Rev0 Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Geotech Report Reference Document OPW19-0239.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.