Concurrence agency response
DERM Permit number: SP0003145211
CONDITIONS
1 All works are to be constructed in accordance with the following drawings:
- JSP-SJ-23480 C prepared by Cardno (Qld) Pty Ltd and dated 09/07/10
- JSP-SJ-23481 B prepared by Cardno (Qld) Pty Ltd and dated 23/06/11
2 Access must be designed and constructed in compliance with Australian Standards.
3 The chief executive administering the Coastal Protection and Management Act 1995 may order the
works to be removed or modified, within a reasonable time, if the works have or are likely to have a
significant effect on coastal management because the works:
(a) create a navigation hazard or other danger to the public; or
(b) cause erosion or land degradation; or
(c) are unstable or have not been constructed according to the approved plans.
4 Any erosion or loss of sand surrounding the works that occurs because of changes caused by the
works must be rectified.
5 Contaminants must not be released from the site to any waters or the bed and banks of any waters
(including groundwater) unless authorised by the administering authority.
6 There is to be no visible sediment plume greater than 30 metres from the proposed structure. If a
visible plume exists 30 metres from the proposed structure, works must immediately cease and a
sediment curtain must be positioned around the plume until it has settled and is no longer visible.
DEFINITIONS
Words and phrases used throughout this permit' are defined below. Where a definition for a term used in this
permit' is sought and the term is not defined within this permit' the definitions provided in the relevant legislation
shall be used.
"administering authority" means the Department of Environment and Resource Management or its
successor.
"approval" means'notice of development application decision' or 'notice of concurrence agency response'
under the Sustainable Planning Act 2009.
"site" means land or tidal waters on or in which it is proposed to carry out the development approved under this
development approval.
"waters" includes river, stream, lake, lagoon, pond, swamp, wetland, unconfined surface water, unconfined
water natural or artificial watercourse, bed and bank of any waters, dams, non-tidal or tidal waters (including the
sea), stormwater channel, stormwater drain, roadside gutter, stormwater run-off, and groundwater and any part-
thereof.
"works" or "operation" means the development approved under this development approval.
"you" means the holder of this development approval or owner / occupier of the land which is the subject of
this development approval.
END OF CONDITIONS
Page 2 of 2 ' 091217 Department of Environment and Resource Management