Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

06/0718 - MCU - Commercial Business Type 2 Medical & Type 1 Office [As Published] · 132006.718

of 75

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997

Integration of land use and public

, transport

2 For more information refer to Guide 23, schedule 8A

* of the IPA, & schedute 2 of the IP Regulation,

! Unless you answered ‘none of the above’, the
apptication triggers referral to QT as a concurrence
agency.

IDAS Assessment Checklist, Version 15.0, 18 November 2005
22. The application involves: (tick the applicable box/es)—

0 (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.

LD (ii) reconfiguring a tot—

Ca) onland that is completely or partly within a public transport corridor, and the
total number of lots increases;

(1 (b) on land that is completely or partly within a future public transport corridor or
an airport's public safety area;

[1 (ce) on tand that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;

LJ @) _ fora residential purpose within the 25 ANEF contour for an airport;

DJ) fora residential purpose resulting in 100 or more allotments.

O (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—

(1 (a) _ is completely or partly within a public transport corridor or a future public
transport corridor;
(1) (b) will result in work that encroaches into an airport's operational airspace.
[XI (iv) none of the above.

 

 

@ Railway safety and efficiency
For more information refer to Guide 23, schedule 84
of the IPA & schedule 2 of the IP Requlation.

Unless you answered “none of the above’, the
application triggers referral to QT as a concurrence

 

23. The application involves: (tick the applicable box/es)—
O (i) a material change of use assessable against the planning scheme for a purpose

mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.

 

if the application involves ~

(i) 3 or more concurrence agencies; or

(ii) a facility or area assessable under a
planning scheme and prescribed in
Schedule? or 8 of the IP Regulation; or

(ii) development which is subject to an
application for preliminary approval
mentioned in $3.1.6 of the IPA.

For more information go to Guide2 and Guide 6.

t

agency. D (ii) reconfiguring a fot—
(1a) onland that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;

‘ (1 (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater;

Ci (c) _ onland that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;
(1 @)__ onland that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
C)(e) on land that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
(C1) fora residential purpose resulting in 100 or more allotments.
C1 (iii) operational work assessable against the planning scheme, but not associated with a
Material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
e@ above, involving extracting, excavating or filling greater than 50m, on tand that—
(a) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
{1 (b) _ is completely or partly within future railway land, or a railway tunnel easement;
(D(c) abuts rail corridor tand, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.
EX (iv) none of the above.
- Referral coordination 24. Does the application trigger referral coordination?
An information request requires referral coordination X NO

(11 YES, as the application: (tick the applicable box/es)

Ci (i) __ triggers 3 or more concurrence agencies;
(ii) _ involves a material change of use made assessable under a planning
scheme and prescribed in schedule 7 of the IP Regulation;
Oil) _ involves a material change of use (other than a dwelling house, outbuilding
or farm building) made assessable under a planning scheme, or
TF -reconfiguring-a lot,in an area prescribed in schedule 8 of the IP Regulation;
(I (iv) _ is for a preliminary approval mentioned in s3.1.6 of the IPA mT

 

 

Page7

Used in these records

About this file

File size
5.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_0718 - MCU - Commercial Business Type 2 Medical & Type 1 Office [As Published].pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.