Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

06/0718 - MCU - Commercial Business Type 2 Medical & Type 1 Office [As Published] · 132006.718

of 75

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

«8

INTEGRATED PLANNING ACT 1997 Part A, Version 2.2, 25 July 2005

 

 

 

Land owner's consent (if applicable) 20. Land owner's consent to the making of this application:

Section 3.2.1{10}(a) of the IPA prescribes that an ,

application cannot be taken to be properly made Name __ Signature Date
without the land owner's consent.

 

 
   

An application must be supported by the consent of X (i) Emmeltea Ply Lid
aiftand owner if the application involves: ACN 141 215 635
(i) a material change of use:
(i) reconfiguration of a lot;

ii) work on land betow high-water mark & not within
a canal as defined under the Coastal Protection
and Management Act 1995:or

(i) work on rail corridor land defined under the
Transport tafrasiructure Act 1994,

For a mobile or temporary ERA - landowner’s

consentis not required.

For more information refer to Guide 4,

  

 

 

 

 

 

Resource entitlement (if applicable}

21. Does this application involve taking or interfering with (other than interfering with quarry material on State
Section 3.2.1(10)(b) of the IPA presoribes that an ?

 

 

it 2
application cannt be Icken lo be propery made coastal fand under the Coastal Protection and Management Act 1995) a State resource?
without evidence of the resource entitlement. {I NO - go to Q24 LIYEs- goto Q22
Advice for compteting Q22 J oo . aoe oe ;
Refer fo sched ‘0 of the Iterated Plenning i 22. This application is required by regulation to be accompanied by evidence: (tick applicable box)
fatio: al scribes the nature of evi lence rn " o . ,
nae by the State insupport of the lodging of this C1 (i) of the allocation of, or entitlement to, the resource — attach evidence
evelopment apptication. {il} the chief executive of the department administering the resource is satisfied the development is
. + consistent with an allocation of, or entitlement to, the resource - go te 923 ,

© (iil) the chief executive of the department administering the resource is satisfied the development °

application may proceed in the absence of an allocation of, or entitlement to, the resource -

 

 

go to Q23
Advice for completing G23 | 23. Evidence of the resource entitlement: . : :
meuieduner ae tberajaswe” "| (Resource entitlement / authority deta (v) Official stamp of the department
‘The official stamp of the Department of Natural administering the resource (if
Resources and Mines is mandatory where the os applicable)
application involves taking or interfering with water or (i) Name of delegated officer

riverine quarry material under the Water Act 2000.

(iii) Position of seated officer

(iv) Signature of delegated officer

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(vy) Date
tL i“(‘CO#*d
Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application?
© becomming Pa hard BoltteForn ems iH ee Yes TINO -the assesément manager may refuse to accept this application on the
Must be completed for ail other applications. grounds that the application has not been property made
Plans / drawings / reports 25. Plans/drawings/reports accompanying this application:
See tana be secomparied by dels ° Plan / Drawing / Report Number Title Date
the appicaion dures rath aoa (i) Ken Hicks and Associates Town Planning Report March 06

Nolification to understand the scope of the proposal a TT nnn nee nent ete e ne enn dine ence eee cence eee e nee
and any potential impact,

   

 

 

 

 

 

 

 

 

 

 

PLEASE NOTE: The assessment Manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part &
"and any other relevant part of Form 1. :

OFFICE USE ONLY {applicable to assessment manager's}

OQ. 5
[ee CWe.0. | adie _Rolalo [aD Le TT aS g
/: |

{
i
Date ofengagement’ / / — Accreditation Number Name: Signature:

Notification of Engagement of Private Certifter rd piionai fonnat)

To. Council. | have been engaged as the private certifier for the building work referred to in this application.

 

 

 

Used in these records

About this file

File size
5.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

06_0718 - MCU - Commercial Business Type 2 Medical & Type 1 Office [As Published].pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.