06/0718 - MCU - Commercial Business Type 2 Medical & Type 1 Office [As Published] · 132006.718
0) ae
isos uve /”
HIGH LEVEL OVERFLOW FROM GPT 9 ——
=
\ ROCLA or FOX BGPCT OR EQUIVALENT UNIT
1506 UPVC
GRADED @ 1in100
TO DETENTION TANK
1506 UPVC
HIGH LEVEL OVERFLOW
STORMWATER DRAINAGE NOTES
Tolerances: with the Pi tolerances table. These tolerances are conditional
tn falls toate CO ene ae ae eae at ino than the
terials
Stormwater to be PRC. or U.P.V.C. class SH in accordance with AS35003
Connection to kerb to be galvanised RAS in accordance with AS1074 with minimum
coating mass of 500g/eqr.m
Identification
Lay a detectable strip or plastic tape in the trench after pipelaying, testing and initial
ek bed piping 00.8 con uous underlay of bedding material, at least 75 mm
Chat celta ut Cyt ts wh nic
from bearing on the treach botiom ar und .
ee on sta le surround in 200 loose thickness,
and compact without damsging r eaves ™m
Anchor blocks i
i , provide anchor blocks which restrain lateral and axial movement of the
pipelines al junctions and changes of grade or direction.
Gener 50
: If necessary, encase the pipeline in concrete at least 150 mm above and
below the pipe, and 160 mm each side or the width of the trench, whichever is the
GRADED ©” {int00 = Pye dy
FROM CARPARK — Tone a ooming munimam cleat measured to the crow of the pipe,
= NEW 600 SQR "109 mum'ielo formation lee ofthe Jaret, herb ot chanol
— - mm \verage @adient bottom footings.
— PE RAEL Up = 450 mm below the finished surface of unpaved ground.
= OVER EXISTING PIPE Joating ot tee, to 45 2480.1
freseh width Minna, 00 nen couplings or ata “
rece
| General: the trench floor evenly to the gradient of the pipeline. If the trench
floor is rock, correct any bedi material. Bed piping
1006 UPVC 1508 UPVC compaction. ct, lay te ne with one fae of perforations at the bottom.
LOW FLOW OUTLET = GRADED @ 1in100 Chases: chases to prevent projections such as sockets and flanges
FROM DETENTION TANK from bearing on the trench stn fun”
surrounds
Coneal Place the material in the ipe surround in layers 200 mm loose thickness,
pace ec pe vt
STORMWATER TANK aod chin btw mi of ~— seme Sueh as pavements, slabs
- mm finished lace or landscaped
SCHEMATIC PLAN j ™ a
wr tO xa 1
DRAWING TITLE: PROJECT: THES ORANG 1S SUBKECT TO COPYRGHT AMO MUST NOT BE RePRogoen | PROECT No
fren ont tae) STORMWATER MANAGEMENT RENOVATION/EXTENSION MME OF APT EE TEN PORES, (©) 2 2632
5 Place
Ete Gs =| scare: DATE: SITE ADDRESS: LOT 20 DAVID LOW WAY OWNER/S: l SHEET No.:
DESIGN DRAFTING Piva. Sevesces w+t.s. JAN 2006 PEREGIAN COUMBIS DENTAL SURGERY 10 oF 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/0718 - MCU - Commercial Business Type 2 Medical & Type 1 Office [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.