MCU12/0047 DERM Response - Referable Wetland
r
Notice
Advice Agency Response
approval with building or development envelope(s) may also be a useful way to give formal effect to any
required buffer area.
The assessment manager should consider requiring applicants to provide a Stormwater Management Plan
to demonstrate how stormwater, sediment and other run-off from the site (associated with the construction
and operational phases of development) will be effectively managed to prevent adverse impacts on wetland
values. Potential impacts are to be addressed through water sensitive urban design including compliance
with South East Queensland Regional Plan 2009-2031 Implementation Guideline No.7: Water sensitive
urban design -
design objectives for urban stormwater management. For areas outside of the South-east
Queensland Regional Plan area any approval should recognise the requirements of The Urban Stormwater
Quality Planning Guidelines 2010.
General information for assessment managers
The State’s Native Title Work Procedures provide that responsibility for assessment of native title issues for
an I DAS application rests with the assessment manager. Therefore, DERM as a referral agency for the
relevant application has not provided notification to native title parties.
Additional information for applicants
It is a requirement of the Environmental Protection Act 1994 that if an owner or occupier of land becomes
aware of a Notifiable Activity (as defined in Schedule 3 and Schedule 4 of the Environmental Protection Act
1994) being carried out on the land, or that the land has been, or is being, contaminated by a hazardous
contaminant, the owner or occupier must, within 22 business days after becoming so aware, give written
notice to the Department of Environment and Resource Management.
Aboriginal Cultural Heritage
Under section 23 of the Aboriginal Cultural Heritage Act 2003 a person who carries out an activity must take
all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage
(the "cultural heritage duty of care"). Maximum penalties for breaching the duty of care are $1,000,000 for a
corporation and $100,000 for an individual.
Applicants will comply with the duty of care in relation to Aboriginal cultural heritage if they are acting in
accordance with cultural heritage duty of care guidelines gazetted under the Aboriginal Cultural Heritage Act
2003, available on the DERM website, or in accordance with an agreement with the Aboriginal party for the
area or a cultural heritage management plan approved under part 7 of the Aboriginal Cultural Heritage Act
2003.
Applicants are also encouraged to undertake a search of the Aboriginal Cultural Heritage Database and the
Aboriginal Cultural Heritage Register, administered by the Cultural Heritage Coordination Unit, DERM.
Application forms to undertake a free search of the Cultural Heritage Register and the Database may be
obtained by contacting the Cultural Heritage Coordination Unit on (07)3239 3647 or on the DERM website
www.derm.gld.gov.au/cultural heritage
Page 3 of 4 091217
.
Department of Environment and Resource Management
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU12/0047 DERM Response - Referable WetlandRelated documentApplication case desk ↗
About this file
- File size
- 2.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.