Original source · versioned page text
G - Infrastructure Services Report (13.09.19)
Original PDF page 25, section 1. The text section number identifies this passage in the reader.
PAPER SIZE A3 All underground cables shall be treated as being energised. Where a cable is located that is not represented on the ENERGEX EnerG!Se DBYD map, then ENERGEX shall be contacted immediately. For Emergency Situations Please call 13 19 62 UNCONTROLLED COPY This output provides details of the ENERGEX elactrical network. As variations may exist no responsibility is incurred by ENERGEX for the y or provide iti of the infor ic d. Exact p of cables and electrical connectivity should be confirmed on site. TREY So. energex GIS DBYD Date: 17 Apr 19 Time: 16.52.29 Requested By: DBYD NOT TO SCALE ° 100m Enquiry No: 82461331 KEY MAP Enquiry Area LOCALITY DIAGRAM No PAPER SIZE A3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.