Original source · versioned page text
G - Infrastructure Services Report (13.09.19)
Original PDF page 29, section 1. The text section number identifies this passage in the reader.
OC[1
175.0 2xO
050
0mm]
50 PR P50 -2 65 C[1
2001
Cable Plan .0 0mm
10 6.5
c8:M
]
mm
2xOC[16mm] P5 5 ]
8
3
OC[23mm] 0 N
] OC[2
U2 c8:M2001-2050 3mm 45.0 3 mR
OC[1 mD
OC[1
[
RMBOARD OC[1
OC
9
2x 0
MC
MC ]
P35
P5
OC[2 mm]
OC 50 6mm
OC[3 mm]
c8 ]
]
:M [14 P50
7mm
OC[1 6mm]
2xO 9mm]
0mm
47.4
24.8
W E
20 mm
6
]
0mm
42.3
3
56.1
.0
OC[1
12 01
8 ]
P70
35
-2
C[1
]
OC[10mm]
OC[1
14 05
]
1303m
mm
0
29.4
U2
MC
[14
74
40.0
OC[10mm]
.3 S
P50
P35
OC
U3 4 18 8
15.9 9 8
3
U4
OC[1
OC
P5
0
0mm]
P3
]
P5
OC0 50
3
10.
mm.0
[10 10
[10
5
20 [1
P35
OC 4m
2
P3 C[1
25
m
P35 m
O
5 3m
U3 ] .0
m]
5
U2 3
3 U1 2
47.4
OC P3
m]
M 5
27
]
2xO 9mm]
OC [23
mm
.5
m]
3 C
P3 10m
U1
P35 16.6
.0
OC[10mm]
16
[1 mm
D7
6m ]
C[16
[
SHE
5
OC[1
OC
m
3 ]
] U8 U2
9 m
8. 0m 2xOC CT
3 [16
107.8
C[
1 OC[1 mm]
P35 [12mm]
3
O P50 28.3 3mm 66
] .0 50
OC
P50 6
P50
U4
U1
2xOC[10mm]
2 c8 10
U8
OC[12mm]
:M O
P35 0mm]
26.0 20 C[1
]
OC[13mm]
4mm
U3
OC[1
U3
OC[16mm] 3 01 4m
U2 -2
05 m]
P3
U2
OC[1
14.0
U6
0
5
SHE
U1
D1
U5
11.5
OC [10mm
U3 P50 20.0 M
OC
C
[12
OC[12mm]
4
mm ]
U4
OC[13mm] 11
SHED2 OC 1.
]
2xOC[16mm] 5
U5 OC [23
[1 mm
6m ]
16 U1-U10
P50
.0 m
] 5 P5
SHED
3
0
9 P5
9 0
7
4
12
9.
3
11 5
8]7.4
0.4
---
4mm
9 2.5
OC[1
OC[ 3mm] 5.0
62.0
4
P50
]
0mm
2-1
m]
M OC
8 C
37m
[1
2
OC[1
U1 6m
OC[
3
U2 m
5 ]
56
P50
P50 .9
3
MC
OC[1 2 P35
4mm2.5 O 17.0
] 2 C[14m
56.0 m]
P35 10
.0
P50
45
5O 19.0 17.0
8
C[10
OC[1 mm] 3 OC[10mm]
2xO 6mm] P50 18.0
50
166
C[23 P35 13.7 .6
-20
mm ]
50
]
49.7
10 PR
01
mm
13
[23
20
T49:O1-10 OC
:M
MC
OC[1 3mm]
0
c8
P5
]
6mm
20
C[2
2xO
P50
CO
MM
ER
4xOC[ 4mm]
3
8
CI
5
AL
m m3]7.
BL
[10
DG
OC
A
71.2
.7
60
CO
MM
ER
CIA
1
LB
LD
G
B
]
mm
[23
OC
U3
U2
MC
P3 2
15
5
U1
.
6
3
150.7
42
OC[23mm]
5
648
47
SP2 L6
0m 20m 40m 60m 80m
HOFMANN DR
For all Telstra DBYD plan enquiries - Sequence Number: 82461332
email - [email protected]
For urgent onsite contact only - ph 1800 653 935 (bus hrs) CAUTION: Fibre optic and/ or major network present
TELSTRA CORPORATION LIMITED A.C.N. 051 775 556
in plot area. Please read the Duty of Care and
contact Telstra Plan Services should you require
Generated On 17/04/2019 17:53:32 any assistance.
The above plan must be viewed in conjunction with the Mains Cable Plan on the following page
WARNING - Due to the nature of Telstra underground plant and the age of some cables and records, it is impossible to ascertain the precise location of all Telstra plant from Telstra's plans. The accuracy and/or
completeness of the information supplied can not be guaranteed as property boundaries, depths and other natural landscape features may change over time, and accordingly the plans are indicative only.
Telstra does not warrant or hold out that its plans are accurate and accepts no responsibility for any inaccuracy shown on the plans.
It is your responsibility to locate Telstra's underground plant by careful hand pot-holing prior to any excavation in the vicinity and to exercise due care during that excavation.
Please read and understand the information supplied in the duty of care statement attached with the Telstra plans. TELSTRA WILL SEEK COMPENSATION FOR LOSS CAUSED BY DAMAGE TO ITS PLANT.
Telstra plans and information supplied are valid for 60 days from the date of issue. If this timeframe has elapsed, please reapply for plans.
Page 1 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.