Original source · versioned page text
2021-06-30 SM - Item 3 - Attachment 1 - 2021-22 Budget Document
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Noosa Shire Council
2021/22 Budget Statements
SCHEDULE OF LEVIES AND SEPARATE CHARGES
For the period ending 30 June
2021 2022 Change
Special Rates and Charges Schedule Special Rate Purpose $,000 $,000 %
Tourism and Economic Levy* To contribute towards the cost of the promoting tourism and related $ 2,898 $ - -100.0%
activities, as well as the implementation of projects that will assist in
delivering the strategies outlined in the Noosa Local Economic Plan.
Noosa Waters Lock and Weir Maintenance Levy Funding for the operation and maintenance of the lock and weir system $ 50 $ 220 340.0%
which services the Noosa Waters Estate.
Noosa Waters Canal Management Levy The funding of services associated with the inspection, maintenance $ 15 $ 16 6.7%
and future capital works in the Noosa Waters estate canal area to
ensure the long-term viability of the canal revetment wall system.
Noosa Junction Levy** The funding of projects and initiatives to advance the recommendations $ 92 $ 175 90.2%
of the Noosa Junction Commercial and Economic Planning Strategy. All
projects and initiatives are implemented by the Noosa Junction Traders
Association.
Hastings Street Precinct Levy The funding of additional levels of service and activities above and $ 344 $ 355 3.2%
beyond Council's existing service standards. These additional services
and activities are provided at the request of the Hastings Street
Association.
Noosa Main Beach Levy To support the cost of the ongoing restoration and maintenance $ 602 $ 620 3.0%
program for the Noosa Heads main beach.
Rural Fire Charge The funding of operational costs and equipment replacement for $ 160 $ - -100.0%
gazetted Rural Fire Brigades in the Noosa shire.
Hastings Street Community Safety Program Charge*** The funding of safety programs for the Hastings Street precinct. This $ 157 $ 161 2.5%
includes the provision of security patrols, which are managed by the
Hastings Street Association.
Lower Noosa North Shore Electricity Charge The progressive repayment by specified properties in the Lower Noosa $ 46 $ 46 0.0%
North Shore of the design and construction costs for electricity
infrastructure previously funded by Council.
Total Special Rates and Charges $ 4,364 $ 1,593
* Note - Tourism Noosa funding of $2.52 million and economic development costs to be funded via general rates in 2021/22
** Note - Levy funds provided directly to the Noosa Junction Traders Association
*** Note - Levy funds collected for security patrols provided directly to the Hastings Street Association
Page 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.