Council archive · source document
Amended Concurrence Agency Response (DTMR) - OPW13/0451
(
..
7. Any ships and equipment you or your agent use must comply with the Transport
Operations (Marine Safety) Act 1994, the Transport Operations (Marine Safety)
Regulation 2004 and the Transport Operations (Marine Pollution) Act 1995.
8. Any ships using this structure must comply with the Transport Operations (Marine
Safety) Act 1994 and the Transport Operations (Marine Safety) Regulation 2004.
9. Any ship moored at this pontoon must not impede the safe navigation of other ships or
restrict safe access to or from neighbouring structures.
10. Any ship berthed, moored or attached to the pontoon must not exceed the following
sizes:
Wet Berth Dry Berth
Length Overall -
8 metres N/A
Beam -
4 metres
11. The contractor must construct the pontoon within two years from the date of approval. If
construction is not completed, you will need additional or amended comments from the
Regional Harbour Master.
Maritime Safety Queensland does not need to be further consulted if all of the above
conditions are met.
The above conditions must be included in your application to the assessment manager.
This agency will also forward a copy of this letter to the Assessment Manager.
Yours sincerely
qJ~
taptain Richard C Johnson
Regional Harbour Master (Brisbane)
Page 2 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Amended Concurrence Agency Response (DTMR) - OPW13/0451Related documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.