Council archive · source document
08/0529 - Response to Information Request [As Published] · 142008.529
DRAWING SIZE — Al NOMINAL KERB Barrier
SETOUT LINE
! Kerb to
é detail
ROOF DRAINAGE ‘o
MANAGEMENT PLAN ALL ROOF DRAINAGE TO DRAIN TO N
— Ensure the inflow into the pit is protected with PROPOSED WATER TANKS. FINAL
an approved leaf and silt guard. DOWNPIPE LOCATIONS TO FUTURE Ss ” ____ Extend sub-base 150mm
— The pit MUST be wrapped in geofabric cloth as DETAIL. ~| sS passed back of kerb.
specified.
— The pit should be backflushed on a regular basis START DF EXISTING
3 months) to remove any silts or similiar ~
(5 month ) y Depth | Subgrade preperation, refer BITUMAN DRIVEWAY
— The pit should only be used for the disposal of determined — pavEMENT MATERIALS general notes.
sj . CONSTRUCTION NOTES.
stormwater. on-site. 125mm N25 Concrete pavement, SL82 Mesh Middle GRA:
100 Base course type 2.1 CBR 40 OR Compacted Sand Base J, Og rot soaie kom tis owng
Settlement Surface Concrete Sub—grade preperation in accordance with specifications/notes Sage Snarnene a f2be ei Go Be een
Allowance 100mm Bund encased PROP Ep 4. Any crepancis between tee crowing nd the crctectur dawiye
. ' un ore n anges immedcidy
Topsoil J overflow grate. aly 20unp Ry CONCRETE DRIVEWAY SECTION COMPACTED FILL TO 98% sat be aient ont sa eens t atng savers within and
10 STANDARD, PROVIDE BACK Tso,
. FOOTPATHS AND DRIVEWAYS:
. OO PROPPING TO 190 BLOCK 1 Exige tobe om aa tp removd
Flow S _ « - RETAINING WALL DURING 5 Gonrla Svea fo be mm Oi mcg ey ed erat,
Ss FFL 43.515 S +E ee CONSTRUCTION 2 cones arcs tderonce +5 ran ovr 3m
. 5 GARAGE = 7 font ft A150 pd cod ch ph
. a” Op pee 7. Expansion jaints to be 10mm wide wet tooled with every 2nd mesh wire
Grid of Slotted = ce WOR @ One oxen pot paid fr ech ott
Agg pipes 150 min \ Tt 10M sao to be ald nd feat roered pe at
clearance to base. As per plan 20mm clean a FLUNG NOTES: ~
aggregate encased a — — ral CP1 ao ~The site is to be scraped clear of all orgmnic materi and Sebi, »
(A mn geofebric. / seen arin re eta re
ran sufficient 10 ochieve @ blow count of 7 blows per 300mm with on approved
} t
STORMWATER SOAKER PIT DETAIL p\s fF & armas tetas eto
eral content of less than 12% ici Index less than 25% Linear shrinkage of
RESIDENCE 2
Slotted horizontal
agg laterals
pipes equally spaced.
LOT2
AREA : 718.877
PROPOSED NEW
RESIDENCE
FFL 43.765
GARAGE
L
3
e
As per plan
LOT taininum of 98% dry density os determined by compaction testing in
(RY TYPICAL SECTION ~ A — A AREA: moon? Sn I ay ih tn
4 DETAILS
PROPOSED NEW
RESIDENCE
Pipe Grid at Base
's84¢ CONSTRUCTION
Socamaanty am, &
ABN 40 098
Wet tooled
LEGEND control pint. \\ driveway slab. 2/908 vPVC
_.--7'7 INDICATES EXISTING SURFACE TANK OVERFLOW
49.9 CONTOUR AND LEVEL TO AHD.
ra, INDICATES DIRECTION OF FALL rn fe ne ee =<
TO FINISHED DRAINS. fp 2
5° 450Sq GRATED FIELD INLETS, Cut every 2nd SL/2 mesh 3(No.) 4.0x1.0x1.0m(D) .
18 DUKE STREET SUNSHINE BEACH QLD.4567
Ph (07) 5447 5544
Title:
DRIVEWAY WORKS & DRAINAGE
PRE-CAST CONCRETE. wire along line middle STORMWATER SOAKAGE 7 OH Project
+35] INDICATES PROPOSED FINISHED R.L SPOT of joint. PITS TO DETAIL 2/908 vPVC PRE a POWELL RESIDENCE
SURFACE LEVELS, TANK OVERFLOW "Y Boo Little Cove Rd, Noosa Heads
TJ) TOOLED JOINT DETAIL DRIVEWAY WORKS AND DRAINAGE ay
Fan ae
pew r7268-0W2 FA
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0529 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.