Original source · versioned page text
proposal plans 1.11 v1
Plans and drawings: the text below has words only, no drawings.
Very large file (11.6 MB): may take a few minutes to open.
(client sign-oft X | sparks architects date: prepare, wall, column surfaces for new render as [rev] date [issued [details [A | 280822 | A__| Detailed Design ‘demolition work o ground floor entry, access balconies, driveway, stairwells, gardens, floors, walls, doorways, celling, softs, plumbing, drainage and existing finishes to level 1, 2.3 and root, tofer to proposed drawings and schedules to confirm extent of works required. contractor Is responsible for co-ordinating all demolition to allow for proposed work to be completed. hydraulic and structural demolition work in accordance with engineer specification Contractors responsible forall existing service locating and capping: no variations or extensions of time wil be approved for any damage to existing contractor to allow for underground scanning with pt excavation forall service locating allow for capping of existing services where required. refer to existing survey documents and DBYD records for plotted record information| existing landscape to be removed ‘scheduled remove existing awnings x8, gutters, downpipes and ‘prepare all beam, wal, column surfaces for new render as scheduled a— refer to landscape drawings for extend of works prepare column and wall surfaces for new render as scheduled existing driveway surfaces to be removed, existing slab to be cut sealed and lavelled as requited for now driveway setout and finish as scheduled. Sealing of cut surfaces in accordance with engineers specifications existing landscape to be removed refer to landscape drawings for extend of works ~~ reiTigve existing awnings x8, gutters, downpipes and repare all beam, Wal, Cokumn surfaces for now fender as scheduled ee ‘tim and prepare existing beams for new surfaces as ‘scheduled in-line in accordance with engineers ‘specifications existing surfaces to be removed, existing stabs to be removed, cut and leveled where required for new existing elevation — gardens, pathways and driveway as scheduled. sealing of concrete and steel in accordance with engineers specifications remove existing awnings x8, gutters, downpipes, electrical and prepare all beams, walls and columns Surfaces for new work as scheduled remove existing surfaces to be removed and. prepared for new surfaces as scheduled remove existing soft surfaces and electrical to softs prepare surfaces for new materials and finishes as scheduled Detailed Design Alterations and Additions ‘Scale 1:200 Wu 1__1 37 Hastings Street, Noosa Heads La Mer Body Corporate 204 AK Existing Site & Demolition Plan DD 1.4 project client job no. drawn | drawing dwg no.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.