Original source · versioned page text
2022-04-21 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 21 APRIL 2022
2. The Currency Period for this development approval lapses if all conditions have not been
complied with by 21 April 2024, unless an application to extend the currency period is approved
by Council.
General Conditions
3. All structures must be designed and constructed such that they are free standing within the
waterway and are not connected to or behind the revetment wall
4. All structures must have no detrimental effects on stormwater drains and/or easements.
5. A rigid handrail must be fitted on one side of the walkway.
6. No posts or vertical supports of the proposed jetty are to extend vertically from the structure
unless they provide necessary support for the handrail.
7. No boatlifting devices are to be attached or moored at the jetty structure for the purpose of
elevating a vessel above the water without Council approval.
8. There must be no electrical reticulation system carrying electricity in excess of 24 volts beyond
the revetment wall unless all switches and power outlets are positioned above the 1%AEP
flood level.
9. Lighting associated with the use must be designed, installed, operated, and maintained in
accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
10. The jetty is to be used for private purposes only with no commercial operations to be
undertaken.
11. Boat repair activities are not permitted on site.
12 Wastewater and sullage must only be disposed of at approved pumpout facilities.
13. The mooring facility must not be utilised for live-aboard purposes.
14. Any construction and post construction activity is not to impact on the condition of the
waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA
(1994) and the Environmental Protection (Water) Policy 2009.
15. Certification by a Registered Professional Engineer of Queensland that states that the jetty is
structurally sound must be submitted to Council. This certification must be submitted to Council
within three (3) months of the date of this decision. A final inspection by Council’s Inspector is
also required. Please contact Council’s Development Assessment Branch on 5329 6500 to
arrange the inspection.
16. This approval lapses where the construction of the jetty has not commenced within two (2)
years of the date of issue of the approval, unless application is made and approved by Council
for an extension.
17. After completion, the proposed works must be maintained in a sound state of repair in
accordance with the approved plans
Consultation
External Consultation
Not applicable
Internal Consultation
Not applicable
Page 31 of 33
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.