Original source · versioned page text
PM Submission - Keith Calvert - The Oasis Body Corporate - MCU21/0110
The Oasis Noosa Springs Body Corporate - Emergency response concerns
4.0 Potential bushfire risks in and around The Oasis.
4.1 Bushfire Impact Zones
The map below shows the various bushfire zones in relation to The Oasis.
12 Lots are included in the Potential Impact Buffer zone. Of those 12 Lots, 11 are built on, or
are in the process of being built on.
In the absence of any explanation of what the Potential Impact Buffer zone is, it is assumed
that it indicates potential exposure to smoke, burning embers and vegetation.
Q: Parts of The Oasis are included in the Potential Impact Buffer zone – what might be expected to
happen within the zone, and what does this mean for those residences?
The only evacuation route for The Oasis is Oasis Drive, which is included in the Potential Impact
Buffer zone, and in High and Medium Potential Bushfire Intensity zones at a point where traffic
is likely to be stopped before entering the roundabout on Links Drive.
ES Paper - Review of Emergency evacuation provisions Page 5 of 17
[OCR of page images]
The Oasis Noosa Springs Body Corporate - Emergency response concerns
4.0 Potential bushfire risks in and around The Oasis.
4.1 Bushfire Impact Zones
The map below shows the various bushfire zones in relation to The Oasis.
12 Lots are included in the Potential Impact Buffer zone. Of those 12 Lots, 11 are built on, or
are in the process of being built on.
In the absence of any explanation of what the Potential Impact Buffer zone is, it is assumed
that it indicates potential exposure to smoke, burning embers and vegetation.
Q: Parts of The Oasis are included in the Potential Impact Buffer zone — what might be expected to
happen within the zone, and what does this mean for those residences?
The only evacuation route for The Oasis is Oasis Drive, which is included in the Potential Impact
Buffer zone, and in High and Medium Potential Bushfire Intensity zones at a point where traffic
is likely to be stopped before entering the roundabout on Links Drive.
ES Paper - Review of Emergency evacuation provisions Page 5 of 17
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.