Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

landscaping

of 4

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                                                                                                                                                                                                                                                                                                      seed       landscape design

                                                                                                                                                                                                                                                                                                                                                                                      t 07 3217 6491 m04 1616 9858
                                                                                                                                                                                                                                                                                                                                                                                      po box 527 paddington qld 4064
                                                                                                                                                                                                                                                                                                                                                                                         www.seedlandscapes.com.au

                                                                                                                                                                                                                                                                                                                                                                                                         abn 85 468 007 510




GENERAL                                                                                                                          EXCAVATION AND                          CULTIVATION &                            FILL & TOPSOIL                           EROSION AND                              PLANT SUPPLY                             EXISTING TREES
                                                                                                                                 EARTHWORKS                              SUBSURFACE                                                                        SEDIMENT CONTROL
All works to be performed by a             Convey soils, earth, sand, loose debris    Unless otherwise specified, reinstate                                              DRAINAGE                                 Fill and subsoil material used to
                                                                                                                                                                                                                  make up levels shall be re-used from
                                                                                                                                                                                                                                                                                                    The Landscape Contractor shall
                                                                                                                                                                                                                                                                                                    supply plants as specified in the
                                                                                                                                                                                                                                                                                                                                             Protect all existing vegetation unless
                                                                                                                                                                                                                                                                                                                                             otherwise specified. All vegetation
licensed Contractor familiar with          and the like to or from the site in a      all existing surfaces, items, structures   Inspect the site and ascertain the                                                                                        The Landscape Contractor shall
landscape construction of this nature.     manner that will prevent dropping of       and anything disturbed or damaged by                                                                                        previous earthworks operations on        ensure measures to minimise              planting schedule. Plants shall be       and weed removal is to be carried
                                                                                                                                 nature of excavation required and
The Contractor shall verify the location   materials on streets, public and           the performance of the works, to its                                               The Landscape Subcontractor is to        site where possible which is                                                      delivered on site true to pot size,      out using industry standard accepted
                                                                                                                                 the working conditions that will be                                                                                       erosion and situation.
of utilities on site prior to the          private areas. Ensure that the wheels,     condition at the commencement of                                                   provide for sufficient surface and       composed of natural site subsoils                                                 species and type, and free of weeds,     safety procedures and equipment to
                                                                                                                                 encountered prior to the                                                                                                  Take all precautions necessary to
commencement of construction, and          tracks and body surfaces of all vehicles   the Contract, other than that forming                                              sub-surface drainage to garden and       but free from stones, sticks, roots,     prevent erosion, contamination and       disease and fungal infection.            ensure personal and environmental
                                                                                                                                 commencement of work. The
ensure that they will not have an          and plant leaving the site are free of     part of or directly modified by the new                                            grass areas to ensure adequately         rubbish and material toxic to plant                                               Substitutes will not be made without     protection. Avoid damage to nearby
                                                                                                                                 location of topsoil stockpiles,                                                                                           sedimentation of the site,
effect on the works. The Landscape         mud and that mud is not carried onto       work.                                                                              drained soft landscaped areas free       growth.                                  surrounding areas, water and             prior consent of the Landscape           trees and surroundings.
                                                                                                                                 roadway and cut embankment
Contractor is advised to visit the site    adjacent paved streets or other areas.     Remove and cart away debris, spoil                                                 from surface ponding water and                                                    drainage systems, in accordance          Architect.
                                                                                                                                 profiles and water connection points
to satisfy themselves as to local          Restrict dust caused by the Works to a     and surplus building materials from                                                heavy/ waterlogged soils. Surface        Supply and install imported topsoil                                                                                        Grub out stumps and roots over
                                                                                                                                 must be taken into account.                                                                                               with the Environmental Protection
conditions, accessibility, storage         minimum. Take all practicable steps        the site and buildings, with the                                                   and sub-surface drainage is to aid in    where necessary that complies with                                                Ensure that trunks and branches          75mm diameter to a minimum depth
                                                                                                                                                                                                                                                           (Water) Policy 1997.
space, the full extent and character of    to minimise noise resulting from the       exception of those works associated                                                the healthy growth and continued         Australian Standards to all turf                                                  are free of dieback, cavities,           of 500mm below sub-grade. Stumps
                                                                                                                                 Surface drainage shall be diverted
the works and the site, the nature of      Works.                                     with others prior to practical                                                     thriving of all plant stock and grass    (100mm) and garden (300mm) areas                                                  sunburn and secretions. Trunk and        less than 75mm diameter shall be
                                                                                                                                 clear of excavations and covers shall                                                                                     Methods of protection shall include
the ground, the supply of materials                                                   completion.                                                                        areas.                                   as shown on drawings unless                                                       branches are to be evenly tapered        cut off at ground level and treated to
                                                                                                                                 be provided where necessary for                                                                                           but not be limited to the following:
and water and the execution of the      Check all delivery tickets, labels,                                                                                                                                       otherwise specified. Ensure modified                                              and textured typical of the specie.      prevent regrowth.
                                                                                                                                 safety. Ensure that run-off is not      Comply with the relevant Australian
contract generally. No claim will be    identification marks and, the goods           Fire Ant Control                                                                                                            site soil is free from stones, sticks,   · Construction of temporary surface      Plant material is to be matured
                                                                                                                                 concentrated onto adjoining             Standards to the extent that they are
allowed for any alleged inadequacy of   themselves to ensure that all                 The Landscape Subcontractor is to                                                                                           roots, rubbish and material toxic to      swales;                                 enough to support themselves             Completely remove woody weeds
                                                                                                                                 properties and does not cause a         relevant and not over-ridden by the
the description herein. Should there    products comply with the project              allow to carry out all necessary                                                                                            plant growth. Modified topsoil shall     · Diversion and dispersal of             without staking.                         within the extent of works.
                                                                                                                                 nuisance thereto. Finished surfaces     specification.
be any conflict, the Contractor shall   documents. Where different types of           measures, inspections and safeguards                                                                                        have a friable structure with good         concentrated flows to point where
                                                                                                                                 shall be graded in accordance with
notify the Landscape Architect          any product are specified, check to           to ensure Fire Ants do not enter the                                                                                        drainage and high organic content.         the water can pass through the
                                                                                                                                 Construction Plans.                     Cultivate sub-grade to a minimum
immediately.                            ensure that the correct type is being         site via equipment, machinery,                                                                                                                                         site without damage;
                                                                                                                                 Erect barriers as required to           depth of 150mm prior to placing
                                        used in each location. In particular,         materials and plant stock.                                                                                                                                           · Construction and maintenance of
                                                                                                                                 prevent excavated material and          topsoil to all planting and turf areas
Establish exact locations of services,  check that:-                                                                                                                                                                                                         silt traps (eg hay bales) to prevent
                                                                                                                                 rocks from intruding onto adjoining     on ground.
drains, sewers and water supply lines All stock has been adequately                                                                                                                                                                                          the discharge of scoured materials
and points prior to commencing works protected for loading and in transit.                                                       properties.                                                                                                                 to downstream areas;
                                                                                                                                                                         Minimum cross falls of 1:50 on
and ensure their protection during the The sources, types, qualities, finishes                                                                                                                                                                             · Progressive restoration of
                                                                                                                                                                         planting and pathways to drainage
works.                                  and colours are correct, and match                                                                                                                                                                                   disturbed areas;
                                                                                                                                                                         collection points and overflow
                                        any approved samples.                                                                                                                                                                                              · Construction of temporary siltation
                                                                                                                                                                         points. Planting areas should not
Figured dimensions shall take           The correct species, cultivars, pot                                                                                                                                                                                  fencing.
                                                                                                                                                                         exceed 1:3.
precedence over scale measurements sizes, plant height, girth or spread                                                                                                                                                                                    Any erosion damage reinstatement
and large scale drawings over small     have been supplied for each                                                                                                                                                                                        or cleanup as a result of the
scale. Unless otherwise specified the consignment from the supplier.                                                                                                                                                                                       contractor not adequately protecting




                                                                                                                                                                                                                                                                                                                                                                                                  auxilium property
Drawings and Specification shall        All materials should be clean,                                                                                                                                                                                     the site, materials or the works shall
include everything reasonable for the undamaged and otherwise in good                                                                                                                                                                                      be the responsibility of the
proper and entire completion of the     condition.                                                                                                                                                                                                         landscape contractor.
work.
Verify discrepancies between            Ensure adequate provision is made for                                                                                                                                                                              Remove temporary erosion control
Specification and Drawings with the     the protection and storage of                                                                                                                                                                                      measures when they are no longer
Landscape Architect before              deliveries. In particular ensure that:-                                                                                                                                                                            required.
proceeding with the particular work.    Materials which may deteriorate with
Failure to do so will not be taken as a storage must not be stockpiled on site.
reason to claim for extra work.         Adequate and appropriate provision is
                                        made for storage prior to deliveries




                                                                                                                                                                                                                                                                                                                                                                                       CLIENT
                                        arriving on site. ALL materials in
                                        storage are to be suitably protected
                                        from physical damage and extremes
                                        of weather. Keep storage areas neat
                                        and tidy.




                                                                                                                                                                                                                                                                                                                                                                                                                  issue
                                                                                                                                                                                                                                                                                                                                                                                                                   a
                                                                                                                                                                         ENVIRONMENTAL                            TURFING                                  MULCH                                    FERTILISER                               MAINTENANCE/ESTABLISHMENT
                                                                                                                                                                         PROTECTION                                                                        Supply and install organic mulch to a    Provide proprietary fertilisers,
                                                                                                                                                                                                                                                                                                                                             PERIOD




                                                                                                                                                                                                                                                                                                                                                                                                                  sept 2021
                                                                                                                                                                                                                  Supply and install A-grade turf
                                                                                                                                                                                                                                                           minimum of 100mm and gravel              delivered to the site in sealed bags
                                                                                                                                                                         The Landscape Contractor should          (variety specified on drawings) to




                                                                                                                                                                                                                                                                                                                                                                                                                  date
                                                                                                                                                                                                                                                           mulch to a minimum of 50mm.              marked to show manufacturer or           Maintenance of all landscape works
                                                                                                                                                                         consider in every instance whether       areas shown on drawings. Finishing
                                                                                                                                                                                                                                                           Ensure mulch meets Australian            vendor, weight, fertiliser type, N:P:K   is to be carried out by the Contractor
                                                                                                                                                                         the use of chemicals is strictly         levels should be flush with adjacent
                                                                                                                                                                                                                                                           Standards and is free from               ratio, recommended uses and              until completion of the landscape
                                                                                                                                                                         necessary before application, and        surfaces unless otherwise detailed.
                                                                                                                                                                                                                                                           deleterious matter, fungi and            application rates. Store in a dry        works.
                                                                                                                                                                         assess the product, site conditions      Spread topsoil and grade surface to
                                                                                                                                                                                                                                                           disease. Mulch shall finish 25mm         secure environment. Apply                Maintenance includes replacement
                                                                                                                                                                         and species to ensure minimum risk       ensure a level finished surface,
                                                                                                                                                                                                                                                           below adjacent surfaces.                 according to manufacturer's              of dead and/or diseased plant stock,
                                                                                                                                                                         to his employees, other users of the     which drains to nominated field
                                                                                                                                                                                                                                                                                                    recommendations                          removal of weeds and rubbish, weed
                                                                                                                                                                                                                  gullies.




                                                                                                                                                                                                                                                                                                                                                                                                                  scale
                                                                                                                                                                         site and the environment, and take                                                                                         (rate/reapplication/watering).           spraying and mowing.




                                                                                                                                                                                                                                                                                                                                                                                                                  na
                                                                                                                                                                         appropriate safety precautions in        Turf to be free from nutgrass or
                                                                                                                                                                         accordance with all current statutory    other noxious weeds or any other
                                                                                                                                                                         regulations.                             material deleterious to plant growth.




                                                                                                                                                                                                                                                                                                                                                                                                 specifications
                                                                                                                                                                                                                                                                                                                                                                                                                  drawn
                                                                                                                                                                                                                                                                                                                                                                                                                  ps
                                                                                                                                                                                                                  Deliver the turf within 24 hours of
                                                                                                                                                                                                                  cutting, and lay it within 36 hours
                                                                                                                                                                                                                  of cutting. Prevent it from drying
                                                                                                                                                                                                                  out between cutting and laying.




                                                                                                                                                                                                                                                                                                                                                                                                                  drawing no
                                                                                                                                                                                                                                                                                                                                                                                                                  210902 02
                                                                                                                                                                                                                                                                                                                                                                                       DRAWING




                                                                                                                                                                                                                                                                                                                                                                                                                  tewantin qld 4565
                                                                                                                                                                                                                                                                                                                                                                                                                  19 werin street
                                                                                                                                                                                                                                                                                                                                                                                                 210902
                                                                                                                                                                                                                                                                                                                                                                                       PROJECT
Log in to download the original file

landscaping.pdf · 5.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.