07/2398 - Traffic report · 132007.2398
BRTP (Hons) MPIA Cert CE Phone: (07) 3701 $222 [email protected] Town Planning and Development Consultant Fax: (07) 3701 5204 www.kumskov.com.au : 68 Burns Parade, Chapel Hill Q 4069 ~ i arry Kums ko Vi. PO Box 820; Indooreopilly Q-4068 PlanTech Town Planners Pty Ltd ABN 21 076 885 599 7 December 2007 Noosa Shire Council PO Box 141 Tewantin Q 4565 ATTENTION: Tracy Arthur Dear Sir/Madam, Re: Development Application 2007/2398 Please find six copies of the traffic report prepared in support of the development application for“ L RSL Care at 19 Trading Post Road Cooroy. The report is to be inserted as Attachment 7 to the submitted application. f Yours faithfully, Larry Kumskov PlanTech Town Planners
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 94 sections
Section 2
Cooroy Retirement Community | 19 Trading Post Road, Cooroy | Traffic Impact Assessment 4 December 2007 McCormickRankinCagney Paks] Selacen yy McCormickRankinCagney RUMMAGE TORS AeTar
Section 3
Document Information: Client RSL Care - Corporate Services Job Number 3427 Title Cooroy Retirement Community, 19 Trading Post Road - Traffic Impact Assessment Status Final Prepared by McCormick Rankin Cagney Pty Ltd Brisbane Queensland Date 4” December 2007 Quality Assurance Register Issue | Description Prepared Authorised By Date By Date A Draft AS 5/9/07 1 Final . WS/FL | 4/12/07 | GR 4/12/07 This document and information contained herein is the intelectual property of McCormick Rankin Cagney Pty Ltd (MRC) and is solely for the use of MRC’s contracted client. This document may not be used, copied or reproduced in whole or part for any purpose other than that for which it was supplied, without the written consent of MRC. MRC accepts no responsibility to any third party who may use or rely upon this document, 3427-001(1)-Final doc: 04/1207
Section 4
Table of Contents 1. — Introduction 2. — Existing Conditions. 2.1 Subject Site 2.2 Existing Road Network 2.3 Existing Traffic Volumes 3. Proposed De@VeElopMent .....c..ccccscecsteesesseesesceseeerscsssescssessscsssseececscseeceesecsssueasevesarsesevacsseaea 7 B.A Description. eee nenecseneeenevensisesneand i senerereoresaasssensisseseeeseesetesenenes 7 3.2 Development ACCESS ooo. ccc recneneeensnsesnenentarenesreesensestaasussenensasseseseeescecasanas 7 BB Car Parking... ccc ccceenssecssesenecseesreeserscaeseaeeessecseaeacesteesenenenssssaceesescetesesvevarateena 7 3.4 Servicing and MaMmO@UVvring oo... csceneceseeneseccnsececeeseseseeeecensssesesessssateeteseacevensees 7 B.5 Trip Generation ose scssensnseseerceresstseseanecnsneassesssaesensnereracessessseescsssasseeessasevecesseee 8 3.6 Trip Distribution... 4. Future Conditions.. 4.1 2009 Base Traffic Operations 4.2 2019 Base Traffic Operations... 5. — Impact of Generated Traffic on External Road Network.....cccccsecccssssesecesssesescsseeeseras 15 5.1 Stage 1 Development (2OOQ) ss sescecsecccsceesecnseetecsceeeeeteteessetensesrerseteeressansteeseecee 15 5.1.1 Elm Street / Diamond Street... cc eeeececeseecseresenececseseseserseaesesseeceseeneees 16 5.1.2 Elm Street / Pearsons R08... ceccsecesesessnersesesetececsssenessescasaesetsssesseseeres 16 5.1.3 Pearsons Road / Trading Post ROQd cc cceccccsscscssesetseeesseseeseceesesnsatensaes 18 5.2 Stage 2 Development (2019)... ccccseensecssseseetetsessecsesssesesststecseeesteeessees 18 5.2.1 Elm Street / Diamond Street §.2.2 Elm Street / Pearsons Road Intersection §.2.3 Pearsons Road / Trading Post Road.. 5.3 Other Site Accass Considerations "6. COMCIUSIONS 20. ec ce eeceneneasatseaesesessesssssnsvessnssssesesesceeavevsisesssassssssetescseecereasassessies 22 Appendix A , Drawing No.0588_TP_04 Proposed Development Layout Plan Figure 13.58 Basic Right Turn Treatment (BAR) on a Two Lane Rural Road Figure A1 Locality Plan Figure A2 Proposed Functional Layout of Elm Street / Pearsons Road Intersection Appendix B Figure B1 Existing 2007 AM Peak Traffic Volumes 3427-001(1}Final.doc: 04/12/07
Section 5
Figure B2 Existing 2007 PM Peak Traffic Volumes Figure B3_ Base Case 2009 AM Peak Traffic Volumes Figure B4 Base Case 2009 PM Peak Traffic Volumes Figure BS Base Case 2019 AM Peak Traffic Volumes Figure B6 Base Case 2019 PM Peak Traffic Volumes Figure B7 2009 AM Peak Traffic Generation Traffic Volumes Figure BB 2009 PM Peak Traffic Generation Traffic Volumes Figure B8 Horizon Year 2019 AM Peak Traffic Volumes Figure B10 Site Traffic 2019 PM Peak Traffic Volumes Figure B11 Design 2009 AM Peak Traffic Volumes Figure B12 Design 2009 PM Peak Traffic Volumes Figure B13 Design 2019 AM Peak Traffic Volumes Figure B14 Design 2019 PM Peak Traffic Volumes Appendix C SIDRAS.2 ‘Movement Summary’ Output Data 2009 Base AM - Elm at Diamond 2009 Base PM - Elm at Diamond 2009 Base AM - Elm at Pearsons 2009 Base PM - Elm at Pearsons 2019 Base AM - Elm at Diamond 2019 Base PM - Elm at Diamond Signalised 2019 Base AM - Elm at Diamond (with phasing) Signalised 2019 Base PM - Elm at Diamond (with phasing) 2019 Base AM - Elm at Pearsons 2019 Base PM - Elm at Pearsons 20089 Design AM - Elm at Diamond 2009 Design PM - Elm at Diamond 2009 Design AM - Elm at Pearsons 2009 Design PM - Elm at Pearsons Signalised 2019 Design AM - Elm at Diamond (with phasing) Signalised 2019 Design PM - Elm at Diamond (with phasing) 2019 AM Design - Elm at Pearsons 2019 PM Design - Elm at Pearsons €eeée &€ é&€ t€ €é€ £€ eb € e€ ek Kk eee Appendix D Traffic Survey Data 3427-001(1}-Final. doc: 04/1207
Section 6
1. Introduction This report addresses the traffic implications associated with the development of a proposed retirement community to be located on the vacant site bounded by Elm Street, Lamonts Street and Pearsons Road within the Parish of Cooroy, in the shire of Noosa. The location of the site is illustrated on Figure. Ai, Appendix A. This report has been undertaken to form part of applications to Noosa Shire Council in relation to the subject site. The application will be referred to the Department of Main Roads as a Concurrence Agency. An illustration of the layout of the full development of the retirement community (which includes Stage 1 and Stage 2) is provided on Drawing No, 0588_TP_04 from Smith and Tracey Architects, refer Appendix A. The first stage of the development will implement a 120-unit Aged Care Facility, a 20-unit apartment building, a ‘community’ building, and 73 Independent Living Units (ILU's). This is anticipated to be completed by 2009. A second stage would see an additional 18-unit apartment building, and 45 additional ILU's. The second stage of development is expected to be completed prior to 2019. The existing traffic conditions were identified and the potential impacts of the traffic associated with the proposal were assessed. In particular, the Elm Street / Pearsons Road intersection, the Pearsons Road / Trading Post Road intersection, and the Elm Street / Diamond Street intersection were assessed up to a design horizon year of 2019 without and with the traffic associated with the development. A summary of the conclusions is provided in Section 6.0 within this report. 3427-0001(1}-Final.dec: 04/12/07
Section 7
2.Existing Conditions 2.1 Subject Site The subject site is approximately 9.5 ha in area, described as Lot 1 on RP215922 on Trading Post Road, Cooroy, Parish of Tewantin, Shire of Noosa. The subject site is currently a vacant plot of land bounded by Elm Street to the west, Pearsons Road to the south, and Lamonts Road to the north. The main access to the site is currently proposed off from Trading Post Road, with a secondary access for the Aged Care Facility staff and service vehicles off Lamonts Road. The location of the site is shown on Figure Ai within Appendix A of this report. 2.2 Existing Road Network The existing roadway network in the immediate vicinity of the subject site is comprised of two Primary roads, named Elm Street (Cooroy Connection Road) and Diamond Street (Cooroy- Noosa Road). Both Elm Street and Diamond Road are two-lane, two-way roadways. Elm Street forms the western boundary of the subject site. Diamond Street intersects Elm Street approximately 1km south of the subject site. Figure 1 overleaf (and Figure A1 within Appendix A) illustrates the Cooroy Road network, highlighting roadways under the jurisdiction of the Department of Main Roads (DMR). This includes Elm Street (Road 145 under the DMR identification system), and Diamond Street (Road 142 under the DMR identification system). n 3427-001(1}-Final.doc: 04/12/07
Section 8
4 SUBJECT SITE | Mile SS QS 4 . Source: Department of Main Roads Traffic Census website, July 2007 Figure 1: Main Roads Road Network — Cooroy The subject site itself is to be served directly by Trading Post Road. Trading Post Road is largely unsealed with a width of approximately 7.0m and open drainage, as illustrated in Photo 1 below. The roadway is, however, sealed at the intersection with Pearsons Road. No traffic control is provided at the Pearson Road / Trading Post Road intersection, as illustrated in Photo 2, however being the minor leg of a T-intersection, Trading Post Road traffic must give way to traffic travelling along Pearsons Road. 3427-001(1}-Final.doc: 04/12/07
Section 9
Photo 2: Trading Post Road, looking south towards Pearsons Road. Pearsons Road connects Trading Post Road with Elm Street. Pearsons Road is a two-lane roadway serving predominantly residential development. The roadway is approximately 6m wide between Elm Street and Trading Post Road. The roadway intersects Elm Street at the south- western comer of the subject site. Pearsons Road has a give-way control at the intersection. The configuration of the T-intersection is illustrated in Photo 3 below. At the intersection, Elm Street has a speed limit of 6OknVh. North of the intersection, however, the speed limit increases to 80km/h, then 100knVh further to the north. Photo 3: Pearsons Road looking west at Elm Street. Site investigations identified no significant visibility issues for vehicles exiting Pearsons Road onto Elm Street. Lok : sae www.mreagney.com ‘consittants in tansportation 3427-001(1)-Final.doc: 04/12/07
Section 10
Lamonts Rd forms a T-intersection with Elm Street to the north-west of the subject site. It is currently an unsealed road, which carries a minimal volume of traffic. Access to the proposed staff car park for the Aged Care Facility is proposed off the southern side of Lamonts Rd. Diamond Street connects with Elm Street and the access to the Cooroy Railway station. The intersection is approximately 1.25km south of the intersection of Elm Street / Pearsons Road. Diamond Street has a stop control at the intersection. The configuration of the intersection is illustrated in Photo 4 below. At the intersection, Diamond Street is a two-lane, two-way road. The approach to Elm Street has one right-turn lane and a left-turn slip lane for motorists existing to Elm Street, southbound. Photo 4: Diamond Streat looking at Elm Street 2.3 Existing Traffic Volumes Manual traffic surveys were undertaken by Australasian Traffic Surveys on the 20" of June, 2007 in order to provide a basis for the assessment of future traffic operations. The intersections surveyed were as follows: e Elm Street at Pearsons Road; e lm Street at Diamond Street; and e Pearsons Road at Trading Post Road. These surveys documented traffic volumes segregated by turning movement at the above noted intersections in 15-minute intervals during both the AM and PM road peak periods (7:00am- 9:30am and 3:30pm-6:00pm). To supplement the survey data, historical 24-hour count data for Elm Street north of Pearsons Road was obtained from the DMR for the 2000-2006 period. The full results of these surveys www.mreagriey.com consuitants in transportation 3427-001(1}-Final.doc: 04/12/07
Section 11
are included in Appendix D. The 2007 traffic volumes are summarised on Figure B1, Appendix B. The survey results determined that the AM peak period for the external road network occurred between 8:00am and 9:00am, and the PM peak period for the external road network occurred between 4:45pm and 5:45pm. Traffic volumes surveyed during these peak hour periods were incorporated into the analysis of existing and future conditions to estimate the traffic-related impacts of the proposed development on the external road network. : Discussions with DMR staff have indicated that growth rates on Elm Street, based on the previous 5-year survey data at multiple sites along Elm Street (Cooroy Connection Road), have been in the order of 3% per annum. This figure represents the growth assumed by DMR for their road maintenance operations. 3427-001(1}-Final.doc: 04/12/07
Section 12
3.Proposed Development 3.1 Description The proposed development is to be a residential retirement community. The subject site is approximately 9.5 ha in area, described as Lot 1 on RP215922 on Trading Post Road, Cooroy. The ultimate RSL Care Cooroy Retirement Village development will comprise the following: 120-bed residential care facility; 38 2-bed apartments; 118 residential lots; and Amenities (pool, multi-purpose ‘community’ building). ~eeee An illustration of the proposed iayout of the development is provided on drawing number: 0588_TP_04 in Appendix A. 3.2 Development Access The subject development is proposed to provide two accesses. The main access to the site is proposed off Trading Post Road, with a secondary access for staff of the Aged Care Facility and service vehicles proposed off Lamonts Road. The main access to the development is to be from Trading Post Road, via Pearsons Road. The access will be directly from the northem end of the roadway, approximately 190m from the Trading Post Road / Pearsons Road intersection. This access is proposed to accommodate all residential traffic into and out of the development. In addition, the plan proposes an additional staff and service access from Lamonts Road. Activity at this access is expected to be minimal. For the purposes of the traffic assessment, it was assumed that 100% of the traffic accessing the site would do so via Pearsons Road. 3.3 Car Parking Parking provisions for the proposed development are to be provided in accordance with the requirements set-out in Council's town planning scheme. 3.4 Servicing and Manoeuvring Internal vehicle circulation will be assessed separately by others, and was therefore has not included in this report. 9427-001(1}Final.doc: 04/12/07
Section 13
3.5 Trip Generation
The trip generation exercise was split into the two phases of the proposed development. Given
the staged implementation of the development, and the uncertainty in completion of the second
stage of development (i.e. some time prior to 2019), the trip generation was estimated for both
the initial stage (referred to as Stage 1) and the ultimate development (referred to as Stage 2).
While Stage 1 has been assumed to be completed and operational by 2009, the completion of
Stage 2 is planned to be operational before 2019. For this, analysis up to a horizon year of 2019
was undertaken.
Recognising the likely mix of trip generation rates and directional split of traffic generated by the
various types of residential developments within the retirement community, each residential type
was assessed separately, and the resulting sub-totals were summed to estimate a total
development trip generation.
Trip generation rates were based on the NSW Roads and Traffic Authority (RTA)'document.
This data was supplemented with figures from the Institute of Transportation (ITE) Engineers Trip
Generation Manual (7* Edition). The directional distribution split data was taken directly from the
ITE Trip Generation Manual.
The following table summarises the results of the Stage 1 trip generation analysis.
Table 1: Stage 1 Trip Generation by Type
Type Number of Units/Beds Peak Hour Trips Tota! Trips In/Out Spiit*
per Unit AM (PM) AM (PM)
AM (PM)
Residential Cara 120 ~ 0.2 (0.2) “24 (24) 73%/27% (52%/48%)
Facility
Apartments. 20 0.29 66) 45%/55% (61%/39%)
Residential Lots 73 0.29 (0.53) 21(39) = 38% /E2% (61%/39%)
‘Total 213 Wa “61 (69) 51%/49%
{59%/41%)
“per ITE Trip Generation Manual - Senior Adult Housing
The following table summarises the results of the ultimate (i.e. Stage 1 + Stage 2) development
trip generation exercise.
' "Guidelines to Traffic Generating Developments”, RTA, Issue 2.2 October 2002.
27-001(1}Final.doc: 04/12/07
Section 14
Table 2: Ultimate Trip Generation by Type Type Number of Peak Hour Total Trips In/Out Split* Units/Beds Trips per Unit AM (PM) AM (PM) AM (PM) Residential Care 120 0.2 (0.2) 24 (24) 73%/27% Facility (52%/48%) Apartments 38 0.29 11 (11) 45%/55% (61%/39%) Residential Lots 118 0.27 (0.47) 32 (55) 38%/62% (61%/39%) Total 276 ta 67 (90) 51%/49% _ (59%6/41%) “per ITE Trip Generation Manual — Senior ‘Adutt Housing 3.6 Trip Distribution As discussed in Section 3.2, the proposed site layout is to provide two accesses: a main access for residents from the end of Trading Post Road; and a second staff/service access from Lamonts Road to the north. For the purposes of this analysis, however, it was conservatively assumed that 100% of the daily generated traffic would access the site via the Trading Post Road. This approach would provide a conservative estimate of the impacts of the development on Trading Post Road. However, the volume of traffic that would access the site was assumed to be minimal and would not significantly affect the traffic operations or the results of the analysis. It was assumed that 100% of the traffic would be destined to Elm Street via Pearsons Road as there would appear to be no relevant destinations on Pearsons Road east of the proposed development. At the intersection of Pearsons Road and Elm Street, both inbound and outbound traffic was assumed to be distributed according to the directional split of existing traffic at the intersection. - The assigned generated traffic in 2009 (stage 1) and 2019 (ultimate) are illustrated on Figures B7 to B10. www.mrcagney.com consultants in ttansportation. 3427-001(1)}-Final.doc: 04/12/07
Section 15
4 Future Conditions As discussed in Section 1.0 of this report, for the purposes of the following traffic analysis, the “Base Year” for assessing of the impact of the proposed development was 2009 as this represents the likely completion date of the first stage of the Retirement Village development. The planning horizon, therefore, was 2019. The critical intersections during the base scenarios in the vicinity of the site are considered to be: « Elm Street at Pearsons Road; and e¢ Elm Street at Diamond Street. Only the above intersections have been analysed for the base scenarios as it surveys established that the traffic currently using Trading Post Rd was negligible. 4.1 2009 Base Traffic Operations Estimating the likely growth rate for the background traffic over the next 2 years took into account historical growth rates from traffic surveys on Elm Street conducted by the Queensland Department of Main Roads (DMR). DMR staff indicated that a traffic growth of approximately 3% (compound) per annum would be appropriate for Elm Street, as discussed in Section 2.3. This is in contrast to the Shire’s population, which is recorded to have grown by only 2.3%? over the 2000-2005 period. Interestingly, over the 2005-2006 period, the population has stabilised within Noosa Shire, growing by less than 1% while the traffic volumes have continued to grow significantly, indicating that the traffic growth could be the result of growth in pass-through and tourist traffic. Adopting DMR’s recommended growth rate of 3% p.a. (compound), the base traffic volumes in 2009 during the AM and PM peak periods have been determined and are illustrated on Figures B3 and B4 within Appendix B herein. The following table summarises the results of a traffic operational assessment for the three key intersections that could potentially be affected by the proposed development for the 2009 base year. The assessment of these intersections was undertaken utilising SIDRA3.2. The base 2009 Intersection Movement Summary output data sheets are provided in Appendix C. SIDRA generated configurations of the existing intersections are shown as Figures 2 and 3 overleaf. ? Noosa Shire Financial Sustainability Review, Section 4, December 2006 3427-001(1}-Final doc: 04/1207
Section 16
11 Elm N Diamond E Elms Figure 2: Existing Diamond St / Elm St Intersection EimN Pearsons Elm S Figure 3: Existing Eim St / Pearsons Rd Intersection www.mrcagney.com consultants in transportation 3427-001 (1}Final.doc: 04/12/07
Section 17
Table 3: 2009 Base Case Traffic SIDRA Analyses rat eter Highest | Highest 95th | honest Level Of Intersection Intersection 9 Degree of %ile back of Delay Service Saturation Queue (m L.O.S) (vph) * | too) | +S) AM Peak Hour (8:00 - 9:00) Eim Street / . 4, Diamond Street 1,776 0.54 33 34.2 D Elm Street / Pearsons Road 839 0.29 14 11.8 B PM Peak Hour (15:45 — 16:45) Elm Street / , Diamond Street 1.644 oat 2 27.8 D Elm Street / 835 0.23 16 0.23 B Pearsons Road Note: Practical Maximum Degree of Saturation (X,) for unsignalised intersections is 0.80. Acceptable Level of Service — LOS 'C’ According to Table 3, the Elm Street / Diamond Street intersection and the Elm Street / Pearsons Road intersection would operate within acceptable limits during the base year of 2009. 4.2 2019 Base Traffic Operations Population growth in the Shire is expected to remain relatively stable over the next 10 years, reaching the Shire Council's maximum population levels as per the Council's planning scheme in FY2013. As such, a conservative growth rate of 3% (compound) per annum was maintained throughout the planning period of 2009-2019. Traffic volumes during the 2019 AM and PM peak are illustrated in Figures B5 and B6. The following table summarises the results of a traffic operational assessment for the three key intersections that could potentially be affected by the proposed development for the 2019 planning horizon year. The base 2079 Intersection Movement Summary for the intersections is provided in Appendix C. 3427-001(1}-Final.doc: 04/12/07
Section 18
AM PEAK TRAFFIC GENERATIONS (2009) Elm St £lm St ‘Es Elen St — gz H Pearsons St Diamond St SUBJECT SITE 22) frading Post Rd oF Pearsons St = [28]. Pearsons 5¢/ —— Pearsons St cy P Trading Post Rd oS 3427 - Cooroy Ratiremens Community - Trading Post Rd FIGURE B7
Section 19
BASE CASE PM PEAK (2019) GROWTHRATE= —_—- 3.00% Elm St €im st/ Pearsons St ¢ i Elm st | Elm stf Di St SUBJECT SITE Pearsons St PCa ae, [ass] 339] | Elm st & Le Diamond St J CE Trading Post Rd Pearsons St/ Trading Post Ad 4 SS Pearsons St PM Units: Vehicles Per Hour Peak Period : 4:45pm- 5:45am 3427 - Cooroy Retirement Community - Trading Post Rd FIGURE B6-
Section 20
BASE CASE AM PEAK (2019) GROWTH RATE = 3.00% SUBJECT SITE a |. & g 2 3 om) tmst/ a, Pearsons St =<? Pearsons St/ uw Pearsons St a st 70) (__34l Trading Post Rd Cos Casta} a z [sasf ase} AM Unit: Vehicles Par Hour tmst/ 100, Diamond St Peak Parlod : 8:00am - 9:00am os St 516) 3427 - Cooray Ratiremenr Commisnity - FIGURE BS Trading Post Rd
Section 21
BASE CASE PM PEAK (2009)
Elm St
Elm St
GROWTHRATE= —_3.00%
[4 wy Pearsons St
Peak Perfod : 4:45pm - 5:45am
SUBJECT SITE
2
é
£
2
[se] a
Elm st/ Pearsons St me Pearsons St/
Pearsons St ‘Trading Post Rd
=. Bal
em st/ [i Diamond st
oO st —
360]
{_3ai[”_297]
Elm St
3427 - Cooray Retiremens Commentty -
‘Tracing Post Rd
FIGURE B4
Section 22
BASE CASE AM PEAK (2009) Eim St Elm St GROWTH RATE = 3.00% SUBJECT SITE ; Elm St 28 Trading Post Rd Pearsons St/ ay parsons St Trading Post Rd AM Units: Vehicles Per Hour Peak Period : 8:00am - 9:00am 3427 - Cooroy Retlremens Community - ‘Trading Post Rd FIGURE 63
Section 23
EXISTING PM PEAK (2007)
Elm St
2
J
g
ca
Pearsons St
Elm St
gz
2
2
=
SUBJECT SITE
107]
ig
>
Elm St
339]
J | |
(Sra
PM Units: Vehicles Per Hour
Diamond St Peak Period : 4:45pm - 5:45am
Pesrsons St 3a Pearsons St/ Fa Pearsons St
T>{L_24} Trading Post Rd Sr
3477 - Cooroy Retiremenr Community -
Trading Post Rd
FIGURE 82
wwwanrcagney.com constants in transportation
Section 24
EXISTING AM PEAK (2007) Eim St SUBJECT SITE Pearsons St Elm St Etrn St 49) 70; 362 rading Post Rd AM Units: Vehictes Per Hour Peak Period : 8:00am - 9:00am a su me Pearsons St L_24 ‘Trading Post Rd L_33] <=> 3427 - Cooroy Retiremens Coramunity - Trading Post RO FIGURE B1 www mrcagnay.com consultants in tr
Section 25
Figure B1 Figure B2 Figure B3 Figure B4 Figure BS Figure B6 Figure B7 Figure B8 Figure B9 Figure B10 Figure B11 Figure B12 Figure B13 Figure B14 Appendix B Existing 2007 AM Peak Traffic Volumes Existing 2007 PM Peak Traffic Volumes Base Case 2009 AM Peak Traffic Volumes ” Base Case 2009 PM Peak Traffic Volumes Base Case 2019 AM Peak Traffic Volumes Base Case 2019 PM Peak Traffic Volumes , 2009 AM Peak Traffic Generation Traffic Volumes 2009 PM Peak Traffic Generation Traffic Volumes Horizon Year 2019 AM Peak Traffic Volumes Site Traffic 2019 PM Peak Traffic Volumes Design 2009 AM Peak Traffic Volumes Design 2009 PM Peak Traffic Volumes Design 2019 AM Peak Traffic Volumes Design 2019 PM Peak Traffic Volumes 3427-001(1}-Final.doc: 04/12/07
Section 26
TO SUBJECT SITE Full Size A3 30 40m ) 1500 oe McCormickRankinCagney THIS LAYOUT IS INDICATIVE ONLY. IT HAS NOT BEEN THE SUBJECT OF DETAILED DESIGN OR SURVEY. 3427-02.0WG PROPOSED FUNCTIONAL LAYOUT OF THE \, £LM STREET/PEARSONS ROAD INTERSECTION Thin SEPTEPEER 2007 COOROY RETIREMENT COMMUNITY | FiGuRE Az )
Section 27
" See a ssusenvueresse puttin __ OCEAN MIEW On Ne GBs [am Kh Ezn . 400 200 9 400 800 1200 1600mm 1:20 Loo l 2 1 1 1 1 l 1 L a. J _ Full Size Ad . 3427-01.0WG LOCALITY PLAN ) “sth JULY 2007 McCormickRankinCagney | | COOROY RETIREMENT COMMUNITY | eicupe At )
Section 28
Department of Main Roads Road Planning and Design Manual 13.7.10 Right Turn Treatments - Rural Conditions There are two fundamental types of right turn treatments for rural areas given in this section: e Type BAR _ shoulder (minimum treatment); widening ¢ Type CHR pavement widening with a right turn bay. A subset of this type is the CHR(S). Chapter 13 intersections at Grade Generally these treatments are applied to two-lane two-way rural roads. 13.7.10.1 Basic Right Turn Treatment (BAR) on a Two- Lane Rural Road This is the minimum treatment for right turn movements from a through road to side roads and local access points. It is detailed in Figure 13.58. ‘¢ lt ts preferred that the widened shoukter is sealed, unless the shoulder can be maintained with @ sound and everi surface. A 100m s§ x 15.0m A C= Onstraights - 6.5m minimum 3 x mr I W= Nominal through lane width (m) (including widening for curves). Width to be continuous through the intersection. - 7.0m minimum for Type | & Type 2 Road Trains On curves + widths as above + curve widening (based on widening for the design turning vehicle plus widening for the design through vehicle) A= O5xVxF 3.6 Increase length A on tighter curves. Where the design through vehicle is larger than or equa! to a 19m semi- trailer, the minimum speed used to calculate A is 80km/h. V= Design speed of major road approach (km/h) F= __ Formation/carriageway widening (m) S= Storage length to cater for one design tuming vehicle (m) (minimum length 12.5m) X= Distance based on design vehicle turning path, typically 10 - 15m Figure 13.58 Basic Right Turn Treatment (BAR) on a Two Lane Rural Road October 2006 13-95
Section 29
housing yield
2b+s8+29
2b+s+1g
2b + 19 (duplex)
total
smith+tracey architects
18
56
44
118
apartment building two |
ab 10
2b+s 8 |
total 18 |
(basement 18 cars + visitors}
exatng open Uh
stormmenier ually ”
ALOU
\
Q
\
community building
community bullding 550m
deck 100m?
Poot 16x5m
©1979 The copyright of this drawing Is vested solely and enttrely In Smith + Tracey Architects:
Om
cA ™
‘7
o
7
A etatt veoh 1,
exdsting apen -acoess from Lamonts Road y
stormwater guy, o
-
(4
an o
- me ‘7
+ 7
7 ay
a /
an i
Ce iQ
an i
‘K | i
« ! i
i
I i
{ !
a \ i epproximate tocation of ecfacent
| i extsiing reskdentiel bubdings,
I ,
= f
I bE i
I H
I Ph
fen
! =
#
i
i
ANY water a 2!
. ee < O
we residential aged care building
~~} Sy
for 120 bed
F yer . (75 car spaces + 12 caravan/boat)
“1 Ne
apartment building one
2b 12 ’
2b+s 8 (-
total 20 Lo.
{basement 20 cars + visitors} . \ /
ee
master plan
rsl care, cooroy
retirement village Ww
date. october 2007 deg. ro, OS88_TP_04
Beate: 1:1O00@A1, 12000@A3
Section 30
Appendix A Drawing No.0588_TP_04 Proposed Development Layout Plan Figure 13.58 Basic Right Turn Treatment (BAR) on a Two Lane Rural Road Figure Ai Locality Plan Figure A2 Proposed Functional Layout of Elm Street / Pearsons Road Intersection 3427-001(1)}-Final.doc: 04/1207
Section 31
23 6.9 Subject to adoption of the recommendations provided herein, there are no external traffic engineering reasons to preclude the development of the proposed residential retirement community at Trading Post Road in Cooroy. 3427-001(1)}Final.dec: 04/12/07
Section 32
6.Conclusions
6.1
6.2
6.3
6.4
6.5
66
67
68
It is proposed to develop a residential retirement community with the following:
120-bed residential! care facility;
N38 2-bed apartments;
4118 residential lots; and
Amenities (pool, multi-purpose building)
The subject site is to be located at Lot 1 on RP 215922 on Trading post Road, Cooroy,
Parish of Tewantin, Shire of Noosa.
The main access for the development is to be from Trading Post Road via Pearsons
Road, approximately190m from the Trading Post Road / Pearson’s Road intersection.
A secondary access for staff and service vehicles of the aged care facility is proposed
off the southern end of Lamonts Rd to the north-west of the subject site.
The peak hour traffic volumes estimated to be generated by the development would be
51vph during the AM peak and 69vph during PM peak for the initial stages and 67vph
during the AM peak and 90vph during the PM peak for the uttimate development.
According to the Department of Main Roads’ “Road Planning and Design Manual”,
Chapter 13, Figure 13.21, a right-tum lane is warranted at the Elm Street / Pearsons
Road intersection from Elm Street into Pearsons Road. A functional layout of the Elm
Street / Pearsons Road intersection, including the recommended right-turn bay, has
been included as Figure A2.
In relation to the proposed staff and servicing access for the proposed aged care facility,
the following is recommended:
* Upgrade the Lamonts Rd / Elm Street intersection to a BA standard in accordance
with the requirements of DMR’s “Road Planning and Design Manual” (extract
included within Appendix A of this report); and
* Provide a bitumen seal on Lamonts Rd between the proposed access and Elm
Street.
It was determined that the Elm Street / Pearsons Road (with a right-turn pocket) and
Pearsons Road / Trading Post Road intersections would operate well within acceptable
limits up to and beyond the design horizon year of 2019, with and without the
development.
The analyses indicated that the intersection of Elm Street / Diamond Street would
operate unsatisfactorily by 2019 without the traffic generated by the development and
would need to be upgraded to a signalised intersection by this time due to the growth of
background traffic.
3427-001{1)}-Final.doc: 04/12/07
Section 33
21 5.2.3 Pearsons Road / Trading Post Road Section 4.4 Unsignalised Minor Road Intersections within Austroads Part 5 states: ‘it is unnecessary to flare intersection approaches or carry out an intersection analysis when the combinations of major and minor road volumes are less than those in the Table’. The table being referred to is Table 4.1 — Intersection Capacity - Uninterrupted Flow Conditions which has been shown in Section 5.1.3 of this report. This table indicates that an assessment is not required if the peak hourly traffic volumes of the two-way major road and two-way minor road flows are less than those shown in the table. As illustrated on Figures B13 and B14 within Appendix B of this report, the 2009 future design traffic volumes at the Pearsons Road / Trading Post Rd intersection are expected to be below the combinations shown in Table 4.1 of Austroads Part 5. Therefore, intersection capacity analysis at this intersection is not required. Therefore, the introduction of the traffic generated by the proposed development will have minimal impacts on the capacity or operations of the intersection of Pearsons Road and Trading Post Road following implementation of the ultimate development in 2019. 5,3 Other Site Access Considerations At the northern end of the site, the site layout indicates a separate access for staff and service vehicles off Lamonts Rd, approximately 40m east of Elm Street. Lamonts Rd is currently an unsealed road that forms an intersection with Elm Street. While this access will likely experience minimal turning volumes, at this point Elm Street has a speed limit of 8OknVh, with an increase to 100 krvh immediately north of the proposed access, it is recommended that the following works be undertaken: Upgrading the Lamonts Rd / Elm Street intersection to a BA standard in accordance with the requirements of DMR's “Road Planning and Design Manual” (extract included within Appendix A of this report); and Providing a bitumen seal on Lamonts Rd between the proposed access and Elm Street. Further consideration should be given to reducing the speed limit along Elm Street to reflect the emerging community development that is occurring in the area. wwwumnrcagney.com consultants in transportation 3427-001(1)-Final.doc: 04/12/07
Section 34
The analysis indicates that, provided the intersection is signalised (by others), the Elm Street /
Diamond Street intersection will function at a satisfactory degree of saturation into and beyond
the planning horizon year of 2019 with the combined base traffic volumes and those of the
ultimate development proposal.
It should be noted that the traffic generated by the proposal appears to have a minimal impact
on the operation of the intersection, as it only results in an increase in the maximum degree of
saturation of 0.02 for the critical movement over the base case for the 2019 scenario. This is a
reflection that the development represents less than 5% of the traffic through the intersection.
Therefore, no works are required at this intersection as a consequence of the development.
5.2.2 Elm Street / Pearsons Road Intersection
The results of the traffic analysis for the 2019 scenario including both base traffic and traffic
generated by the proposed development are presented in Table 9. The intersection Movement
Summary data (from SIDRA3.2) are provided in Appendix C.
Table 9: 2019 Design Intersection Analysis — Elm Street / Pearsons Road Intersection (with
Right Tum Lane from Elm Street)
Movement Volume Degree of Delay (s) 95” %ile Queue
Saturation 0) _{m)
AM Peak Hour
Elm Street South (1) 279 0.15 0 0
Elm Street South (R) 71 0.08 11.7 3
Pearsons Road East (L) 101 0.19 13.9 6
_Pearsons Road East (R) | 4 0.19 14.0 6
Elm Street North (L) 6 0.39 B82 0
Elm Street North (T) 734— 0.39 _O 0
PM Peak Hour
Elm Street South (1) 515 0.27 0 0
Elm Street South (R) |. 90 0.09 10.6 3
Pearsons Road East (L) 56 0.12 ; 13.6 4
Pearsons Road East (R) 12 0.12 13.5 4
Elm Street North (L) 6 0.29 8.2 0
Elm Street North (T) §33 0.29 0 0
Note: Practical Maximum Degree of Saturation (X,) for unsignalised intersections is 0.80.
The analysis indicates that introduction of the traffic generated by the proposed development will
have minimal impacts on the capacity or operations of the intersection of Elm Street and
Pearsons Road following implementation of the ultimate development by 2019, provided the
recommended intersection improvements are undertaken (i.e. construction of a right-turn bay
from Elm Street into Pearsons Road as shown on Figure A2 within Appendix A of this report).
3427-001(1}-Finat.doc: 04/12/07
Section 35
19
Type Number of Units/Beds
Residential Care Facility 120
Apartments 38
Residential Lots 118
Total 276
The traffic generation analysis discussed in Section 3.5 indicates that this residential unit
composition will likely generate traffic in the order of 67 trips in the AM peak period, and 90 trips
in the PM peak period.
These traffic volumes were applied to the base traffic volumes forecast for 2019 to assess the
potential long term impacts of the proposed development on the external road network, The
traffic analysis software package SIDRA 3.2 was applied to provide an indication of the potential
impacts. The results of the assessment are presented in the Sections 5.2.1 through 5.2.3.
The details of the trip generation calculations for Stage 2 are presented in Appendix A.
5.2.1 Elm Street / Diamond Street
It should be noted that, as discussed in Section 4.2, the intersection of Elm Street / Diamond
Street would operate outside of acceptable levels by the base year of 2019. Therefore, the 2019
design assessment has assumed that the Elm Street / Diamond Street intersection would be
signalised due to growth of background traffic. The results of the traffic analysis for the 2019
scenario including both base traffic and traffic generated by the proposed development are
presented in table 8. The intersection Movement Summary data (from SIDRA3.2) are provided in
Appendix C.
Table 8: 2019 Design Analysis - Elm Street / Diamond Street Signalised Option
Movement | Volume Degree of Delay (s) 95" %ile Queue
Saturation (} | (m)
AM Peak Hour
‘Elm Street South (1) 444 | 0.33 45 | 64
Elm Street South (R) 309 0.75 ; 427 | 106
Diamond Street (L) 516 0.63 18.3 108
Diamond Street (R) 106 0.45 49.1 45
Elm Street North (L) 367 0.46 13.4 54
Elm Street North (1) 708 0.74 18.6 181
PM Peak Hour
Elm Street South (1) 495 0.39 6.3 73
Elm Streat South (R) 399 0.67 30.9 100
Diamond Street (L) 483 0.46 13,2 70
Diamond Street (R) 165 0.63 45.1 61
Elm Street North (L) 272 0.39 16.4 48
Elm Street North (1) 478 0.68 22.9 125
Note: Practical Maximum Degree of Saturation (X,) for signalised intersections is 0.95.
www.mreagney.com consultants in transpai
3427-001 (1 Hinal.doc: 04/12/07
Section 36
5.1.3 Pearsons Road / Trading Post Road Section 4.4 Unsignalised Minor Road Intersections within Austroads Part 5 states: ‘it is unnecessary to flare intersection approaches or cany out an intersection analysis when the combinations of major and minor road volumes are less than those in the Table”. The table being referred to is Table 4.1 - Intersection Capacity - Uninterrupted Flow Conditions which has been shown below. This table indicates that an assessment is not required if the peak hourly traffic volumes of the two-way major road and two-way minor road flows are less than the following combinations: Tabte 4.1 — intersection Capacity - Uninternipted Flow Conditions Major Road Type! | Major Road Flow |. Minor Road Flow (veh? __ (vphp — 4 50 Two-tene 500 200 60 “100 re | 100 Fourtane 1500: 50 200 6 Notes: 1. Mejor med ls through med (ie. has prtorty). 2, Mlor road design vohirnes include through and tuming movements. 3, Minor med des'gn volenes include through and turing volumes, Source: Austroads Part 5-Intersections at Grade As illustrated on Figures B11 and B12 within Appendix B of this report, the 2009 future design traffic volumes at the Pearsons Road / Trading Post Rd intersection are expected to be below the combinations shown in Table 4.1 of Austroads Part 5 (above). Therefore, intersection capacity analysis at this intersection is not required. Therefore, the introduction of the traffic generated by the proposed development will have minimal impacts on the capacity or operations of the intersection of Pearsons Road and Trading Post Road following implementation of the first stage of development in 2009. 5,2 Stage 2 Development (201 9) As discussed in Section 3.5, the second stage (i.e. ultimate) development is to be comprised of the following residential units: 3427-001(1)}-Final.dec: 04/12/07
Section 37
17 Elm N Pearsons Elms Figure 5: Proposed Configuration of Pearsons Road and Elm Street Table 7: 2009 Design Analysis - Elm Street / Pearsons Road intersections (with Right Tum Lane from Elm Street) Movement Volume Degree of Delay (s) 95" %lla Queue Saturation ) | (m) AM Peak Hour Elm Street South (1) 208 0.11 0 0 Elm Street South (R) — 55 0.06 11.3 2 Pearsons Road East (L) 74 0.10 11.5 4 Pearsons Road East (R) 3 0.10 11.5 4 Elm Street North (L) 4 0.29 8.2 0 Elm Street North (1) | 546 0.29 : 0 0 PM Peak Hour Elm Street South (1) 383 0.20 0 0° Elm Street South (R) 67 0.06 9.9 2 Pearsons Road East (L) 43 0.07 11.4 2 Pearsons Road East (R) 9 "0.07 11.3 — 2 Elm Street North (L) 5 0.22 8.2 ‘0 Elm Street North (T) 397 0.22 0 0 Note: Practical Maximum Degree of Saturation (%,) for unsignalised intersections is 0.80. The analysis indicates that, in 2009, the intersection of Elm Street / Pearsons Road would function at an acceptable degree of saturation during both the AM and PM peak hour periods with the introduction of traffic generated by the proposed development. 3427-001(1} Final.doc: 04/12/07 ||”
Section 38
16-
Table 6: 2009 Design Analysis - Elm Street / Diamond Street
Movement Volume Degree of Delay (s) 95" %lle Queue
Saturation () (m)
AM Peak Hour
Elm Street South (1) 332 0.18 0 0
Elm Street South (R) 230 0.32 14.0 15
Diamond Street {L) 384 0.55 14.9 35
_ Diamond Street (R) 79 0.43 38.4 16
Elm Street North (L) 273 0.15 8.4 ; 0
Elm Street North (1) 527 0.28 0.1 0
PM Peak Hour
Elm Street South (1) 369 0.20 0 - 0
Elm Street South (R) 297 0.31 | 11.8 15
Diamond Street (L) 360 0.41 11.3 22
Diamond Street (R) 123 0.57 38.4 25
Elm Street North (L) 203 0.11 8.4 0
Elm Street North (1) 358 0.19 0.2 0
Note: Practical Maximum Degree of Saturation (X) for unsignalised intersections is 0.80.
The analysis indicates that, in 2009, the intersection of Elm Street / Diamond Street will continue
to function within an acceptable degree of saturation in both the AM and PM peak periods with
the addition of traffic generated by the proposed development.
5.1.2 Elm Street / Pearsons Road
The traffic distribution for the proposed development (discussed in Section 3.6) indicates that the
northbound right-turn movement at Pearsons Road was estimated to be approximately 55
vehicles, with an opposing through volume of approximately 550 vehicles in the AM peak hour.
Likewise, the northbound right-turn volume was estimated to be 67 vehicles with an opposing
volume of approximately 402 vehicles in the PM peak hour. According to the Department of
Main Roads’ “Road Planning and Design Manual”, Chapter 13, Figure 13.21, these volumes
warrant a separate right-tum bay from Elm Street into Pearsons Road. A functional layout of the
Elm Street / Pearsons Road intersection, including the recommended right-turn bay, has been
included as Figure A2.
The results of the traffic analysis for the 2009 scenario, including the base traffic, the traffic
generated by the proposed development and including provision of a right-turn pocket, are
presented in Table 7. The SIDRA3.2 Movement Summary output data sheets for the analysis
are provided in Appendix C.
A SIDRA generated configuration of the proposed upgrade is shown as Figure 5.
3427-001(1)}-Final.dec: 04/12/07
Section 39
5.lmpact of Generated Traffic on External Road Network As discussed in Section 3.5, the traffic analysis has been conducted in two stages, reflecting the likely completion date of the two phases of development. For the purpose of this report it has been assumed that the first, anticipated to be complete and operational by 2009, will inciude approximately 213 residential units. Following opening of Stage 1, the ultimate proposed development will be completed, resulting in a total of 276 residential units. The 2009 assessment was therefore conducted assuming the Stage 1 development was in place. The horizon-year of 2019 was assessed, assuming that the ultimate development would be completed and operational. The 2009 and 2019 design traffic volumes (i.e. base volumes plus traffic generation volumes) are illustrated on B11-B14 within Appendix B of this report. 5.1 Stage 1 Development (2009) As discussed in Section 3.5, the first stage of the proposed development is to construct the following residential units: Type : _ Number of Units/Beds Residential Care Facility = 120 Apartments , 20 Residential Lots 73 Total 213 The sum of these units is expected to generate traffic volumes in the order of 51 trips in the AM peak hour period, and 69 trips in the PM peak hour period. These traffic volumes were applied to the base traffic volumes forecast for 2009 to assess the potential impacts of the proposed development. The traffic analysis software package SIDRA 3.2 was applied to provide an indication of the potential impacts. The results of the assessment are presented in the Sections 5.1.1 through 5.1.3 5.1.1 Elm Street / Diamond Street The results of the traffic analysis for the 2009 design scenario, which includes both base traffic and the traffic generated by the Stage 1 of the proposed development, are presented in Table 6. The SIDRA3.2 Movement Summary output data sheets for the analysis are provided in Appendix on 15 3427-001(1)-Final.doc: 04/1207
Section 40
The SIDRA output data for this analysis are provided in Appendix C of this report.
Table 5 :2019 Base Case SIDRA Traffic Analysis (Elm Street / Diamond Street Intersection
Signalised)
Total
h
Traffic Highest Highest | tighest | [ahest
. 95th %lle Level Of
Intersection Entering Degree of Average
Intersection | Saturation ) back of Delay (sec) Service
Queue (m) yssec} | L.0.8)
(vph)
/ AM Peak Hour (8:00 - 9:00) -
Elm Street / .
Diamond Street 2,386 0.73 174 49 D
(Signalised)
PM Peak Hour (15:45 ~ 16:45)
Elm Street /
Diamond Street 2,213 0.72 115 38.4 D
{Signalised)
Note: Practical Maximum Degree of Saturation 0%} for unsignalised intersections is 0.95.
It would appear that signalisation of the Elm Street / Diamond Street intersection may be the
most cost effective means of mitigating the traffic capacity impacts on the intersection generated
by growth in background traffic. For the purposes of the subsequent assessment of the impacts
of the proposed development, it was assumed that the Elm Street / Diamond Street intersection
was signalised before 2019 due to growth of background traffic. Additional changes to the
broader road network may be being planned by DMR, which would reduce the pressure on this
intersection. However, these broader planning issues were not considered for this assessment.
Reconfiguring the intersection as a roundabout was also considered; however, given the
conflicting heavy westbound left-turn movement and heavy southbound through movement, a
roundabout configuration is not recommended. Further a roundabout does not provide
adequate provision for the likely high pedestrian movements within the town centre of Cooroy.
www.mrcagney.cam consuftants
3427-001(1)}-Final.dec: 04/12/07
Section 41
13
Table 4: 2019 Base Case SIDRA Traffic Analyses
Total Highest | Highest osth | “lshest | | evel of
Traffic Entering Average
Intersection Intersection Degree of %ile back of Delay Service
Saturation Queue (m! L.O.S
(vph) ® (m) (sec) { )
AM Peak Hour (8:00 — 9:00)
Elm Street /
Diamond Street 2,386 4.14 204 395.3 F
Elm Street / 4,127 0.39 18 14.0 B
Pearsons Road
PM Peak Hour (15:45 — 16:45)
Elm Street /
Diamond Street 2,209 1.04 141 207.1 F
Elm Street / 1,123 0.31 29 137 | - B
Pearsons Road
Note: Practical Maximum Degree of Saturation (X,) for unsignalised intersections is 0.80.
Acceptable Level of Service - LOS ‘C’
The 2019 “Base Case” analysis indicates that the Elm Street / Pearsons St intersection would
continue to perform within capacity; however, the Elm Street / Diamond Street intersection
would most likely exceed its capacity prior to 2019 and therefore will need to be signalised by
this time. The movements expected to experience significant delays would be the northbound
right-turn movement from Diamond Street to Elm Street.
The analysis was revised to incorporate a traffic signal at the intersection of Elm Street and
Diamond Street to mitigate the impacts of traffic growth. The results of the revised intersection
analysis are presented in Table 5 below. The layout of the intersection adopted for the SIDRA
analysis for the signalised intersection is illustrated as Figure 6.
x
li
E
Diamond E
II
g
Elms
Figure 4: Signalised Intersection layout adopted for SIDRA analysis
Elm Street / Diamond Street
3427-001(1}Final.doc: 04/12/07
Section 42
PM PEAK TRAFFIC GENERATIONS (2009) Elm st ading Post Rd SUBIECT SITE d | | Cait et Paarzons Sif — L_] Trading Post Rd Elm St rt ae) fim st/ [a Olamond St Ol St aa TP ( 242? - Coorey Retiremenr Community - Elm St Trading Post Rd Bt
Section 43
AM PEAK TRAFFIC GENERATIONS (2019) GROWTHRATE= _3.00% SUBJECT SITE Elm St Eimst/ tc, Pearsons St —- F4 sy FY Pearsons St Pearsons St = => ‘Trading Post Rd ¢ é C2 ay Eimst/ | 3427- Coorey Retirement Community - FIGURE 89 Trading Post Rd
Section 44
PM PEAK TRAFFIC GENERATIONS (2019) GROWTH RATE= _3.00% SUBJECT SITE Etm St rading Post Ré £4, ay kimst/ E = __ tems a Prarions St peanons Sf Ee _ Paanonsst st = = Trading Post Rd Elm Sst ‘Diamond St — a fy 3AT7 - Gooroy Retirement Community - FIGURE B10 Trading Post Rd Elm St a: wrew. mrcagney.com consultants in transports! ton
Section 45
BASE TRAFFIC + SITE AM PEAK (2009) Elm St J | Z Pearsons St [20855] l étm St Elm St SUBJECT SITE 2 z a 2 z ee Te) ay Pearsons St st] 28] Pe sv a Pearsons St ‘Trading Post Rd a) Tae AM Units: Vebictes Per Hour a) Diamond St Perk Period ; 8:00am - 9:00am 3e4}Ce 3427 - Corny Retiremenr Community - FIGURE 811 Trading Port Rd weew.mmrcigney.com consultants in tangpertation.
Section 46
BASE TRAFFIC + SITE PM PEAK (2009) Elm St Elm st Elm st SUBJECT SITE 2 8 2 Z = i a CsA g ste, Pearsons St —7_a a Pearsons St etn st/ L Pearsons St/ st = =A Trading Post Rd L316 cima [254] 203] PM Units: Vehicles Par Hour Etm St/ Diamond St Peak Period : 4:45pm - 5:45am Blamend st [_370[_297} 3427 - Cooroy Ratiramanr Community - FIGURE B12 ( Treading Post Rd -Wenemrcagnay.com consuttants in transportation *
Section 47
PLY aa ea aa ee) Elm St Em st/ Pearsons St Elm st SUBJECT SITE a 102) €lm st ‘Diamond St 516] 2 2 é 2 2 £ Lst=T “9 pesrons ot Pearsons St ‘Trading Post Rd L_s4] - AM Units: Wehictes Par Hour Peak Perlod: 8:00am -9:00am 3427 - Cooroy Retirement Commumity - FIGURE B13 ‘Trading Post Rd www mrcagney.com eonsultanis in trancpertation
Section 48
BASE TRAFFIC + SITE PM PEAK (2019) SUBJECT SITE a & & [s33[__ 4] etm st / —— Pearsons St = 56 Fa € Elmst/ 165 0 = s aay [496] Eim St Diarnond St Pearsons St PCa — PM Units: Vehicles Per Hour Peak Period : 4:45pm - 5:45am 2 é = 2 L399) ns St/ Pearsons St Trading Post Rd ES 3427 - Cooroy Ratiremanr Community - FIGURE B24 Trading Post Rd www.mreagney.com consultants in tangpartation
Section 49
Appendix C
SIDRA3.2 ‘Movement Summary’ Output Data
u
€ec¢eete eke ee &€ ete &€ & ee vee
2009 Base AM - Elm at Diamond
2009 Base PM - Elm at Diamond
2009 Base AM - Elm at Pearsons
2009 Base PM - Elm at Pearsons
2019 Base AM - Elm at Diamond
2019 Base PM - Elm at Diamond
Signalised 2019 Base AM - Elm at Diamond {with phasing)
Signalised 2019 Base PM - Elm at Diamond {with phasing)
2019 Base AM - Elm at Pearsons
2019 Base PM - Elm at Pearsons
2009 Design AM - Elm at Diamond
2009 Design PM - Elm at Diamond
2009 Design AM - Elm at Pearsons
2009 Design PM - Elm at Pearsons
Signalised 2019 Design AM - Elm at Diamond (with phasing)
Signalised 2019 Design PM - Elm at Diamond (with phasing)
2019 AM Design - Elm at Pearsons
2019 PM Design - Elm at Pearsons
3427-001(1)-Final.doc: 04/12/07
Section 50
Movement Summary Page 1 of 1 S| DRA INTERSECTION Movement Summary Elm St / Diamond St Intersection 2009 AM Base Give-way Vehicle Movements ~ _ 95% Dem Deg of Aver Aver MovID = Turn Flow %HV Satn Delay evel a Queue Quon d Eft Stop Speed (veh/h) (v/c) (sec) (m) (km/h) Elm $ 2 T 311 10.6 0.171 0.0 LOS A o 0.00 0.00 60.0 3 R 230 10.0 0.308 13.7 LOS B 15 0.67 0.93 43.8 Approach 541 10.4 0.308 5.8 LOSA 1s 0.28 0.40 51.9 Diamond E 4 L 384 5.5 0.541 14.5 LOS B 33 0.70 1.03 493.2 6 R 74 8.14 0.368 34.2 Los 0 14 0.88 1.06 31.9 Approach 458 5.9 0.541 17.7 tosc 33 0.73 1.03 40.9 Elm N 7 L 265 $.3 0.148 8.4 LOS A 0 0.00 062 49.0 8 T $12 6.1 0.273 O12 LOS A 0 0.00 0.01 60.0 Approach 777 5.8 0.273 2.9 LOSA 0.00 0.24 58.7 Not All Vehicles 1776 7.2 0.541 7.6 Applicable 33 0.28 0.49 49.9 Symbols which may appear in this table: Following Degree of Saturation # x = 1.00 for Short Lane with resulting Excess Flow * x = 1.00 due to minimum capacity Following LOS # - Based on density for continuous movements Following Queve # - Density for continuous movement SIDRA SOLUTIONS Site: 2009 AM Elm at Diamond T:\3400-3499\3427 - Cooroy Retirement Community\SIDRA\Elm and Diamond Nov 28.aap Processed Nov 28, 2007 04:38:55PM A1059, McCormick Rankin Cagney, Large Office Produced by SIDRA Intersection 3.2.1.1478 Copyright 2000-2007 Akcelik and Associates Pty Ltd www. sidrasolutions.com about:blank 29/11/2007
Section 51
Movement Summary Page 1 of 1 SIDRA -™ INTERSECTION Movement Summary Elm St / Diamond St Intersection 2009 PM Base Give-way Vehicle Movements 95% Dem Deg of Aver Aver MovID Turn Flow %HV ~ Satn Delay revel of Queue quene ! Err Stop Speed (veh/h) (w/c) (sec) (m) (km/h) Elms : 2 T 341 1.2 0.176 0.0 LOS A 0 0.00 0.00 60.0 3 R 297 3.0 0.276 10.8 LOS B 12 0.57 0.80 46.3 Approach 638 2.0 0.276 5.0 LOSA 12 0.27 0.37 52.7 Diamond E 4 L 360 5.0 0.392 11.0 LOS B 2t 0.57 0.83 46.4 6 R 114 3.5 0.407 27.8 LOS DB 16 0.85 1.08 35.0 Approach 474 4.6 0.408 15.0 Los c 21 0.64 0.89 43.1 tlm N 7 L 194 8.8 0.111 8.5 LoS A Oo 0.00 0.67 49.0 8 T 338 5.6 0.180 0.0 LOS A 0 0.00 0.00 60.0 Approach 532 6.8 0.180 3.1 LOSA 0.00 0.24 55.4 Not All Vehicles 1644 43 0.407 7.3 Applicable 21 - «0.29 0.48 50.2 Symbols which may appear in this table: Following Degree of Saturation # x = 1.00 for Short Lane with resulting Excess Flow * x = 1.00 due to minimum capacity Following LOS # - Based on density for continuous movements Following Queue # - Density for continuous movement +- SIDRA SOLUTIONS Site: 2009 PM Elm at Diamond T:\3400-3499\3427 - Cooroy Retirement Community\SIDRA\Elm and Diamond Nov 28.aap Processed Nov 28, 2007 04:38:56PM A1059, McCormick Rankin Cagney, Large Office Produced by SIDRA Intersection 3.2.1.1478 Copyright 2000-2007 Akcelik and Associates Pty Ltd www. sidrasolutions.com about:blank 28/11/2007
Section 52
Movement Summary ; Page 1 of 1 SIDRA “~~ INTERSECTION Movement Summary Elm St / Pearsons Rd intersection 2009 AM Base Glve-way Vehicle Movements 95% Dem Deg of Aver Aver MovID Tum Flow = %HV — Satn Delay ever Sf Mack of queved FFT StOP Speed (veh/h) (v/e) (sec) (m) (km/h) tims 2 T 208 10.6 0.144 2.9 LOS A 11 0.58 0.00 $2.7 3 R 29 10.3 0.144 11.8 Los B 11 0.58 0.80 45.6 Approach 237 10.5 0.144 4.0 LOSA 11 0.58 0.10 51.8 Pearsons 4 L S2. 1.9 0.072 11.4 Los B 2 0.53 0.78 45.7 6 R 2 0.0 0.071 11.6 Los B 2 0.53 0.86 45.4 Approach 54 1.9 0.072 11.4 tosB8 2 0.83 0.78 45.7 Elm N 7 L 2 0.0 0.286 8.2 LOS A oO. 0.00 0.67 49.0 8 T 546 4.9 0.290 0.0 LOSA 0 0.00 0.00 ~ 60.0 Approach 548 4.9 0.290 0.0 LOSA 0.00 0.00 60.0 Not All Vehicles 839 6.3 0.290 1.9 Applicable 11 0.20 0.08 56.3 Symbols which may appear tn this table: Following Degree of Saturation # x = 1.00 for Short Lane with resulting Excess Flow * x = 1.00 due to minimum capacity Following LOS # - Based on density for continuous movements Following Queue # - Density for continuous movement + SIDRA SOLUTIONS Site: 2009 AM Elm at Pearsons T:\3400-3499\3427 - Cooroy Retirement Community\SIORA\Pearsons and Elm Nov 28.aap Processed Nov 28, 2007 04:51:02PM A1059, McCormick Rankin Cagney, Large Office Produced by SIDRA Intersection 3.2.1.1478 Copyright 2000-2007 Akcelik and Associates Pty Ltd www, sidrasolutions.com about:blank 28/11/2007
Section 53
Movement Summary Page 1 of 1 SIDRA “~ INTERSECTION Movement Summary Elm St / Pearsons Rd intersection 2009 PM Base Give-way Vehicle Movements 95% Dem Deg of Aver Aver MovID = Turn Flow HV Satn Delay evel ef osue, quan, ‘d Err. Stop Speed (veh/h) (v/c) (sec) (m) (ian/h) Elms 2 T 383 2.9 0,225 1.9 LOSA 16 0.54 0.00 53.2 3 R 30 0.0 0.224 10.3 LOS B 16 0.54 0.75 46.6 Approach 413 2.7 0.225 2.5 LOSA 16 0.54 0.05 52.7 Pearsons 4 L 19 5.3 0.031 11.3 LOS B 1 0.49 0.69 46.0 6 R 4 0.0 0.031 11.3 LOS B 1 0.49 0.81 45.7 Approach 23 43 0.031 11.3 loss 1 0.49 0.71 45.9 Elm N 7 u 2 0.0 0.222 8.2 LOS A 0 0.00 0.67 49.0 8 T 397 8.3 0.216 0.0 LOS A 0 0.00 0.00 60.0 Approach 399 8.3 0.216 0.0 LOSA 6.00 0.00 59.9 Ali Vehicles 835 S.4 0.225 1.6 Not 16 0.28 0.05 55.7 ° - “Applicable . . . Symbols which may appear in this table: Following Degree of Saturation # x = 1.00 for Short Lane with resulting Excess Flow *x = 1.00 due to minimum capacity Following LOS # - Based on density for continuous movements Following Queue # - Density for continuous movement + SIDRA SOLUTIONS Site: 2009 PM Elm at Pearsons T:\3400-3499\3427 - Cooroy Retirement Community\SIDRA\Pearsons and Elm Nov 28.aap Processed Nov 28, 2007 04:51:03PM A1059, McCormick Rankin Cagney, Large Office Produced by SIDRA Intersection 3.2.1.1478 Copyright 2000-2007 Akcelik and Associates Pty Ltd www, sidrasojutions.com about:blank 28/11/2007
Section 54
Movement Summary Page | of | SID = INTERSECTION Movement Summary Elm St / Diamond St Intersection 2019 AM Base Give-way Vehicle Movements 95% Dem Deg of Aver j Aver MovID Turn Flow %HV = Satn Delay «OVO! Of Queue. ques Katee os (veh/h) (w/c) (sec) (m) (km/h) Elm S 2 T 418 10.5 0.229 0.0 LOSA Qo 0.00 0.00 60.0 3 R 309 10.0 0.599 21.1 Los Cc 36 0.85 1.15 38.1 Approach 727 10.3 _ 0-599 9.0 LOSA 36 0.36 0.49 48.3 Diamond E 4 L 516 5.4 0.979 62.6 LOS F 204 0.99 2.79 22.3 6 R 100 9.0 1.136 395.3 LOS F 175 1.00 2.53 $.1 Approach 616 6.0 1.136 116.6 Los F 204 0.99 2.75 14.4 Elm N 7 Ll 356 5.3 0.199 8.4 LOSA QO 0.00 0.67 49.0 8 T 687 6.0 0.366 O41 LOSA Q 0.00 0.01 60.0 Approach 1043 5.8 0.366 2.9 LOS A 0.00 0.23 55.7 Alt Vehicles 2386 7.2 1.136 34.1 Not 204 0.37 0.96 31.2 . ° “" Applicable . * . Symbols which may appear in this table: Following Degree of Saturation # X= 1.00 for Short Lane with resulting Excess Flow ™x = 1,00 due to minimum capacity Failowing LOS # - Based on density for continuous movements Following Queue # - Density for continuous movement + SIDRA SOLUTIONS Site: 2019 AM Elm at Diamond T:\3400-3499\3427 - Cooroy Retirement Community\SIDRA\EIm and Diamond Nov 28.aap Processed Nov 29, 2007 01:32:20PM A1059, McCormick Rankin Cagney, Large Office Produced by SIDRA Intersection 3.2.1.1478 Copyright 2000-2007 Akcelik and Associates Pty Ltd www.sidrasolutions.com about:blank 29/11/2007
Section 55
Movement Summary Page 1 of 1 SIDRA -~ INTERSECTION Movement Summary Elm St / Diamond St Intersection 2019 PM Base Give-way Vehicle Movements 95% Dem Deg of Aver Aver MovID Tur Flow %HV Satn Delay ‘LVI Of ‘Queue queued Et St? speed (veh/h) (v/c)} (sec) (m) (km/h) Eims 2 T 458 La 0.237 0.0 LOS A 0 0.00 0.00 60.0 3 R 399 3.0 0.457 13.7 Los B 27 0.69 1.01 43.6 Approach 887 2.0 0.457 6.4 LOSA 27 0.32 0.47 51.1 Diamond E . 4 L 483 5.0 0.630 15.0 LOS B 47 0.73 1.10 42.8 6 R 153 3.9 1.041 207.1 LOS F 141 1.00 2.36 9.0 Approach 636 4.7 1.037 61.2 Los F 141 0.79 1.40 22.6 Elm N 7 L 261 8.8 0.149 8.5 LOS A 0 0.00 0.67 49.0 8 T 4s5 5.5 0.242 0.0 LOS A 0 9.00 0.00 60.0 Approach 716 6.7 0.242 3.1 LOS A 0.00 0.24 55.4 Not All Vehicles 2209 4.3 1.041 21.1 Applicable 141 0.35 0.66 38.2 Symbols which may appear in this table: Following Degree of Saturation # x = 1.00 for Short Lane with resulting Excess Flow * x = 1.00 due to minimum capacity Following LOS # - Based on density for continuous movements Following Queue # - Density for continuous movement + SIDRA SOLUTIONS Site: 2019 PM Elm at Diamond T:\3400-3499\3427 - Cooroy Retirement Community\SIDRA\Elm and Diamond Nov 28.aap Processed Nov 28, 2007 04:38:57PM A1059, McCormick Rankin Cagney, Large Office Produced by SIDRA Intersection 3.2.1.1478 Copyright 2000-2007 Akcelik and Associates Pty Ltd www.sidrasolutions.com about:blank 28/11/2007
Section 56
Movement Summary SIDRA INTERSECTION Movement Summary Page 1 of 2 Elm St / Diamond St Intersection (Signalised Option) 2019 AM Base Signalised - Fixed time Vehicle Movements Cycle Time = 90 seconds 95% Dem Deg of Aver Aver MovID Turn Flow %HV Satn Delay Level of ‘Queue queue 4 SOPs (veh/h) (vic) (see) (m) (km/h) Elm S 2 T 418 10.5 0.312 4.4 LOS A 60 0.37 0.33 53.5 3 R 309 10.0 0.731 41.0 LOS D 105 0.98 1.02 28.3 Approach 727 10.3. (0.731 19.9 LOSB 105 0.63 0.62 38.8 Diamond E 4 L 516 5.4 0.616 17.7 LOS B 106 0.71 0.81 40.6 6 R 100 9.0 0.430 49.0 LOSD 43 0.96 0.78 25.6 Approach 616 6.0 0.616 22.7. «+LOsC 106 0.75 0.80 37.1 Elm N 7 L 356 5.3 0.449 13.3 LOS B 52 0.39 0.74 44.0 8 T 687 6.0 0.716 18.3 LOS B 174 0.83 0.75 40.0 Approach 1043 5.8 0.716 16.6 LOSB 174 0.68 0.75 41,3 All Vehicles 2386 7.2 0.731 19.2 LOSB 174 0.68 0.72 39.4 Pedestrian Movements Aver 95% Mov ID Dem Flow Dela Levelof Back of Prop. Eff. Stop (ped/h) | sec) Service Queue Queued Rate (m) P1 53 39.2 LOS D 0 0.93 0.93 P3 53 12.3 LOS B 0 0.52 0.52 All Peds 106 25.7 Losc 0 0.73 0.73 Symbols which may appear in this table: Following Degree of Saturation # x = 1.00 for Short Lane with resulting Excess Flow * x = 1.00 due to minimum capacity Following LOS # - Based on density for continuous movements about:blank 29/11/2007
Section 57
Phasing Summary SIDRA ~"m INTERSECTION Phasing Summary Elm St / Diamond St Intersection (Signalised Option) 2019 AM Base C = 90 seconds Cycle Time Option: Optimum cycle time (Minimum Delay) Phase times determined by the program. Page 1 of 1 Phase H Phase G [Phase I | me i _ Green Time = 46 seconds Green Time = 14 seconds Green Time = 12 seconds Phase Time = 52 seconds Phase Time = 20 seconds Phase Time = 18 seconds Phase Split = 58 % Phase Split = 22 % Phase Split = 20 % Norma! Movement Permitted/Opposed Slip-Lane Opposed Slip-Lane Stopped Movement Continuous Tum On Red 4- SIDRA SOLUTIONS Site: Signalised 2019 AM Elm at Diamond T:\3400-3499\3427 - Cooroy Retirement Community\SIDRA\Elm and Diamond Nov 28.aap Processed Nov 29, 2007 01:27:11PM A1059, McCormick Rankin Cagney, Large Office Produced by SIDRA Intersection 3.2.1.1478 Copyright 2000-2007 Akcelik and Associates Pty Ltd www. sidrasolutions.com about:blank 29/11/2007
Section 58
Movement Summary SIDRA INTERSECTION Movement Summary Page 1 of 2 Elm St / Diamond St Intersection (Signalised Option) 2019 PM Base Signalised - Fixed time Vehicle Movements Cycle Time = 70 seconds 95% Dem Deg of Aver Aver MovID Turn Flow HV Satn Delay vei or ronal queued ee ate P Speed (veh/h) (v/¢) (sec) (m) (km/h) Elm $ 2 T 458 10.7 0.382 $9 LOS A 67 0.49 0.43 $1.6 3 R 399 10.0 0.720 31.6 LOS C 96 0.94 1.00 32.2 Approach 857 10.4 0.721 17.9 Los B 96 0.70 0.69 40.3 Diamond E 4 L 483 5.6 0.463 12.6 LOS B 63 0.56 0.76 44.7 6 R 183 8.5 0.510 38.4 LOS D 49 0.95 0.80 29.2 Approach 636 6.3 0.510 18.8 LOS B 63 0.66 0.77 39.7 Elm N 7 L 261 5.4 0.345 15.4 LOS B 41 0.50 0.76 42.3 8 T 459 6.3 0.715 23.0 Los C 115 0.93 0.84 36.8 Approach 720 6.0 0.715 20.3 tosc 115 0.77 0.81 38.6 All Vehicles 2213 7.8 0.720 18.9 LOSB 115 0.71 0.75 39.6 Pedestrian Movements Aver 95% Mov ID Dem Flow Del: Levelof Back of Prop. Eff. Stop (ped/h) (sec) Service Queue Queued Rate (m) P1 $3 29.3 Los c 0 0.91 0.91 P3 53 17.1 LOS B o 0.70 0.70 All Peds 106 23.2 tosc 0 0.81 0.81 Symbols which may appear in this table: Following Degree of Saturation # xX = 1.00 for Short Lane with resulting Excess Flow * x = 1.00 due to minimum capacity Following LOS # - Based on density for continuous movements about:blank 29/11/2007
Section 59
Phasing Summary SIDRA INTERSECTION Phasing Summary Elm St / Diamond St Intersection (Signalised Option) 2019 PM Base C = 70 seconds Cycle Time Option: Optimum cycle time (Minimum Delay) Phase times determined by the program. Page | of 1 Phase H Phase G Phase I — — : _ Demat _ Green Time = 24 seconds Green Time = 16 seconds Green Time = 12 seconds Phase Time = 30 seconds Phase Time = 22 seconds Phase Time = 18 seconds Phase Split = 43 % Phase Split = 31 % Phase Split = 26 % Normal Movement Stip-Lane Stopped Movement Turn On Red + SIDRA SOLUTIONS Permitted/Opposed Opposed Slip-Lane Continuous Site: Signalised 2019 PM Elm at Diamond T:\3400-3499\3427 - Cooroy Retirement Community\SIORA\EIm and Diamond Nov 28.aap Processed Nov 29, 2007 01:28:23PM A1059, McCormick Rankin Cagney, Large Office Produced by SIDRA Intersection 3.2.1.1478 Copyright 2000-2007 Akcelik and Associates Pty Ltd www, sidrasolutions.com about:blank 29/11/2007
Section 60
_ Movement Summary : —_ Page lof i SIDRA —™ INTERSECTION Movement Summary Eim St / Pearsons Rd Intersection 2019 AM Base Give-way Vehicle Movements 95% Dem Deg of Aver Aver MovID Turn Flow %HV = Satn Delay yevel a Queue quote 4 Err. Step Speed (veh/h) (w/e) (sec) (m) (km/h) Elms 2 T 279 10.8 0.199 4.3 LOS A 18 0.67 0.00 51.8 3 R 38 0.0 0.199 12.8 LOS B 18 0.67 0.89 44,3 Approach 317 9.5 0.199 5.3 LOS A 18 0.67 0.11 50.8 Pearsons 4 L 70 14 0.136 13.8 LOS B 4 0.65 0.88 43.5 6 R 3 0.0 0.136 14.0 LOS B 4 0.65 0.90 43.2 Approach 73 1.4 0.136 13.8 10S B 4 0.65 0.89 43.5 Elim N 7 L 3 0.0 0.375 8.2 LOS A 0 0.00 0.67 49.0 8 T 734 49 0.390 0.0 LOS A 0 0.00 0.00 60.0 Approach 737 49 0.390 0.0 LOSA 0.00 0.00 59.9 Not , All Vehicles 1127 5.9 0.390 2.4 applicable 18 0.23 0.09 55.8 Symbols which may appear in this table: Following Degree of Saturation # x = 1.00 for Short Lane with resulting Excess Flow *x = 1.00 due to minimum capacity Following LOS # - Based on density for continuous movements Following Queue # - Density for continuous movement + SIDRA SOLUTIONS Site: 2019 AM Elm at Pearsons T:\3400-3499\3427 - Cooroy Retirement Community\SIDRA\Pearsons and Elm Nov 28.aap Processed Nov 28, 2007 04:51:03PM A1059, McCormick Rankin Cagney, Large Office Produced by SIDRA Intersection 3.2.1.1478 Copyright 2000-2007 Akcelik and Associates Pty Ltd www.sidrasofutions.com about:blank 28/11/2007
Section 61
Movement Summary Page 1 of 1 SIDRA -“™ INTERSECTION Movement Summary Elm St / Pearsons Intersection 2019 PM Base Give-way Vehicle Movements 95% Dem Deg of Aver Aver Levelof Backof Prop. Eff. Stop MovID = Turn Flow %HV Satn Delay Service Queue Queued Rate Speed (veh/h) (v/e) (sec) (m) (km/h) Elm S 2 T 515 2.9 0.307 3.3 LOS A 29 0.68 0.00 51.7 3 R 40 0.0 0.308 11.8 LOS B 29 0.68 0.86 45.2 Approach 555 2.7 0.307 3.9 LOS A 29 0.68 0.06 51.2 Pearsons 4 l 26 3.8 0.060 13.7 LOS B 2 0.59 0.78 43.8 6 R 6 0.0 0.060 13.7 LOS B 2 0.59 0.88 43.5 Approach 32 3.1 0.060 13.7 LOSB 2 0.59 0.80 43.7 Elm N 7 L 3 0.0 0,300 8.2 LOSA 0 0.00 0.67 49.0 8 : T 533 8.3 0.290 " 0.0 LOS A 0 0.00 0.00 60.0 Approach 536 8.2 0.290 0.0 LOS A 0.00 0.00 59.9 Not All Vehicles 1123 5.3 0.308 2.3 Applicable 29 0.35 0.06 54.7 Symbols which may appear in this table: Following Degree of Saturation # x = 1.00 for Short Lane with resulting Excess Flow * x = 1.00 due to minimum capacity Following LOS # - Based on density for continuous movements Following Queue # - Density for continuous movement + SIDRA SOLUTIONS Site: 2019 PM Elm at Pearsons T:\3400-3499\3427 - Cooroy Retirement Community\SIDRA\Pearsons and Elm Nov 28.aap Processed Nov 28, 2007 04:51:04PM A1059, McCormick Rankin Cagney, Large Office Produced by SIDRA Intersection 3.2.1.1478 Copyright 2000-2007 Akcelik and Associates Pty Ltd www, sidrasolutions.com about:blank 28/11/2007
Section 62
Movement Summary Page 1 of 1 SIDRA ~ INTERSECTION Movement Summary Elm St / Diamond St Intersection 2009 AM Design Give-way Vehicle Movements : 95% Dem Deg of Aver - Aver MovID Tum Flow %HV Satn_ Delay bevel of ‘Queue Queced Err. Stop Speed (veh/h) (v/c) (sec) (m) (km/h) eims 2 T 332 10.5 0.182 0.0 LOS A 0 0.00 0.00 60.0 3 R 230 10.0 0.318 14.0 LOS B 1s 0.68 0.94 43.6 Approach 562 10.3 0.317 5.7 LOS A 15 6.28 0.39 52.0 Diamond E 4 L 384 5.5 0.554 14.9 LOS B 35 0.71 1.04 42.8 6 R 79 8.9 0.432 38.4 LOSE 16 0.90 1.07 30.0 Approach 463 6.0 0.554 18.9 Losc 35 0.74 1.05 40.0 Elm N 7 L 273 5.1 0.152 8.4 LOS A 0 0.00 0.67 49.0 8 T 327 6.1 0.281 0.1 LOS A 0 0.00 0.01 60.0 Approach 800 5.8 0.282 2.9 LOS A 0.00 0.24 55.7 Not All Vehicles 1825 7.2 0.554 7.9 Applicable 35 0.27 0.49 49.6 Symbols which may appear in this table: Following Degree of Saturation # x = 1.00 for Short Lane with resulting Excess Flow *x = 1.00 due to minimum capacity Following LOS # - Based on density for continuous movements Following Queue # - Density for continuous movement 4 SIDRA SOLUTIONS Site: Design 2009 AM Elm at Diamond T:\3400-3499\3427 - Cooroy Retirement Community\SIDRA\EIm and Diamond Nov 28.aap Processed Nov 29, 2007 61:15:15PM A1059, McCormick Rankin Cagney, Large Office Produced by SIDRA Intersection 3.2.1.1478 Copyright 2000-2007 Akcelik and Associates Pty Ltd www.sidrasolutions.com about:blank 29/11/2007
Section 63
Movement Summary Page 1 of 1 SIDRA oe INTERSECTION Movement Summary Elm St / Diamond St Intersection 2009 PM Design Give-way Vehicle Movements 95% Dem Deg of Aver Aver MovID Tum Flow %HV Sain Delay Level Of Seeue ques 4 ER AtOP speed (veh/h) (v/c} (sec) (m) (km/h) Elm S 2 T 369 10.6 0.202 0.0 LOS A 0 0.00 0.00 60.0 3 R 297 10.1 0.307 11.8 LOS B a5 0.60 0.85 45.6 Approach 666 10.4 0.307 5.3 LOS A 15 0.27 0.38 52.6 Diamond E 4 L 360 5.6 0.406 11.3 LOS B 22 0.59 0.86 46.1 6 R 123 89 0.569 | 38.4 LOS E 25 0.91 1.14 30.0 Approach 483 6.4 0.570 18.2 Losc 25 0.67 0.93 40.6 Elm N 7 L 203 5.4 0.114 8.4 LOSA 0 0.00 0.67 49.0 8 T 358 6.4 0.191 0.2 LOS A 0 0.00 0.02 60.0 Approach 561 6.1 0.191 3.1 LOSA 0.00 0.25 55.5 Not All Vehicles 1710 7.8 0.569 8.2 Applicable 25 0.29 0.49 49.3 Symbols which may appear in this table: Following Degree of Saturation # x = 1.00 for Short Lane with resulting Excess Flow * x = 1.00 due to minimum capacity Following LOS # - Based on density for continuous movements Following Queue # - Density for continuous movement + SIDRA SOLUTIONS Site: Design 2009 PM Elm at Diamond T:\3400-3499\3427 - Cooroy Retirement Community\SIDRA\Elm and Diamond Nov 28.aap Processed Nov 29, 2007 01:16:19PM A1059, McCormick Rankin Cagney, Large Office Produced by SIDRA Intersection 3.2.1.1478 Copyright 2000-2007 Akcelik and Assoclates Pty Ltd sid Jutions: about:blank 29/11/2007
Section 64
Movement Summary Page 1 of 1 SID ~~ INTERSECTION Movement Summary Elm St / Pearsons Rd Intersection Design 2009 AM Give-way Vehicle Movements 95% Dem Deg of Aver Aver MovID Tum Flow %HV Satn Delay Level of Queue queued Fer StOP Speed (veh/h) (v/c) (sec) (m) (km/h) Elms 2 T 208 10.6 0.114 0.0 LOS A 0 0.00 0.00 60.0 3 R 55 10.9 0.059 11.5 LOS B 2 0.54 0.75 46.0 Approach 263 10.6 0.114 2.4 LOSA 2 0.41 0.16 56.4 Pearsons 4 L 74 1.4 0.104 11.5 LOS B 4 0.54 0.80 45.6 6 R 3 0.0 0.103 11.7 Los B 4 0.54 0.86 45.3 Approach 7 1.3 0.104 11.5 LOS B 4 0.54 0.80 45.6 ttm N 7 L 4 0.0 0.286 8.2 LOS A 0 0.00 0.67 49.0 8 T 546 4.9 0.291 0.0 LOS A 0 0.00 0.00 60.0 Approach 550 4.9 0.291 0.1 LOSA 0.00 0.00 59.9 All Vehictes 890 6.3 0.291 1.7 Not 4 0.08 0.12 57.3 * * “" Applicable . . . Symbols which may appear in this table: Following Degree of Saturation #x = 1.00 for Short Lane with resulting Excess Flow * x = 1.00 due to minimum capacity Following LOS # - Based on density for continuous movements Following Queue # - Density for continuous movement + SIDRA SOLUTIONS Site: Design 2009 AM Elm at Pearsons T:\3400-3499\3427 - Cooroy Retirement Community\SIDRA\Pearsons and Elm Nov 28.aap Processed Nov 29, 2007 03:53:00PM A1059, McCormick Rankin Cagney, Large Office Produced by SIDRA Intersection 3.2.1.1478 Copyright 2000-2007 Akcelik and Associates Pty Ltd www.sidrasolutions.com about:blank 29/11/2007
Section 65
Movement Summary Page 1 of 1 SIORA - INTERSECTION Movement Summary Elm St / Pearsons Rd Intersection Design 2009 PM Give-way Vehicle Movements 95% Dem Deg of Aver Aver MovID Tum Flow %HV Satn «Delay LEVEE OF ‘Queue gue op TT StOP speed (veh/h) (v/c) (sec) (m) (km/h) Elms 2 T 383 2.9 0.200 0.0 LOS A oO 0.00 0.00 60.0 3 R 67 0.0 0.064 10.0 LOS A 2 0.46 0.70 46.9 Approach 450 2.4 0.200 1.5 LOSA 2 0.07 0.10 57.6 Pearsons 4 L 43 4.7 0.069 11.4 LOS B 2 0.50 0.72 45.8 6 R 9 6.0 0.069 11.5 Los B 2 0.50 0.85 45.5 Approach 52 3.8 0.069 11.4 LOsSB 2 * 0.50 0.74 45.8 Elm N 7 L 5 0.0 0.217 8.2 LOS A 0 0.00 0.67 49.0 8 T 397 8.3 0.217 0.0 LOS A 0 0.00 0.00 60.0 Approach 402 8.2 0.217 0.1 LOSA 0.00 0.01 59.38 : Not All Vehicles 904 5.1 0.217 1.4 Applicable 2 0.06 0.10 57.7 Symbols which may appear in this table: Following Degree of Saturation # x = 1.00 for Short Lane with resulting Excess Flow * x = 1.00 due to minimum capacity Following LOS # - Based on density for continuous movements Following Queue # - Density for continuous movement + SIORA SOLUTIONS Site: Design 2009 PM Elm at Pearsons T:\3400-3499\3427 - Cooroy Retirement Community\SIDRA\Pearsons and Elm Nov 28.aap Processed Nov 29, 2007 03:53:18PM A1059, McCormick Rankin Cagney, Large Office Produced by SIDRA Intersection 3.2.1.1478 Copyright 2000-2007 Akcelik and Associates Pty Ltd www. sidrasolutions.com about:blank / 29/11/2007
Section 66
Movement Summary Page 1 of 2 SIDR INTERSECTION Movement Summary Elm St / Diamond St Intersection (Signalised Option) 2019 AM Design Signalised - Fixed time Vehicle Movements Cycle Time = 90 seconds 95% Dem Deg of Aver Aver MovID Turn Flow %HV = Satn. Delay evel of kof Quowed ER SEP Speed (veh/h) (v/c) (sec) (m) (km/h) Elm S 2 T 444 10.6 0.332 4.5 LOS A 64 0.38 0.34 $3.4 3 R 309 10.0 0.746 42.7 LOS D 106 0.99 1.04 27.6 Approach 753 10.4 0.746 20.2 tos c 106 0.63 0.62 38.7 Diamond E 4 L 516 5.4 0.626 18.3 LOS B 108 0.73 0.81 40.1 6 R 106 8.5 0.454 49.1 Los BD 45 0.97 0.78 25.5 Approach 622 5.9 0.627 23.5 Los c 108 0.77 0.81 36.6 Elm N 7 L 367 5.2 0.462 13.4 LOS B 54 0.39 0.75 44.0 8 T 708 5.9 0.738 18.6 LOS B 181 0.85 0.77 39.7 Approach 1075 5.7 0.738 16.8 LOS B 181 0.69 0.76 411 All Vehicles 2450 7.2 0.746 19.6 LOSB 181 0.69 0.73 39.1 Pedestrian Movements Aver 95% Mov ID Dem Flow Dela level of Back of Prop. Eff. Stop (ped/h) (sec) Service Queue Queued Rate (m) PL 53 39.2 Los D 0 0.93 0.93 3 53 12.3 LOS B 0 0.52 0.52 All Peds 106 25.7 tos c o 0.73 0.73 Symbois which may appear in this table: Following Degree of Saturation # x = 1.00 for Short Lane with resulting Excess Flow * x = 1.00 due to minimum capacity Following LOS # - Based on density for continuous movements about:blank 29/11/2007
Section 67
Phasing Summary SIDRA —~ INTERSECTION Phasing Summary Elm St / Diamond St Intersection (Signalised Option) 2019 PM Design C = 80 seconds Cycle Time Option: Optimum cycle time (Minimum Delay) Phase times determined by the program. Page 1 of 1 Phase H Phase G Phase I = towed bent —_ / Green Time = 30 seconds Green Time = 20 seconds Green Time = 12 seconds Phase Time = 36 seconds Phase Time = 26 seconds Phase Time = 18 seconds Phase Split = 45 % Phase Split = 33 % Phase Split = 23 % Normal Movement Slip-Lane Stopped Movement Turn On Red 4+ Permitted/Opposed Opposed Slip-Lane Continuous SIDRA SOLUTIONS Site: Design Signalised 2019 PM Elm at Diamond T:\3400-3499\3427 - Cooroy Retirement Community\SIDRA\Elm and Diamond Nov 28.aap Processed Nov 29, 2007 01:29:49PM A1059, McCormick Rankin Cagney, Large Office Produced by SIORA Intersection 3.2.1.1478 Copyright 2000-2007 Akcelik and Associates Pty Ltd www sidrasolutions.com about:blank 29/11/2007
Section 68
Movement Summary Page 1 of 2 SIDRA ~= INTERSECTION Movement Summary Elm St / Diamond St Intersection (Signalised Option) 2019 PM Design Signalised - Fixed time Cycle Time = 80 seconds Vehicle Movements 95% Dem Deg of Aver Aver MovID Turn Flow %HV Satn Delay evel or Queue Queed erator _ Speed (veh/h) (w/c) (sec) (m) (km/h) Elms 2 T 495 10.5 0.387 5.3 LOS A 73 0.44 0.39 52.4 3 R 399 10.0 0.670 30.9 Los C 100 0.91 0.96 32.6 Approach - 894 10.3 0.670 16.7 Los B 100 0.65 0.65 41.2 Diamond E 4 L 483 5.6 0.463 13.2 LOS B 70 0.55 0.76 44,1 6 R 165 8.5 0.628 48.1 LOS 0 61 0.99 0.83 26.8 Approach 648 6.3 0.628 21.4 Losc 70 0.66 0.78 38.0 Elm N . 7 L 272 5.1 0.388 16.4 LOS B 48 0.50 0.76 41.4 8 T 478 6.3 0.680 22.9 LOS ¢ 125 0.90 0.79 36.9 Approach 750 5.9 0.680 20.6 tosc 125 0.75 0.78 33.4 All Vehicles 2292 7.7 0.680 19.3 LOS B 125 0.69 0.73 39.3 Pedestrian Movements 95% Mov 1p Dem Flow belay Levelof Backof Prop. Eff. Stop (ped/h) (see) Service Queue Queued Rate (m) Pl 53 34.2 LOS D 0 0.93 0.93 P3 $3 17.6 LOS B 0 0.66 0.66 All Peds 106 25.9 Los c a 0.79 0.79 Symbols which may appear in this table: Following Degree of Saturation # Xx = 1.00 for Short Lane with resulting Excess Flow * x = 1.00 due to minimum capacity Following LOS # - Based on density for continuous movements about:blank 29/11/2007
Section 69
Phasing Summary Page | of | SIDRA =e INTERSECTION Phasing Summary Elm St / Diamond St Intersection (Signalised Option) 2019 AM Design C = 90 seconds Cycle Time Option: Optimum cycle time (Minimum Delay) Phase times determined by the program. Phase H Phase G Phase I Moy fl | | _ le Th | wy hy Green Time = 46 seconds Green Time = 14 séconds Green Time = 12 seconds Phase Time = 52 seconds Phase Time = 20 seconds Phase Time = 18 seconds Phase Split = $8 % Phase Split = 22 % Phase Split = 20 % Normal Movement Permitted/Opposed Slip-Lane Opposed Slip-Lane Stopped Movement Continuous Turn On Red 4- SIDRA SOLUTIONS Site: Design Signalised 2019 AM Elm at Diamond T:\3400-3499\3427 - Cooroy Retirement Community\SIORA\Elm and Diamond Nov 28.aap Processed Nov 29, 2007 01:30:44PM A1059, McCormick Rankin Cagney, Large Office Produced by SIDRA Intersection 3.2.1.1478 Copyright 2000-2007 Akcelik and Associates Pty Ltd " . about:blank 29/11/2007
Section 70
Movement Summary Page 1 of 1 SIDRA -™ INTERSECTION Movement Summary Elm St / Pearsons Rd Intersection Design 2019 AM Give-way Vehicle Movements 95% Dem Deg of Aver Aver MovID Tum Flow %HV = Satn Delay (LN Of Oueue Quened FT Stop speed (veh/h) (v/c) (sec) (m) (km/h) Elms 2 T 279 10.8 0.153 0.0 LOS A 0 0.00 0.00 60.0 3 R 71 0.0 0.088 12.0 LOS B 3 0.61 0.83 45.0 Approach 350 8.6 0.153 2.4 LOSA 3 0.12 0.17 56.2 Pearsons 4 L 101 2.0 0.193 13.9 Los 8 6 0.67 0.89 43.4 6 Rg 4 0.0 0.190 14.1 Los 8 6 0.67 0.90 43.1 Approach 105 1.9 0.193 13.9 Loss | 6 0.67 0.89 43.4 Elm N 7 L 5 0.0 0.385 8.2 LOS A 0 0.00 0.67 49.0 8 T 734 4.9 0.391 0.0 LOS A 0 0.00 0.00 60.0 Approach 739 49 0.391 0.1 LOSA 0.00 0.00 59.9 Not All Vehicles 1194 5.7 0.391 2.0 Applicable 6 0.09 0.13 56.9 Symbols which may appear in this table: Following Degree of Saturation | # x = 1.00 for Short Lane with resulting Excess Flow * x = 1.00 due to minimum capacity Following LOS # - Based on density for continuous movements Following Queue # - Density for continuous movernent + SIDRA SOLUTIONS Site: Design 2019 AM Elm at Pearsons T:\3400-3499\3427 - Cooroy Retirement Community\SIDRA\Pearsons and Elm Nov 28.aap Pracessed Nov 29, 2007 03:59:53PM A1059, McCormick Rankin Cagney, Large Office Produced by SIDRA Intersection 3.2.1.1478 Copyright 2000-2007 Akcelik and Associates Pty Ltd www, sidrasolutions.com about:blank 29/11/2007
Section 71
Movement Summary Page | of 1
SIDRA = -
INTERSECTION
Movement Summary
Elm St / Pearsons Rd Intersection
Design 2019 PM
Give-way
Vehicle Movements
95%
Dem Deg of Aver Aver
MovID- Turn Flow %HV Satn Delay covet of Queue Quoted Err. Stop Speed
(veh/h) (w/e) (sec) (m) {km/h)
Elm S
2 T 515 2.9 0.269 0.0 LOS A 0 0.00 0.00 60.0
3 R 90 0.0 0.087 10.7 LOS B 3 0.53 0.76 46.2
Approach 605 2.5 0.269 1.6 LOSA 3 0.08 0.11 57.5
Pearsons
4 L 56 5.4 0.122 13.6 LOS B 4 - 0.60 0.82 43.9
6 R 12 0.0 0.122 13.6 LOS B 4 0.60 0.88 43.5
Approach 68 44 0.122 13.6 Loss 4 0.60 0.83 43.8
Elim N
7 L 6 0.0 0.286 8.2 LOS A 0 0.00 0.67 49.0
8 T $33 8.3 0.291 0.0 LOSA 0 0.00 0.00 60.0
Approach 539 3.2 0.291 0.2 LOS A 0.00 0.01 $9.9
Not
All Vehicles 1212 5.1 0.291 1.6 Applicable 4 0.07 0.11 57.5
Symbols which may appear in this table:
Following Degree of Saturation
# x = 1.00 for Short Lane with resulting Excess Flow
* x = 1.00 due to minimum capacity
Following LOS
# - Based on density for continuous movements
Following Queue
# - Density for continuous movement
+
SIDRA SOLUTIONS
Site: Design 2019 PM Elm at Pearsons
T:\3400-3499\3427 - Cooroy Retirement Community\SIDRA\Pearsons and Elm Nov 28.aap
Processed Nov 29, 2007 03:53:46PM
A1059, McCormick Rankin Cagney, Large Office
Produced by SIDRA Intersection 3.2.1.1478
Copyright 2000-2007 Akcelik and Associates Pty Ltd
www. sidrasolutions.com
about:blank , ‘ 29/11/2007
Section 72
Appendix D Traffic Survey Data 3427-001(1}-Final.doc: 04/12/07
Section 73
CE Tae on Seok lL Cc 2a us saosin tne 45 Minute Totals pera East - Diamond North - Elm Street eterenctin lovernert z US Yor! 4 . DE Forel) Lx s 7 F Fe Tout naeowies | - Poiyl é tl Cc lyl l L zr iv WO HY. £r yy Xu HV. HY. WWE Lyne z Ly BLY Hy z 19 4 2 6 ar o o o Of 46 6 4 o a 8 o o o 46 a7 | 1 a 202 2 3 c 6 50 o a 8 5] 58 4 6 o a a o o o 6 7) + sO 264 6 ea 30 3 83 o o o eo | & 3 a 8 a a o o o as oo | 56 2 i 25 ao 3 ule 3 Ble 2 clue 3 : 0 c|whe co ole s wie su ss ow lat wl eo a liele 3 é 2 ofmfo to rle ¢ mila tse So zonosje 6 ele o slulas : 0 oofmfe 3 afi ele sf a et ales sfo cs ofmln & : 2 ofelco o clu 6 mle 3 8 oe st gle 2 alec elisls ¢ : oo t[elo o clw 2 sla so on se BF 3 47[ 0 0 0 frp] ae 1 o ofwz]o 9 «| eps 2 38 305 fi gle 2 glee slmls 2 , ooslals so tle ¢ wis y 3 foe eo a Coe a eee Table 1 Hourly Totats - Easi - Olamond Street North - Elm Streat_ Wrareetition Movement. = i Cs Totsi} 4 UE Total UE t Z Tem ti rods s tL | © ly L yr Ca HY. ky wy "5 Hg HVE iv on og Ly. x Lv ony i 4 12} o O Paespae 15) 269 “uw Mj 0 ° oO | Met o 0 o | en zai] 17e 11 (189 143 2s 0 olsofae i sel wo ale o elsrlo «(az we alm women] ian a o O | 47] 3690 18 882 & m oO a a faatoo 4 a [an 437 | 2220 14 26 1583, Fs 2 ofenlan a ania s milo o ofes|o ¢ sco a carlan ts om | to sae ar o O 7 S10] 42 80 Hz e 70 o oO a jaztioo 4 4 | 43 47a| 237) 139° 250 1675, 2 > ofes|ae x sain 7 alo 0 ofsu|o 3 sae so clas tv om| co] te 3 ooclis|es iy mis sels o slits > tie 2 ola © sissl ioe . ‘Table 2 Cent. Deed Seow
Section 74
Toh on ore UN so? on ee UBD Reterence: Map XX Fla, x1 Survey Date: Wednesday 20 ne 2007 puwatien of aves hours tos Survey Period: 15:30 + | 18:00 j Weather: Fire Survey by: Australasia Trathe Suaveys j a wars . 3 i 15 Minute Totals _ roach. South -Eim Sreet East - Diamond Stool - = Wonh- Elm Street Lee z r z T a CO z T z 5 GE Fora Tox ——3 z Trott] toes f a type Pols }t [ce ls | ae WR nv We Woy ky a Woe | wk tl o tht 6 79) 0 Oo o|ter| m2 9 7%) 2 +t. 2) 0 6 oO [io] o 0 0 | a9 4 es) 80 «se fir] ate a fee 1 a7) 0 0 6 J ister 4 as] a 2 a) 0 lo Uo fi] oo ho jo 8 so] 8 8 tc] oer o pes 0 es} o 0 Uf | mm 5 ofa + to (8 6 fw} oO 6o ho} me 8 la 4 ad tse] a7 1 meer 2 to 0 oftales 5 afar a a] o 0 ofr} o o of m 5 wl se 2 sefire| os a) 7 9 mio 0 ofiss}en 9 ela 0 a] 0 6 of wf o 1 + im + el 6 sede] ase 2 sige 1 so] o oo ofiste 9 ale 2 alo ao of ]o 3 3) 68 1 ew] 3s 9 a8 ]tor] 351 s omter 0 sry) o 0 of mst 3 mle 8 es] 0 8 fil oo ho Uo | elt ws] oo 1 so] to] 388 sas - wae] 8391s 8 | oC fs} m4 om} aro or) a oo ota] 1 ot fee 2 lo 4 fo] oe y730- 7s] ao Oe Pez ol ez flo lo CG fife 1 se] as 2 asf oll ld we] ole lhl] os lo ll ltl] 2 azay - 800] st sts a too of ots se a tl ep ot | oo ot ol te ee | aa Tomwcteres [70S 16 Types 18 bez t 00 0 [uaifess or _vivizey 9 27a1 0 00 fee] 1 «5 ] @s8_2g ear Les a1 a76 J i0ea] sara Tabte 7 Hourly Totals . “Approsch ‘South Erm Street East Sect North - Et Steet Vesrseotn = : a Us Tort] z= : CF Tatel ar i a Jor fir] FP isp ft | © sf od YT tts) ys WR Ww wR a Se WwW ew ov gi + sta 8 pT oof Perf ars 17 apis 4 17; oo 0 am] O00 | oot ts sto) ter 18 sea | soz | asp y so;2m 8 zefo 0 of sepa 17 seit 3 to) 0 0 ofemlo 1 + Ja is sol iss 12 ser fare! tas0 o smj2 6 2a[ 0 0 0 [sea] z 16 soe} ior 9 tw! o 0 oo fal o 4 4/308 10 ssl tse ¢ tse fam] tar # saya 6 mijo 0 6 fete 1 cs} 3 9] 0 0 fas] o 6 4 |e 8 es} ie 3 ates] asp PES Sissies sme ils ¢ shales s]e rz): sts] ie 4 seize « 20j 0 0 0 farefass 1 moje 5 1m] 0 0 oo fam] 1 9 4 jo 4 mali 3 tar sea] 1989 s_msiz 4 mio io ofsztes 8 miw 3 ioe ofsmts oo sire 3 aslus 5 ols] zo Tabioz
Section 75
BSERRRE Perec Tout 6 126 10 156 200 195 221 176 4 134 1602 Tal ‘Tau 6 ue 308 104 135 135 188 308 88 ye 1030 Fetal WI RS8S583 ty -]_ tlle -oosccced-| ri f]z]--cccce 61 c p = i Hy jaa 838388 a2]8 ! nee S3 88 fe|—e[2[- oon 20s ols -be}—e [za SRR RAS E]| bisegeaseegels Hl lp 399838 Woon ecascolo loa sceca Ww 0 ° . 0 ° o o ° ° 2 0. wv. ° 0 a a 0 0 o Fa 7 a “ st “ 3 p]o-e eo eo DoD eO/o | or z]-}| — ¢ ealo| ww nnn , Corey UBD Reterence: Map XX Rist. X1 . Wacnesday 20 dune 2007 Duration of curve:2.5 hours 7 Roger Grameid Gonsutling Pry Ud ction Raterance: 6652 Intersection No.: 2 litersoction: Em Stre0/Peareans Road, [otont: ‘Survey Dave: Survey Period: Weathes: East Poarsons Rood z ° ° ' ° 1 ° 0 1 TV. o 0 ' a ' Q 9 ‘ a a . East wv. 1 2 2 1 2 1 4 wv 4 7 a 6 19 8 6 "1 4 8 3. Poly c Pofjy F “South - Elm Sireot "South - btn Suroot z]4 --nondenaly tao SR ARR nf —lzlen + eevee on Ww 124 "Wevernent Theme Porto Taal Petes | $6246 4301 roach lower get Tine Period 60 700 Ts - 15 Minute Totals roach Hourly Totals
Section 76
i Tas zz 199 18 200 18t 16 167 176 158, a7 187 Table 1 Toa 7a? 738 097 82 se 682 58s iE] I [Esaasces sale a L te We noon nonn ole ty P)_t]tlo sooo cc ecole a Z]--oa-won-o Fatal 378 38 320 2 268 266 2 WE 2 2 2 3 $ 5 2 3 Ww 2 2 a a 5 5 2 Table z 105 0 oe 93 er BRSSE North - Ei Street 1 0 North - Em Street. z m4 a mB a7 231 283 28 23 je}—+]z/> fan -owanals p+ [za 2 te oe! Blgea SSRs scale BIR SRR RSA Ww a o a 9 a ° a a 9 a ¢ we loaccece te Cc wy ° ° ° ° ° e ° ° ° ° é — Cc wv ° ° ° ° ° ° 2 Zw Elm StresvPearsons Road, Cooroy 1UBO Reterence: Map XX Ret, x0 [Survey Date: ‘Wectreraciny 20 ure 2007 wv 0 a a 0 a a 0 East - Pearsons Rosd z 1 1 1 1 o 9 1 ° 1 o 3 East - Pearsons Road p|-- - -coronole Bi] e a oe oe — we Weoononeve-|9 Weer reer «| ES BI- -cocso alee cmon con 9 aisenreas retal BERRE BE Heensane Al |BSe8sae se a3 Fe Ce ook By co ° ° @ a a ° @ ° zlo oo oc 00 lo - nano ZW BRATS LES eecela leoeeeoa We ‘South - Elm Stroat extn EI Hy, a o a 9 a 9 ‘South - Elm Street. i p)eeenesceenal PIRRE SARS 3 ‘ [ferret | \argeanag . Ikn]a—|Plinmn none -- + nfs i e— [Elz 6 on Sol tals a ple ae e BBRS AER 2 ReeReee z ageeaee ' 4 alge, P PESeeee Bla] BREE EEEF Hil AM) 4 lsacesacedtl aad leaesaas ue sel 2 lessessseegl] HEH) # pnazegs Duration of eure 2.5 hour
Section 77
‘Trading Post Réad/Pearsons Road, Conroy Roger Bramekd Consulting Pty Lid UBD Reterence: Map XX Ref, X1 [Cfent: Clent Reference: 6452 330 Wednesday 20 Jurie 2007 JOuration of surves2.5 hours 7:00 Fine Survey Date: Survey Period: ‘Weather, Survey by: - Table 2 Austrelasian Traffic Surveys: KL 15 Minute Totals Sunveyor(s): intersection Mo.: 4 2 3 renee anunrale wl g g B) Wlese-eseeraee i 8898385 mer nnn sane 2en22% el A nN af RW za8 ule occocacecole ulo coo ece BI [* Jel °° eoascole BI [* Elo ee ee z Bloocaccec bole 3 Bloscesce [+ = A 2 © 2 alae -anwo enn ely z nle o> SeR RR 3 3 : éle t Blowacoowe bel a t zea canaal g Bin ae cain oon eff z aire Sra eg Hi- CO eocoocol- BR]/- Ocoocs| 2] *] Ble coc 00d acolo! e| “| Blow odace B]- eoccccocol-| | a oocorcccsele ovrerco E| Wl iB] aio oo eroocolo Ho oogt OOF LA] tele oo ew ce cele | flzle ccc coe 3 plo ccaoccaccda BL} feloececce zl : + 5 3 e nlooeoc-coocee- a plow -- og | 2 E = si s 5 ecoecgescolo lo evcscce E +z Q 2 E VE le Blooaor coo oole € Bloor ---00 Zz 2 - wlo ce ccecocele nleocooee | tle coe see cdlo | ize oe ooo Blo sccc ccc cols Blo ececce B] WI fon no dece scale | WI iJeaaneae nlooccccco cals who oc coco Hy + | [z|- 2 occoeale Hy 4 | [Ble eee occ 5 Ble dooce coca z Bleocoocd co ic ‘3 © # nlo co eco ec cole : uloococcce z £ 3 & Slo Blow ccccadcele Ele Blo ooecae zi Blooe a & plo ooace 3 Blo o feo is a] eos alan no Xeoo wala aSRESBSS jo] | Blo coo coe eae lo] | Ie]- - coe aa B]o ono toon ants BERS BERK y leggse eal 3 BeReege ai } EREEESEESE] A } BESEESE e een eee ene 2 vere nee ell ¢ 3} BIE q egese elt sl28| & |ge 2 d lecevezsgeq} 3 SEEREEE al
Section 78
Table 2
cates sees
_. B| Al |e eeecovozalale 3] Wl isassees
B] PA [ew wawvoon ely BS) BI jsaees
J i | |
2 BI [# z]o2 occ e cc cele| B| |} Je}o ee
E oO
i ze 3 Blosccacan alo 3 Bloeoo
fe [4 f4
; A ‘3
{ § wleonaawnaon vig 3 WoAS SHS
|
és t Blo a ee ocao eae ak t Bloc ooaco
gi > i >In
2 Bl< en oee own a/R 2 alta SSneR
e x= g Hlos ose occ colo joa oo
paoy sucuiey - 15065 2] “| Blo ecco ecacole e| *] Blooae
Blo os 20000 00]/e Blo oem oce
ooocoocee ‘ol ooeooces
a) A a] A
nlo ce ccc = of- wlo sc ooee
| tele co eecc ecole P| f/zlo cco sce
2
BR] |sleoooccce rol 3 pleooco--
zl 8
a who oo ooo oOo Slo | nlo oc oo cf
a a .
£ =
s 3
4 eoosee 14] —y
EP Blo 2 eolo Ey Bloococco
= Bloeceacocccols € alo acoacd
2 2
tle oc co cee ole nle casos
B=) Blo cao cecccale | —|zle ee coca
Bloeceecco colo Blo ccoceo
Ce a) gaeene8
EB] A a a}
tle Sco o cep oole nloooooce
| + | Blooscoceacale 3} « | Blo coco ca}
HH Blooe@cooaceocle 3 Blo oe oo ae
5 é - ce
3 é tlooeocacc-ol- z nlooeooee
> 3 z
5 . E
a 4 Ble] | Jzle oo coe oo alo Ble] | lzxlo co cece
é 5 2s a >| 3 >
$ s 3 Blo caoosce- ole 3 Blocoocee
o &. a -
5 § 2 aloo sane an ealy wise gugeg|
ic g§.2 29
ax §& -
B23. i le] | [Blo - co oc oo el bh] | [e]--cccce
By 8s Ble ws s nl-eeeere
8322208222 g Bp ssees eo esis Bpceeere
Be s “Qe 1° a o
3 < 8 eeeaeeseas 2 Reeeae
be dgdy sli] 2 leeseesecee(! gis] g [eekeees
gee Bg) & fey els] EF freee ee
« &lg e ar @
epaeie s|3il & leeeeseeeaals} SR 2 leveeges
geo58 3 SSSESSE E82] 3 geeedee
EES A288 - PeeeSeerese = weer eset
Section 79
Traffic Analysis and Reporting System
WEEKLY SUMMARY REPORT
District 2 NORTH COAST HINTERLAND DISTRICT (MR)
Road Section fl 45 COOROY CONNECTION ROAD
Site 20050 100M SOUTH OF KIN KIN RD
Type Gowege Tit
Site Stream Gazettal Direction
Traffic Class 00 All Vehicles
Data Class —P Volume
Mean Counts for
| 07-APR-2000 }}
{27-APR-2000_]}
_]
|
i
] Range [0 |
Average Average
Average
‘Thursday y Week Day % Week End
Hour Friday Saturday 4 Sunday y | Monday y Tuesday y Wednesdays, Day
12 Hour
16 Hour
18 Hour
24 Hour
AVG Week Day
(33.039
1
[105.459]
(ers) (sq
AVG Week End
AVG Day
LES ee LES
com Fos Feel oR oom oem
122.9%
bes [—Every Day —Week Day — Week End |
BOD.
Mean Traffic Flow by Hour of Day} NY
: et
0 T T T OT tT T qT 7 qv T v T 7 v TT T v T t TOT CT
Q 1 2 3 4 5 6 7 8 9 10 #11 #12 #13 #14 #16 #16 #47 «18 #19 20 24 22 23 24
HOUR ENDING
TAR310 Page 1 of 1 Printed on 22-May-2000 at 11:35
Section 80
MC Main Roads WEEKLY SUMMARY REPORT
Traffic Analysis-‘and- Reporting-System
District 2 NORTH COAST HINTERLAND DISTRICT (MR)
Mean Counts for
Road Section [145 COOROY CONNECTION ROAD
[_07-APR-2000 |
L_Jt_J
Site 20050 100M SOUTH OF KIN KIN RD
5.91
| [[27-APR-2000_}
Site Stream Against Gazettal
Traffic Class 00 All Vehicles
|
_]
Data Class 0 Volume ] Range {
o |
Hour Fridey Saturday « Sunday % Monday 4 Tuesday « Wednesdays
4)
12 Hour
416 Hour
18 Hour
24 Hour
45° al
Thursday 4 WeekDay 4 Week End 4
Average. A Average
Day
\VG Week Day 96.0%] 94.3% [oat
(i084
79.2%]
[107.7%
92.3
‘VG Week End
VG Day 101.5% 59.79) 770.0%
1 16.9
f— Every Day — Week Day — Week End |
800
Mean Traffic Flow by Hour of Day[/—
600 VV / Sas
[| / —=\\
If \
[ / \
P [/ \
° ST ott
0 1 2 3 4 § 6 7 a 9 10 19 12 13 14 15 16 17 18 19 20 24 22 23 24
HOUR ENDING
TAR310 Page 1 of 1 Printed on 22-May-2000 at 11:37
Section 81
Traffic Analysis and Reporting System M2 Main Roads WEEKLY SUMMARY REPORT District 2 NORTH COAST HINTERLAND DISTRICT (MR) : Mean Counts for Road Section [145 COOROY CONNECTION ROAD ] [2CAPR2007 | Site 20050 100m South of Rd 141-Kin Kin Rd " : | [_15-JUN-2007 |] Type Dist Site Stream (Gazettal Direction | Traffic Class 00 All Vehicles | Data Class 0 Volume ] Range [0] Average Average Hour Saturday % Sunday q Monday % Tuesday « Wednesdays Thursday » Friday % Week Day % Week End » Average Day * Peaks afi) value Time Value Tima Value Time Value Value Time _ Va! ate rom 38 Time__ Value ea mn Time _ Value AM ieee 197 (124g 124) (x2: 39 [aay (a 1 PM We 16: fred —he [87.8 12 Hour 16 Hour 18 Hour 24 Hour AVG Week Day (355R cory (558 (arq 1087 AVG Week End (117.63 86.4 AVG Day 102.34 T1224 117.54 [Fase 34 174 |--Every Day —Week Day —WeekEnd || ooo = ' QE \ Op SN “ ff iY L. Ss. - EI Todo $ 10 11 12 13 14 15 16 17 18 19 20 24 22 23 24 HOUR ENDING ° wo 0 a4 TAR310 Page 1 of 1 Printed on 26-Jun-2001 at 09:29
Section 82
WEEKLY SUMMARY REPORT Traffic Analysis and Reporting System District 7 NORTH COAST HINTERLAND DISTRICT (MR) Road Section fl45 COOROY CONNECTION ROAD ‘| Mean Counts for | | 21-APR-2001 | Site 20050 100m South of Rd 141-Kin Kin Rd | | 15-JUN-2001 ] Type TDist 5.91 Site Stream Against Gazettal | Traffic Class 00 All Vehicles | Data Class 0 Volume _] Range [ 0] Average Average Average Hour Sunday 4% Monday » Tuesday % Wednesdays Thursday y Friday 4 WeekDay % Week End % Day % Saturday Value Time Vane Time Value reg mr Time vaue 7 waive a a T23 3 8:4! y TB 16:¢: Time ve PM 12 Hour 16 Hour 18 Hour 24 Hour AVG Week Day Value mee re a on a AVG Week End [707.5% — (az5eq AVG Day rs 75.0% — Every Day p40 = 2200 Traffic Flow by Hour of ooo 1600 11400 200 800 400 200 —Week Day — Week End o 1 2 3 4 5 6 F7 8B 9 10 14 12 13 14 15 16 17 18 19 20 21 22 23 24 HOUR ENDING TAR310 Page 1 of 1 Printed on 26-Jun-2001 at 09:32
Section 83
MC Main Roads! WEEKLY SUMMARY REPORT Traffic Analysis and Reporting System easy District 2 NORTH COAST HINTERLAND DISTRICT (MR) Road Section [145 COOROY CONNECTION ROAD Mean Counts for 27-MAR-2002 Site 20050 North of Pearsons Rd Type overage | Site Stream (Gazettal Direction 30-APR-2002 Traffic Class [1A Short Vehicle = J J J Data Class 0 Volume Hour Wednesdays Thursday % Friday 4 Saturday 5 Sunday 4 | Monday » Tuesday Value TES Ta 4) 32% 4 Hi Wi: 3 AK a PM 12 Hour 16 Hour 18 Hour 24 Hour Ave Wook Oay [T0EY (TOES value Time vais TimeValue Time Value Time vate Time. Value Time 42:4 42. 12; - [12:49 124 48 421 Heed —zod ~ | Range [ 0 | Average Average % Week Day % WeekEnd Average Day Value Value, re aa cea ae [trot [1530939 160.0% ANG Day Gl cen AVG Week End Gc 107 5% 123.2% 105.794 |— Every Day — Week Day ooo —Week End | Mean Traffic Flow by Hour of Day} 800 wx [of UL 200 TT 9 TTT TTT F HOUR ENDING 7 10 14 12 13 14 16 16 17 18 19 20 24 22 23 24 TT TT TAR310 Page 1 of 1 Printed on 16-Jul-2002 at 16:17
Section 84
Wn toal
faffic Analysis and Reporting System
WEEKLY SUMMARY REPORT
cS
District 2 NORTH COAST HINTERLAND DISTRICT (MR)
Road Section it 45 COOROY CONNECTION ROAD
Site 20050 North of Pearsons Rd
Type
Site Stream Gazettal Direction
Mean Counts for
| { 27-MAR-2002 }
| { 30-APR-2002 |
Dist
Traffic Class fic Articulated Vehicle
J
Data Class 0 Volume
_| Range |
Hour Wednesdayy Thursday 4
Friday 4
Saturday y Sunday
Average Average
Tuesday y WeekDay % WeekEnd y
Average
Day
Monday *
Time Value Time _Vatue Vaiue Time Value ae. Value Vatue Time Value Time Value 7 ees Time Value
a ira q ee q tea 4 Ho 4 teed —O cea ee ‘faeg — | [rai —4 Grd [12:44]
PM ‘4 17: 4 [24:
12 Hour
16 Hour
18 Hour
24 Hour
AVG Week D: g (38.84 (a7 105.0% 14.7% 75.69
AVG Week End (28 — (33 {200.04 (eg 680.0% 100.0% 514.3%
AVG Day (ii8-7%q 94.49q (2789 = 38.94 (734 (7194.44 Taz 5H 19.4% 100.0%
[Every Day ——Week Day -—Week End |
4
Mean Traffic Flow by Hour of Dayf
\_]
A AL i fe
| PoE SAE
jo LV
o 1 2 3 4 &§ 6 7 8 9 0 14 12 139 14 15 16 17 18 19 20 21 22 23 24
HOUR ENDING
TAR310 Page 1
of 1 Printed on 16-Jul-2002 at 16:31
Section 85
\ Traffic Analysis and Reporting System ARMISy
MC Main Roads WEEKLY SUMMARY REPORT
District 2 NORTH COAST HINTERLAND DISTRICT (MR) ] Mean Counts for
Road Section it 45 COOROY CONNECTION ROAD | 27-MAR-2002
Site 20050 North of Pearsons Rd | [ 30-APR-2002 |
Site Stream Gazettal Direction "|
Traffic Class {18 Truck or Bus ]
Data Class 0 Volume ] Range [0]
Average Average Average
Hour Wednesdays Thursday 4, Friday 4 Saturday y Sunday y, Monday 4 Tuesday % WaeekDay % Week End % Day *
Peaks Time Value Time Value Time Value Time Value Time Value Time Value, Value Time Value es TimeValue
AM i ‘41 a 41:1. es Te TT4 11:43
PM 15:30 17:4 16: " 15: T55 16:1
12 Hour wa a2.5
16 Hour 97.9
18 Mour 100 93.4
24 Hour TAi0.9
AVG Week Day (773.599 (ory (ora ELE (2614 100.094 - 36.4%
AVG Week End 123.0% [780% 197.294 700.0% 165.2%
AVG Day 173.8% (4734 [34598 (134 115.8% C054 100.0%
[— Every Day —WeekDay — Week End |
60
Mean Traffic Flow by Hour of Day oN‘
[~nVN
pp LZ
9 T 7 T T T on T T qT qv T v v T F T T 1 t T qT
© 1 2 3 4 5 6 F 8 § 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
HOUR ENDING
TAR310 Page 1 of 1 Printed on 16-Jul-2002 at 16:26
Section 86
~— es Traffic Analysis and Reporting System
& Main Roads WEEKLY SUMMARY REPORT
District 2 NORTH COAST HINTERLAND DISTRICT (MR) } Mean Counts for
Road Section (145 COOROY CONNECTION ROAD ] 27-MAR-2002 |
Site 20050 North of Pearsons Rd | 30-APR-2002 |
Site Stream ‘Against Gazettal |
Traffic Class {fA Short Vehicle |
Data Class 0 Volume ° | Range [90 |
Average Average Average
Hour Wednesdayy Thursday « Friday 4 Saturday « Sunday 9 Monday 4 Tuesday » WeekDay % WeekEnd % Day %
Peaks Time Vatue one vate Time vane Vatue Time Value Time _" Value Time Vatue TimeValue Time Value Time. Value,
AM EX! a4 ite 23 ‘ oq [ &: [ 6:49
PM 16: 16:7 174 [15:30
12 Hour
16 Hour
48 Hour
24 Hour
AVG Week Day (702.999 100.74 T0725 e4a6%q (06.494 100.0% 33.9% 95.4%
AVG Week End 119.2% 100.0% 113.7%
108.0% $4.0%
Av Day (rose [—Toe.85]|— sr To.
j— Every Day —WeekDay —Week End |
1500
Mean Traffic Flow by Hour of Day}
A
IL? 4&
. fi NN
[7 \
_ Sf a
a a ee a ee
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
HOUR ENDING
1000
TAR310 Page 1 of 1 Printed on 16-Jul-2002 at 16:25
Section 87
> at Traffic Analysis and Reporting System MC Main Roads WEEKLY SUMMARY REPORT District @ NORTH COAST HINTERLAND DISTRICT (MR) Mean Counts for Road Section fi45 COOROY CONNECTION ROAD 27-MAR-2002 Site 20050 North of Pearsons Rd i 30-APR-2002 |; Type Tot 35] Site Stream (Against Gazettal | Traffic Class [1B Truck or Bus | Data Class 0 Volume ] Range [0] Average Average Average Hour Wednesdayy Thursday % Friday 4 Saturday y Sunday 4 Monday » Tuesday x Week Day % WoekEnd % Day vale TimeValue Time Value rea a Tima Value Time Value Time Value Time Value Time Value Time a raga ra HE ES | [zag PM ie Ee 44. 14; Fas i—ia 6:15] i 12 Hour 16 Hour 18 Hour 24 Hour AVG Woek Day [166.59 (333@ (375q 370 105.594 [100.0% ‘AVG Week End [fos-7%q EL] 765.5% AVG Day (roy (05.24 (004 (794 (e244 (rea (tag 112.8% 100 Mean Traffic Fiow by Hour of Day 80 - La . IRVIN i. "1 I X [— Every Day —WeekDay — Week End | . fe / 20 = + \ 9 rT v qT TT qT 1 v v Tv T T T Tv v v TT r qT T oO 1 2.93 4 6 6 7 B 9 10 11 12 13 14 15 16 17 18 19 20 24 22 23 24 HOUR ENDING TAR310 Page 1 of 1. Printed on 16-Jul-2002 at 16:30
Section 88
Traffic Analysis and Reporting System iM Main Roads “WEEKLY SUMMARY REPORT District 2 NORTH COAST HINTERLAND DISTRICT (MR) Road Section [145 COOROY CONNECTION ROAD | Mean Counts for 27-MAR-2002 Site 20050 North of Pearsons Rd | Type [30-APR-2002 | Tost [33] Site Stream Against Gazettal Traffic Class [iC Articulated Vehicle ] Data Class 0 Volume | Range | 0 Hour Wednesday Thursday % Friday Peaks Time Value Time Vatua Time Value Time Value Time Vatue Time Value Time Value Saturday » Average Average: Tuesday % WeekDay % WeekEnd % Average Sunday % Monday » Day Time Value Time Value Time Valus AM PM [iz4q [60g 29 [i24y 3 [re39, 2 (iz > [tes [iecg [74:00 12 Hour 16 Hour 18 Hour 24 Hour > fiz: 7 [1245 7 [133 5 [830, 7 fiooq— 7] [73:49] 3 70s 12:4 1 E 4 (73: q AVG Week Dat (aq 107.6 ANG Week Day [T55R] (Sa4 | HOLS (ae | Cm [07.694 AVG Day [aon (re7g (eaq (saat Darra 1077 (i299 |— Every Day —Week Day —Week End | We Mean Traffic Flow by Hour of ~ 0 — : h A | at i a \ 9 v Cer PN T T T T r T T T T T T U v TT 0 4 2 3 4 5 6 7 8 8 1 1 12 13 14 15 16 17 18 19 20 21 22 23 24 HOUR ENDING TAR310 Page 1 of 1 Printed on 16-Jul-2002 at 16:32
Section 89
Traffic Analysis and Reporting System
os {Main Roads! WEEKLY SUMMARY REPORT
District & NORTH COAST HINTERLAND DISTRICT (MR) |} Mean Counts for
Road Section [145 COOROY CONNECTION ROAD |} [04-MAR=2003
Site 20050 North of Pearsons Rd |] [(O7-APR-2003]
Type overage] Tost | 8S
Site Stream Gazettal Direction |
Traffic Class po All Vehicles _ |
Data Class ) Volume ] Range {o_]
Average. Average Average
Hour Tuesday 4 Wednesday Thursday % Friday 9 Saturday 4% Sunday » Monday q WeekDay « Weekend Day *
7 2 7 1
1
1
Peaks Time Value Time Value Time Value Time Value Time Value rae ag abd ae a ay ae
pu teed ae [read aed [ig ed [rad [trad — ae
12 Hour
16 Hour
18 Hour
24 Hour 7
NoWekoy (Cea oy | EA Cae
AVG Week End (Ta [336%
AVG Day (0509 (106.833 (09-394 (13.634 (33999 EI (03-634
= Every Day —Week Day — Week End ‘|
1500 :
Mean Traffic Ftow by Hour of Da
r™
_ J \
. LF_\
/ \
_ LY Ss
SSO
Oo 1:2 3 4 5 6 7 8 8 10 44 12 13 14 15 16 17 18 49 20 21 22 23 24
HOUR ENDING
TAR310 Page 1 of 1 "Printed on 16-Apr-2003 at 15:02
Section 90
a | Traffic Analysis and Reporting System ARMISP.
iM? Main Roads WEEKLY SUMMARY REPORT \ a
District 2 NORTH COAST HINTERLAND DISTRICT (MR) ~} ~~ Mean Counts for
Road Section i 45 COOROY CONNECTION ROAD I [ 04-MAR-2003 |
Site 20050 North of Pearsons Rd i [07-APR-2003 |
Type TDist
Site Stream Against Gazettal |
Traffic Class 00 All Vehicles I
Data Class 0 Volume | Range [ 0 |
Average Average Average
Hour Tuesday % Wednesdays Thursday , Friday 4 Saturday 4 | Sunday » | Monday », WeekDay 4 WeekEnd 4 Day =
Peaks Tima Value Tine Value Tee value. Time Valve Time value Tine. Value. Tae Value Time Value. He a ay aaa
AM [sei 388 10:4 A x a
PM 16:14] Tet aN 7 Te 3 13: 1s a Ferd Hq 334 Lewd
12 Hour
18 Hour
18 Hour
24 Hour
AVG Week Day [97.1% 98.394 101.74 107.99 ; 160.0%] 774 93.49
ANG Week End (07.09 [33.09 129.8% 100.0% 121.3%
AVG Day (20339 (705.299 (fos84 (559 {362% {76.79 101. 107.0% 825% 100.0%
—— Every Day + Week Day ~— Week End
1800
Traffic Flow by Hour of
800
600
200
o 1 2 3 4 § 6 7 B8 9 10 44 12 13 14 16 18 17 48 19 20 21 22 23 24
HOUR ENDING
TAR310 Page 1 of 1 Printed on 16-Apr-2003 at 15:03
Section 91
Traffic Analysis and Reporting System MQ Main Roads! WEEKLY SUMMARY REPORT District 2 NORTH COAST HINTERLAND DISTRICT | Mean Counts for Road Section [145 COOROY CONNECTION ROAD | [ 16-MAR-2004 | Site 0050 North of Pearsons Rd | [_ 12-APR-2004 | Type rat 88) Site Stream All Site Streams | Traffic Class 00 All Vehicles | Data Class () Volume | Range | Average Average Average Hour Tuesday 4 Wednesdayy Thursday y Friday % Seturday % Sunday q Monday q WeekDay y WeekEnd 4 Day 4 Peaks Time Value a Tima Value Time Value aaa, Vatue Tine Value Time Value Time Value Time Value am = [a4 597] a [s0q_a7q a4q 46g [ 84G Sad (113 437] 90 _— 45a PM lesa Ferg q Fen a a ben iy EE aay] fa — aa 3aq| [Tea aad [Tete Sag [s0q ati} etg 477 12 Hour 16 Hour 4] 18 Hour Sy 24 Hour AVG Week Gay [100.194 102.4% 108.04 9784 [90909 AVG Weak End [078 [Teso%q AVG Day (oer (Fos2q [160%] (oa3g [late (750%) (7.04 -+EveryDay —Week Day —Week End 2200 12000 in Traffic Flow by Hour of 1800 600 1400 1200 1000 B00 8 0 12 3 4 5 6 7 8 9 1 11 12 13 14 16 168 17 18 19 20 24 22 23 24 HOUR ENDING TAR310 Page 1 of 1 Printed on 11-May-2004 at 12:12
Section 92
* ; Traffic Analysis and Reporting System
— Q oveesstan Government - > WEEKLY SUMMARY REPORT
© ongicitmert of eae mead
District 2. NORTH COAST HINTERLAND DISTRICT | Mean Counts for
Road Section {145 COOROY CONNECTION ROAD | [_17-MAR-2005° |
Site 20050 North of Pearsons Rd | [[07-APR-2005 7]
Type COVERAGE Toist [3.3
Site Stream (All Site Streams |
Traffic Class 00 All Vehicles
SS =
q Range j; 0 ¢
Data Class 0 Volume
DO pee a eo
eet
Hour Friday Saturday Sunday 4 | Monday q Tuesday 4 Wednesdayy Thursday % WeekDay q WaekEnd y Day
“1
+
Peaks nine... Value Time Value Time _Valua_ Time _Vatue Time Vatue_ ylime__ Vatue_ ime... Natue ame Value Time Value Time.
AM
12 Hour
16 Hour
18 Hour
24 Hour
Average Average Average
| _ 423 f 8:46 4757 8:45 8G, Ba STAT Ba! Peas” 840 71200 456, 9:00
at aeh 3 7 2 ro - Seta Es ea - 387, seh F508] ~ ae 8 ma.
a PBS ITSO 604 | 16:18 Bit
%
Value |
AVG Week Day O12 (tors [102.8%] {168.359 100.0% 74.079
92.6%
AVG Week End 108.9! 94.1 135.2% 100.0%
125.2%
AVG Day 103.6% 87.0 72.8 96.5% 170.1% irq iro 108.0% 79.9%
100.094
be EveryDay -WeekDay —=-Week End }
i600 | eo
Mean Traffic Flow by Hour of Day
fa’
is “An
400 f: f
ie (7
ae 4
ae é
ge
fs oF
af
A /
200 ie T
ay /
ff
CT
(ed
io"
o + Eom *
T v T T T v T T T qT q T 7 T T T T T T
o 1 2 3 4 5 6 7 8 9 10 14 12 13 14 18 18 17 18 49 20 21 22 23 24
HOUR ENDING
TAR310 Page 1 of 1 Printed on 13-Apr-2005 at
16:41
Section 93
sland Tratfic Analysis and Reporting System
ent WEEKLY SUMMARY REPORT
District NORTH COAST HINTERLAND DISTRICT ~__] Mean Counts for
Road Section [145 COOROY CONNECTION ROAD | [10-MAR-2006 ]
Site 20050 North of Pearsons Rd | [ 30-MAR-2006 |
Type TDist
Site Stream All Site Streams ‘I
Traffic Class 0 All Vehicles
Data Class 0 Volume | Range [0 |]
Average Average Average
Hour Friday , Saturday % Sunday ~% Monday % Tuesday q% Wednesdays, Thursday 4, WeekDay 4, WeekEnd % Day
1
Peaks rae a RE Va m3 rea om rea eat Tine Value Hime Value “ine Vatue Time Value Time Value Time Value
aM fas [sog "say
PM Head —ese Had ia [ea = [ea—ad = head od Te ee a oa [Te 619 [15:00 426 [16:15
12 Hour
16 Hour
18 Hour ! E
24 Hour 1 1
AVG Week Day [ 104: =] Ea? (99.194 (98.54 [103.799 100.094
AVG Week End (iae.69q [et 137.5
AVG Day (334 I 85.64 (20% (02193 (0754 (ose 11259 108.5
firEveryDay —-Week Day =WeekEnd |
600 —F— - ee HH ty - aro fs -ar ee a
re TT
Oo o4 2 3 4 5 6 7 B 9 10 11 12 413 14 15 16 17 18 19 20 21 22 23 24
HOUR ENDING
TAR310 - j Pagelof1 . ....... Printed.on 19-Apr-2006 at 16:25
Section 94
Section 95
I
HC ERER ERA EE ERROR ESSERE SERA [RRR e RAR S Eee ed
CWE EM iene acu www.mrcagney.com
McCormickRankinCagney
50 Park Road
Used in these records
About this file
- File size
- 4.9 MB (large file)
- File type
- TIF
No other editions are linked here.
Original file
The download may take up to a minute.