Council archive · source document
07/2398 - Traffic report · 132007.2398
are included in Appendix D. The 2007 traffic volumes are summarised on Figure B1, Appendix B. The survey results determined that the AM peak period for the external road network occurred between 8:00am and 9:00am, and the PM peak period for the external road network occurred between 4:45pm and 5:45pm. Traffic volumes surveyed during these peak hour periods were incorporated into the analysis of existing and future conditions to estimate the traffic-related impacts of the proposed development on the external road network. : Discussions with DMR staff have indicated that growth rates on Elm Street, based on the previous 5-year survey data at multiple sites along Elm Street (Cooroy Connection Road), have been in the order of 3% per annum. This figure represents the growth assumed by DMR for their road maintenance operations. 3427-001(1}-Final.doc: 04/12/07
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2398 - Traffic reportRelated documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
- TIF
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.