Skip to the record
The only place to find full transcripts.

Council archive · source document

07/2398 - Traffic report · 132007.2398

of 95

Text shows just the words. Original shows the document exactly as it was published.

 

 

are included in Appendix D. The 2007 traffic volumes are summarised on Figure B1, Appendix
B.

The survey results determined that the AM peak period for the external road network occurred
between 8:00am and 9:00am, and the PM peak period for the external road network occurred
between 4:45pm and 5:45pm. Traffic volumes surveyed during these peak hour periods were
incorporated into the analysis of existing and future conditions to estimate the traffic-related
impacts of the proposed development on the external road network. :

Discussions with DMR staff have indicated that growth rates on Elm Street, based on the
previous 5-year survey data at multiple sites along Elm Street (Cooroy Connection Road), have
been in the order of 3% per annum. This figure represents the growth assumed by DMR for
their road maintenance operations.

 

3427-001(1}-Final.doc: 04/12/07

 

 

Used in these records

About this file

File size
4.9 MB (large file)
File type
TIF

No other editions are linked here.

Original file

Log in to download the original file

07_2398 - Traffic report.tif · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.