Council archive · source document
07/2398 - Traffic report · 132007.2398
Table 3: 2009 Base Case Traffic SIDRA Analyses rat eter Highest | Highest 95th | honest Level Of Intersection Intersection 9 Degree of %ile back of Delay Service Saturation Queue (m L.O.S) (vph) * | too) | +S) AM Peak Hour (8:00 - 9:00) Eim Street / . 4, Diamond Street 1,776 0.54 33 34.2 D Elm Street / Pearsons Road 839 0.29 14 11.8 B PM Peak Hour (15:45 — 16:45) Elm Street / , Diamond Street 1.644 oat 2 27.8 D Elm Street / 835 0.23 16 0.23 B Pearsons Road Note: Practical Maximum Degree of Saturation (X,) for unsignalised intersections is 0.80. Acceptable Level of Service — LOS 'C’ According to Table 3, the Elm Street / Diamond Street intersection and the Elm Street / Pearsons Road intersection would operate within acceptable limits during the base year of 2009. 4.2 2019 Base Traffic Operations Population growth in the Shire is expected to remain relatively stable over the next 10 years, reaching the Shire Council's maximum population levels as per the Council's planning scheme in FY2013. As such, a conservative growth rate of 3% (compound) per annum was maintained throughout the planning period of 2009-2019. Traffic volumes during the 2019 AM and PM peak are illustrated in Figures B5 and B6. The following table summarises the results of a traffic operational assessment for the three key intersections that could potentially be affected by the proposed development for the 2019 planning horizon year. The base 2079 Intersection Movement Summary for the intersections is provided in Appendix C. 3427-001(1}-Final.doc: 04/12/07
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2398 - Traffic reportRelated documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
- TIF
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.