Council archive · source document
07/2398 - Traffic report · 132007.2398
The analysis indicates that, provided the intersection is signalised (by others), the Elm Street /
Diamond Street intersection will function at a satisfactory degree of saturation into and beyond
the planning horizon year of 2019 with the combined base traffic volumes and those of the
ultimate development proposal.
It should be noted that the traffic generated by the proposal appears to have a minimal impact
on the operation of the intersection, as it only results in an increase in the maximum degree of
saturation of 0.02 for the critical movement over the base case for the 2019 scenario. This is a
reflection that the development represents less than 5% of the traffic through the intersection.
Therefore, no works are required at this intersection as a consequence of the development.
5.2.2 Elm Street / Pearsons Road Intersection
The results of the traffic analysis for the 2019 scenario including both base traffic and traffic
generated by the proposed development are presented in Table 9. The intersection Movement
Summary data (from SIDRA3.2) are provided in Appendix C.
Table 9: 2019 Design Intersection Analysis — Elm Street / Pearsons Road Intersection (with
Right Tum Lane from Elm Street)
Movement Volume Degree of Delay (s) 95” %ile Queue
Saturation 0) _{m)
AM Peak Hour
Elm Street South (1) 279 0.15 0 0
Elm Street South (R) 71 0.08 11.7 3
Pearsons Road East (L) 101 0.19 13.9 6
_Pearsons Road East (R) | 4 0.19 14.0 6
Elm Street North (L) 6 0.39 B82 0
Elm Street North (T) 734— 0.39 _O 0
PM Peak Hour
Elm Street South (1) 515 0.27 0 0
Elm Street South (R) |. 90 0.09 10.6 3
Pearsons Road East (L) 56 0.12 ; 13.6 4
Pearsons Road East (R) 12 0.12 13.5 4
Elm Street North (L) 6 0.29 8.2 0
Elm Street North (T) §33 0.29 0 0
Note: Practical Maximum Degree of Saturation (X,) for unsignalised intersections is 0.80.
The analysis indicates that introduction of the traffic generated by the proposed development will
have minimal impacts on the capacity or operations of the intersection of Elm Street and
Pearsons Road following implementation of the ultimate development by 2019, provided the
recommended intersection improvements are undertaken (i.e. construction of a right-turn bay
from Elm Street into Pearsons Road as shown on Figure A2 within Appendix A of this report).
3427-001(1}-Finat.doc: 04/12/07
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2398 - Traffic reportRelated documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
- TIF
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.