Council archive · source document
07/2398 - Traffic report · 132007.2398
13
Table 4: 2019 Base Case SIDRA Traffic Analyses
Total Highest | Highest osth | “lshest | | evel of
Traffic Entering Average
Intersection Intersection Degree of %ile back of Delay Service
Saturation Queue (m! L.O.S
(vph) ® (m) (sec) { )
AM Peak Hour (8:00 — 9:00)
Elm Street /
Diamond Street 2,386 4.14 204 395.3 F
Elm Street / 4,127 0.39 18 14.0 B
Pearsons Road
PM Peak Hour (15:45 — 16:45)
Elm Street /
Diamond Street 2,209 1.04 141 207.1 F
Elm Street / 1,123 0.31 29 137 | - B
Pearsons Road
Note: Practical Maximum Degree of Saturation (X,) for unsignalised intersections is 0.80.
Acceptable Level of Service - LOS ‘C’
The 2019 “Base Case” analysis indicates that the Elm Street / Pearsons St intersection would
continue to perform within capacity; however, the Elm Street / Diamond Street intersection
would most likely exceed its capacity prior to 2019 and therefore will need to be signalised by
this time. The movements expected to experience significant delays would be the northbound
right-turn movement from Diamond Street to Elm Street.
The analysis was revised to incorporate a traffic signal at the intersection of Elm Street and
Diamond Street to mitigate the impacts of traffic growth. The results of the revised intersection
analysis are presented in Table 5 below. The layout of the intersection adopted for the SIDRA
analysis for the signalised intersection is illustrated as Figure 6.
x
li
E
Diamond E
II
g
Elms
Figure 4: Signalised Intersection layout adopted for SIDRA analysis
Elm Street / Diamond Street
3427-001(1}Final.doc: 04/12/07
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2398 - Traffic reportRelated documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
- TIF
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.