Council archive · source document
07/2398 - Traffic report · 132007.2398
Appendix C
SIDRA3.2 ‘Movement Summary’ Output Data
u
€ec¢eete eke ee &€ ete &€ & ee vee
2009 Base AM - Elm at Diamond
2009 Base PM - Elm at Diamond
2009 Base AM - Elm at Pearsons
2009 Base PM - Elm at Pearsons
2019 Base AM - Elm at Diamond
2019 Base PM - Elm at Diamond
Signalised 2019 Base AM - Elm at Diamond {with phasing)
Signalised 2019 Base PM - Elm at Diamond {with phasing)
2019 Base AM - Elm at Pearsons
2019 Base PM - Elm at Pearsons
2009 Design AM - Elm at Diamond
2009 Design PM - Elm at Diamond
2009 Design AM - Elm at Pearsons
2009 Design PM - Elm at Pearsons
Signalised 2019 Design AM - Elm at Diamond (with phasing)
Signalised 2019 Design PM - Elm at Diamond (with phasing)
2019 AM Design - Elm at Pearsons
2019 PM Design - Elm at Pearsons
3427-001(1)-Final.doc: 04/12/07
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2398 - Traffic reportRelated documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
- TIF
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.