Skip to the record
Every meeting, every word.

Council archive · source document

07/2398 - Traffic report · 132007.2398

of 95

Text shows just the words. Original shows the document exactly as it was published.

Phasing Summary
SIDRA ~"m
INTERSECTION

Phasing Summary

Elm St / Diamond St Intersection (Signalised Option)

2019 AM Base

C = 90 seconds

Cycle Time Option: Optimum cycle time (Minimum Delay)
Phase times determined by the program.

Page 1 of 1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Phase H Phase G [Phase I
| me i _

Green Time = 46 seconds Green Time = 14 seconds Green Time = 12 seconds
Phase Time = 52 seconds Phase Time = 20 seconds Phase Time = 18 seconds
Phase Split = 58 % Phase Split = 22 % Phase Split = 20 %

Norma! Movement Permitted/Opposed

Slip-Lane Opposed Slip-Lane

Stopped Movement Continuous

Tum On Red

4-

SIDRA SOLUTIONS

Site: Signalised 2019 AM Elm at Diamond
T:\3400-3499\3427 - Cooroy Retirement Community\SIDRA\Elm and Diamond Nov 28.aap

Processed Nov 29, 2007 01:27:11PM

A1059, McCormick Rankin Cagney, Large Office
Produced by SIDRA Intersection 3.2.1.1478
Copyright 2000-2007 Akcelik and Associates Pty Ltd
www. sidrasolutions.com

about:blank

29/11/2007

Used in these records

About this file

File size
4.9 MB (large file)
File type
TIF

No other editions are linked here.

Original file

Log in to download the original file

07_2398 - Traffic report.tif · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.