Council archive · source document
07/2398 - Traffic report · 132007.2398
Phasing Summary SIDRA INTERSECTION Phasing Summary Elm St / Diamond St Intersection (Signalised Option) 2019 PM Base C = 70 seconds Cycle Time Option: Optimum cycle time (Minimum Delay) Phase times determined by the program. Page | of 1 Phase H Phase G Phase I — — : _ Demat _ Green Time = 24 seconds Green Time = 16 seconds Green Time = 12 seconds Phase Time = 30 seconds Phase Time = 22 seconds Phase Time = 18 seconds Phase Split = 43 % Phase Split = 31 % Phase Split = 26 % Normal Movement Stip-Lane Stopped Movement Turn On Red + SIDRA SOLUTIONS Permitted/Opposed Opposed Slip-Lane Continuous Site: Signalised 2019 PM Elm at Diamond T:\3400-3499\3427 - Cooroy Retirement Community\SIORA\EIm and Diamond Nov 28.aap Processed Nov 29, 2007 01:28:23PM A1059, McCormick Rankin Cagney, Large Office Produced by SIDRA Intersection 3.2.1.1478 Copyright 2000-2007 Akcelik and Associates Pty Ltd www, sidrasolutions.com about:blank 29/11/2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2398 - Traffic reportRelated documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
- TIF
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.