                       AGENDA


         General Committee
             Meeting

               Monday, 28 April 2014


                   commencing at 10am
         Council Chambers, 9 Pelican Street, Tewantin



Committee: Crs Tony Wellington (Chair), Bob Abbot, Sandy Bolton,
           Joe Jurisevic, Frank Pardon, Noel Playford, Frank Wilkie
Log in to download the original file

2014-04-28 General Committee Meeting Agenda Pages 1-64(PDF, 6MB).pdf · 5.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 63 sections

Section 2

GENERAL COMMITTEE MEETING AGENDA                                  28 APRIL 2014




TABLE OF CONTENTS
ITEM     SUBJECT                                                         PAGE


ATTENDANCE & APOLOGIES                                                       3
PRESENTATIONS                                                                3
ITEMS REFERRED FROM INFRASTRUCTURE & SERVICES COMMITTEE                      3
ITEMS REFERRED FROM PLANNING & ORGANISATION COMMITTEE                        3
REPORTS TO GENERAL COMMITTEE                                                 4
1.     WASTE STRATEGY OPTIONS DEVELOPMENT – PROJECT PLAN                     4
2.     PRE-RESPONSE REQUEST TO CHANGE CONDITIONS OF PLANNING &
       ENVIRONMENT COURT ORDER (318/2008) FOR A DEVELOPMENT PERMIT
       FOR A MATERIAL CHANGE OF USE FOR A RESOURCE BASED SPRING
       WATER BOTTLING PLANT (COOROY MOUNTAIN SPRING WATER) AT 314
       COOROY MOUNTAIN RD, COOROY MOUNTAIN                                  26
3.     APPLICATION FOR AN EXTENSION TO RELEVANT PERIOD FOR 26
       MULTIPLE DWELLING UNITS & AN ACCOMMODATION BUILDING FOR 12
       UNITS, SITUATED AT 27 ATTUNGA HEIGHTS, NOOSA HEADS                   49
4.     APPLICATION FOR MATERIAL CHANGE OF USE – SERVICE AND UTILITY
       TYPE 3 (TOWER), SITUATED AT 153 LAKE FLAT ROAD, BOREEN POINT         65
5.     APPLICATION FOR AN EXTENSION TO OPERATIONAL WORKS PERMIT
       FOR PRESCRIBED TIDAL WORKS – EXTENSIONS OF PONTOONS FOR
       MOORINGS                                                             76
6.     COUNCIL POLICY – NAMING OF ROADS,            PARKS,   COMMUNITY
       INFRASTRUCTURE & STREET NUMBERING                                    84
7.     ACCOMMODATING RECREATIONAL VEHICLES AND CAMPING IN NOOSA             89
8.     INVITATION TO JOIN THE SUNSHINE COAST RIVERS INITIATIVE             101
9.     POLICE BEAT – PROPOSED NEW 5 YEAR LEASE                             105
10.    EXPRESSION OF INTEREST FOR LEASE AT 4 JARRAH ST COOROY              108
11.    SHOP 6 SUNRISE NEIGHBOURHOOD SHOPPING CENTRE – 2 X 5 YEAR
       LEASE AGREEMENT                                                     111
12.    COMMERCIAL USE OF COMMUNITY LAND POLICY                             114
13.    FINANCIAL PERFORMANCE – MARCH 2014                                  122
14.    QUARTERLY OPERATIONAL PLAN PROGRESS REPORT                          128
15.    STANDING ORDERS FOR COUNCIL MEETINGS                                177
16.    CHANGE OF VENUE FOR COUNCIL MEETINGS                                198
CLOSED SESSION                                                       200




                                                                   Page 2 of 200

Section 3

GENERAL COMMITTEE MEETING AGENDA                                            28 APRIL 2014


ATTENDANCE & APOLOGIES



PRESENTATIONS

10am      “Bang The Table” Community Engagement Online System
          Ray Scanlan (presenter);
          Overview of suite of sophisticated feedback tools, communications and information
          resources in one platform gathering rich qualitative and quantitative feedback to
          improve real time decision-making.

10.45am   Waste Strategy
          Ian Christesen, Lloyd Consulting (presenter);
          Council has commenced the development of a Waste Strategy and Lloyd consulting
          have produced a Waste Management Scoping Study and Project Plan as the initial
          stage of the process. An overview of the work will be provided.



ITEMS REFERRED FROM INFRASTRUCTURE & SERVICES COMMITTEE
Nil.


ITEMS REFERRED FROM PLANNING & ORGANISATION COMMITTEE
Nil.




                                                                             Page 3 of 200

Section 4

GENERAL COMMITTEE MEETING AGENDA                                                     28 APRIL 2014


REPORTS TO GENERAL COMMITTEE

1.    WASTE STRATEGY OPTIONS DEVELOPMENT – PROJECT PLAN

Author            Manager Waste and Environmental Health, Wayne Schafer
                  Community Services

Index             ECM/Subject/Waste Management

Attachment        1.    Noosa Council Waste Options Development Project Plan

RECOMMENDATION

That Council note the report from the Manager Waste and Environmental Health to the General
Committee Meeting dated 28 April 2014 and

A.    Note the report from Lloyd Consulting titled “Noosa Council Waste Options Development
      Project Plan”; and

B.    Authorise the CEO to release a tender and engage a suitable consultant to investigate and
      report on the themes identified in report by Lloyd Consulting.

REPORT

In January 2014 Council commissioned Lloyd Consulting (The Consultant) to commence work on
a new Waste Strategy for Noosa Council.
Following a Council workshop with the Consultant on 11 March 2014, Council decided to develop
a Waste Strategy for Noosa titled “Towards Zero Waste”, based on the staged approach which is
summarised below:

Part 1 Options Development
     Identification of waste management themes and options for further consideration and
      investigation (the current stage under consideration in this report)
     Detailed assessment of waste management options (to be tendered in the next stage of the
      development of the waste strategy)
     Council and community consultation/consideration of options.

Part 2 Waste Strategy and Action Plan
     Development of an agreed Waste Strategy and an action plan based on selected options
      following community consultation.
Lloyd Consulting has examined Council’s current waste operations and identified 5 themes and a
number of options which are recommended for further investigation, ( as detailed in Attachment 1).
Subject to Council agreeing with the themes identified for further investigation, the next step is to
call a tender for detailed investigation and costing on the identified options.
Following this detailed analysis it is planned that Council will engage with the community in a
discussion on their preferred Waste Strategy outcomes considering the costs involved. Following
this community consultation the Waste Strategy document and action plan will then be
completed.
Ian Christesen from Lloyd Consulting will be attending the Council General Committee meeting
28 April 2014 to present and discuss the themes in more detail.


                                                                                     Page 4 of 200

Section 5

GENERAL COMMITTEE MEETING AGENDA                                                    28 APRIL 2014


Previous Council Consideration
18 February 2014 – Presentation to Councillors, staff and Lloyd Consulting by Umur Natus-Yildiz
from LGIS on alternative waste management approaches.
11 March 2014 - Councillors and staff attended a Waste Strategy Workshop with Lloyd
Consulting.
20 March 2014 - Draft Options circulated to Councillors and staff for comment as a preliminary
step in the development of themes for further development in Stage 2 of the Waste Strategy
development.
Finance & Risk
There is no significant financial risk associated with this report. Budget costs for this report are
contained in the current 2013/14 budget.
The next step in the Waste Strategy development involves a further consultancy to explore the
identified themes for further investigation, development and costing.
A budget of $150,000 has been assigned in the draft 2014/15 Waste Management budget for
completion of this consultancy.
The funding allocation will also enable staff to undertake concurrent investigations to provide
supporting information to the consultants such as waste contamination levels in wheelie bins, trial
collection services for glass in commercial areas, undertake water quality investigations at the
landfill and the potential environmental impacts of future strategic initiatives.
No funds have been allocated to community consultation from the waste budget.
Consultation
External Consultation - Community & Stakeholder
No external consultation has been undertaken at this time as the consultants brief was to identify
external stakeholders to be consulted later in the process of developing the Waste Strategy.
Internal Consultation
A draft copy of the consultant’s report was circulated to Councillors and senior staff for comment
20 March 2014.
Departments/Sections Consulted:

x   Community Services                             Planning & Infrastructure
    Disaster Management & Public Order             Building & Plumbing Services
    Waste & Environmental Health                   DA Planning
    Community Facilities                           Strategic Land Use Planning
    Cultural Facilities                            Asset Design & Investigations
                                                   Asset Planning
                                                   Civil Operations
                                                   Environment

    Executive Office                               Corporate Services
    Community Engagement                           Finance
    Customer Service                               ICT
    Executive Support                              Procurement & Fleet
    Governance                                     Property & Facilities
    Human Resources                                Revenue Services




                                                                                     Page 5 of 200

Section 6

GENERAL COMMITTEE MEETING AGENDA    28 APRIL 2014


                                   ATTACHMENT 1




                                     Page 6 of 200

GENERAL COMMITTEE MEETING AGENDA                              28 APRIL 2014

                                                             ATTACHMENT 1

 |                                             © man       =     .

                                 REPORT

                              Noosa Council
                      Waste Options Development
                               Project Plan

            Prepared for: Noosa Council
            Document No.: 13-889-R-003-B
            Date:        23/04/2014

                                                               Page 6 of 200

Section 7

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 7 of 200

GENERAL COMMITTEE MEETING AGENDA                                                            28 APRIL 2014

                                                                   S lloydconsultin,
                                                                                      environmental services

     Noosa Council Waste Options Development Project Plan

      DOCUMENT HISTORY AND STATUS

       23/04/2014    B                Final

      DISTRIBUTION OF COPIES

       23/04/2014     B               E         Fox Rogers
                                                Interim Director Community Services
                                                Noosa Council
                                                Email: [email protected]

                                      E         Wayne Schafer
                                                Manager Waste & Environmental Health
                                                Noosa Council
                                                Email: [email protected]

      By
      Lloyd Consulting Environmental Services Pty Ltd
      ABN: 35 144 787 002
      30 Heather Street
      PO Box 320
      Wilston QLD 4051
      Web: www.lloydconsulting.com.au
      P: 07 3352 7300
      F: 07 3352 7333

      lan Christesen                              Trevor Lloyd
      Project Manager                             Director

                                                                                             Page 7 of 200

Section 8

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 8 of 200

=                                                                                                             3
 oS
 N                                                                                                             ~
 =         ba                                                                                                  °
 o          —                                                                                                  ©0
 o          ={                                                                                                 ®
 <q        —                                                                                                   >
 ©          =           ToUNT   PE PAVIA SR A         aggaae & asagas                                          &
 “          ~           Padi     a  EEETEEL ETE     PT TTEEEP    EP ahiad
            f           -  S95 & ‘SB? sk E-Sa:8 FEN BRS SIRO RE tS OR OR ee
            =           :  ge i     Popa fey dep FS Ph sd Reese: 6: dt Bie Pay
            5           ;  £3   2   SRE  PS Fae     F £1 Ee     FE 4 bea is
                        (S34        Ae       IA ee 4  Pra 6       3 Be                             g
           S            r  £4  4    AREL REI PE     4 FS EST   OU @ fa 4                           s
                           446   Se 9 ERI BIS Ee    2 fa Ped OE OS Bel
           =            |  7)    F  Tbe Feeie       | GL erEE   EW EB                             z
                        PEE         TEEPE          Pg                                             s
                        D  2a o SER ES Bee ede     Se 2a ERS   UE  4 RSS fea
                          232    &  2 RE BES Pee   eS Oa BS OU 4 ba                                e
                        Fo oa f Se  SRA REST RIE    & gees      FOF RBG Fi                         3
                         7. 86a  ce  Poe Fl ES EE:   lO UEC Se OCU Oe CRBs? Bd                     an
                        P  Wea & Re 2 Bro 2d ist E: oh 6Sg Rees CUE CUT Rea) Ba                    c
                        ,  eam ceo te Pe acd Fab i:  | ed BEE OU:  a Fea es                        S
                        .  $49 © SEH BEd ESSE EG    a «O6f6)] ESE OU 6 Ea BS                       boa
                         £2F     BCS Ee REE] ORL EEEY           6  4 Bi                           3
                        1   at   PTT PEI        E   | WER      Ea                                  S
                        1  4b    F  Fhe, BPR       aA PL BEET OB   4 p64                           5
                        1  $9f   4  FRIAS EET TEE   4 dd kieeb UE Od ps
                        P  ib    2  TERA PEL PLR 4d    4 PEELE  @  4 ERY
                        Po fit   fF FERED R_LEL     |} Pititgs 8   7 reesei
                        Porat    do opereebb edd?   @ fanti@ @     4 peak
 <                      Puli RB     TELETELELE © Giaaee & Lidge
                        Pulp        Gilitiiiih Boi pS go | bel
 Z                         nn       PHititsidy 2g Giiiik 2 Lidge
                        io: BP:     PE rriPigig i         a os     1 ie<e ge
 g                         iin:    Sig TIZIB]      E  LLiiib &     S333
                  ”     i  (2   2 Sie ii igié |       fig iif   &® BEgabe
 So              we     ;  igs  2  gis Ph BIS |        iigais   2 &   SSE
 Zz               =     }  igs 5   < gigizis: $8      igSzpvis  8  Bea Fs
 -                      z  i3s       iRise iets       i,    i's B  Pea Se
to                          gs     Bibi is igi     5  siakes 2     sepisé
uw                W        ie   B  eo ciSis| 2 geagda           & Q32ee2
 =                         gps       i  ike oe are    Stttte       Sib eke
uw                ‘ss      tte e Fabgigighs § g33335            §  222235
tu                Oo       Sea     FSESESEZEES     &  #@écaa    ¥ 22gaea
 E                                           ,
 =                C)       aA      adanane wad        qINmM tds    aaddn ns
 Ss                     a  awa  ~  NNAN AN ANN mm     naam es co i
                      0 cee wes Neen een ee ean            ee        ee
 Oo
 Oo
 —_
 =z
 oc
 Lu
 z
 lu
 O

Section 9

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 9 of 200

GENERAL COMMITTEE MEETING AGENDA                                                                  28 APRIL 2014

                                                                             3 lloyd ONSUITING

                   1.1 Context
                   Noosa Council (NC) is in the process of establishing key management strategies and
                   systems that reflect Council’s values and principles across all areas of responsibility.
                   Effective and efficient waste management is the subject of one of these key
                   strategies.
                   Noosa prides itself as an environmentally responsible destination.   The Noosa
                   Council area is a UNESCO listed Biosphere Reserve.   Future waste management
                   practices must strive to be economically and environmentally sustainable in
                   accordance with the principles embodied in the Biosphere listing. To this end, NC is
                   developing a ‘Towards Zero Waste’ Strategy (the Strategy}.
                   Council currently operates the Eumundi Road Recycling and Disposal Facility as well
                   as smaller transfer stations at Cooroy and Pomona townships. Landfill operations
                   were first established at the Eumundi Road site in 1984. The site is located in an
                   area considered suitable for landfill cell construction but is surrounded by areas of
                   potentially significant environmental value.
                   Key outcomes of the Strategy will, therefore, include the aim to achieve 2 significant
                   reduction in the volume of waste sent for disposal at the Eurnundi Road site and to
                   ensure that any future waste materials disposed of at the site have a low risk of
                   environmental impact. The waste hierarchy will guide strategic actions, with suitable
                   resources allocated to the priority areas of waste avoidance and reduction.

                                                              Lloyd Consulting | Introduction

                                                                                                   Page 9 of 200

Section 10

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 10 of 200

GENERAL COMMITTEE MEETING AGENDA                                                               28 APRIL 2014

           S Moydeonsuliine
                             tetet areaecta! sence
                                               Most Preferable

                                              Least Preferable
                  To achieve these key outcomes, the Strategy will need to drive significant
                  improvements in waste avoidance and reduction, as well as improving waste
                  recycling rates and implementing cost effective waste treatment methods.  It is
                  expected that these outcomes will only be achieved through significant and
                  sustained community education and involvement.
                  In order to develop the Strategy, options for achieving these key outcomes need to
                  be identified and characterised, including cost benefit analyses. The most suitable
                  options can then be selected by Council and the community for inclusion in the
                  Strategy. Options will need to be capable of being delivered over the Strategy’s
                  intended five year period 2015 — 2020.

                  1.2 Towards Zero Waste Strategy
                  NC has identified the goals of the Strategy as follows:
                      1. Significantly improved waste avoidance through effective community
                         education and engagement.
                      2, Implementation of leading waste management practices in accordance with
                         Biosphere principles.
                      3. Innovative and cost effective service delivery including enhancement and
                         support of local businesses.

                 ee Introduction | Uoyd Consulting

                                                                                               Page 10 of 200

Section 11

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 11 of 200

GENERAL COMMITTEE MEETING AGENDA                                                                  28 APRIL 2014

                                                                           S Iloydeoisiiine
                                                                                              eeireacnrety series

                   To ensure an effective and measured (fact-based) development of the Strategy, NC
                   has requested a two-part process:
                   Part 1 (Options Development)
                   *  Identification and assessment of waste management options (i.e. waste practices,
                      policies and activities), Including cost benefit analysis, to deliver Strategy goals
                   =  Council and community consultation/consideration of options
                   Part 2 (Waste Strategy and Action Plan)
                   *  Development of agreed Waste Strategy and an Action Plan based on selected
                      options

                   1.3 Scope of Project Plan
                   The present Options Development Project Plan (Project Plan) is limited to Part 1 of
                   the methodology for strategy development.
                   The Project Plan is intended to provide a framework for the assessment and
                   selection of a best value solution for the management of waste in the Noosa Council
                   (NC) area. The Project Plan presents priority ‘themes’ and associated options, which
                   have been identified In consultation with Council, and which should form the focus
                   of the options Gevelopment phase. In addition, the Project Plan indicates NC’s
                   preferred approach to management (timeframes, reporting, principles, procedures,
                   etc.) of the options development process. Effectively, the Project Plan presents a
                   brief for those tasked with Part 1 of the Waste Strategy preparation.

                                                              Lloyd Consulting | Introduction SS

                                                                                                 Page 11 of 200

Section 12

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 12 of 200

GENERAL COMMITTEE MEETING AGENDA                                                                  28 APRIL 2014

          S Ioydeonsiine                                                                                             |
                             row saceettn nenece

                   NC identified a number of ‘themes’ for priority focus in the Strategy. Through
                   consultation with Council, and review of current waste management practices and
                   available reports, specific tasks have been highlighted under each theme to guide
                   the development of waste management options for assessment.
                   The following section outlines each of the themes and identified tasks, drawing on
                   discussions, research, and a workshop with Council. The party (i.e. consultant) tasked
                   with the options development and assessment would be expected to prepare a
                   methodology for addressing each task {and any other tasks identified as critical to
                   the successful delivery of the Strategy), and selecting appropriate options for
                   appraisal.

                   2.1 Theme 1 Waste Avoidance
                   Identification and assessment of options to achieve improved waste avoidance
                   through community education and engagement
                   Background: Community engagement and education is an essential element in
                   providing understanding and support for improvements in the way waste is dealt
                   with, Community education can range from simply providing information on what
                   and how to recycle through to engaging with the community and business to tackle
                   the more difficult and important issue of waste avoidance. To tackle community
                   education on waste from the top of the waste hierarchy can provide a cost effective
                   outcome in reducing the volumes of waste collected, treated and disposed of and
                   extending the life of landfill.
                   Noosa has four distinct target areas for community education:
                      1. The general domestic ratepayer
                      2. Business and industry {in particular high volume generators such as
                         restaurants, aged care facilities and hospitals)
                      3. Construction and demolition industry
                      4. Tourist transient population
                   Presently Council engages EnviroCom (J Richards} to provide information via school-
                   based programmes on recycling and waste,

                    SS     Themes for Options Development | Lloyd Consulting

                                                                                                 Page 12 of 200

Section 13

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 13 of 200

GENERAL COMMITTEE MEETING AGENDA                                                           28 APRIL 2014

                                                                        S Hloydeonsyiin                           |
                                                                                          tecrewnectal amert
                  The community and business can be engaged in understanding and deciding on                      |
                  options for waste management improvement especially where there Is an additional
                  cost which would be imposed on the ratepayers. Residents are sometimes prepared
                  to pay for improved service if they understand the economic and environmental
                  benefits that will be achieved.
                  Behavioural change campaigns are often unsuccessful unless they are well resourced
                  and targeted. Community based social marketing techniques have been proven to be
                  successful in delivering behavioural change.
                  Education campaigns can be specifically aimed at the options that Council
                  determines are its priority. For example if Council wants to reduce the organic
                  stream to landfill this may become the initial focus of a comprehensive and cohesive
                  campaign. The “Love Food Hate Waste” successful campaign in the UK and in NSW
                  could be examined as a model.
                  The methods for funding education programs need to be examined, and their
                  respective implications. For example, should waste reduction education be partially
                  funded through the waste contractor, or from council revenue?
                  Possibilities should also be explored for collaboration at State Government and
                  regional levels to facilitate cost benefits through larger scale education programs
                  using media such as television, radio and publications.
                  2.1.1 Tasks
                  Identify and assess options to achieve improved waste avoidance and recycling
                  through community education and engagement. Options considered should draw on
                  models of successful community education and engagement campaigns both in
                  Australia and overseas.

                  2.2 Theme 2: Organic Waste
                  Identification and assessment of options for reduction of organic waste going to
                  landfill
                  Background: Green waste {i.e, garden materials) and food waste account for
                  approximately 50% {food waste: 27%; green waste: 22%) of the domestic waste
                  stream going to landfill In NC, No data Is presently available on the proportion of
                  commercial organic waste presently going to landfill.

                                        Lloyd Consulting | Themes for Options Development a

                                                                                           Page 13 of 200

Section 14

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 14 of 200

GENERAL COMMITTEE MEETING AGENDA                                                              28 APRIL 2014

          s lla         ad. ot i } S {} fi j i} ad
                     y             ing                                                                               |
                   NC offers a voluntary green waste collection service, with fortnightly collection of
                   240-1 wheelie bins for an annual fee of $75. To date, the service has had minimal
                   subscription (in excess of 3,000 households participating currently). There is no data
                   available for the number of households in NC area treating organic waste in-situ,
                   through home-composting systems. However, anecdotal evidence suggests a
                   reasonable level of home-composting activity in the region.      NC may give
                   consideration to a mandatory domestic collection service for green waste, possibly in
                   combination with food waste, in urban Council areas, if there was community
                   support and if a cost-benefit analysis proved beneficial. However, concerns have
                   been raised regarding the potential impact of a mandatory system on home
                   composting activity.
                  Sunshine Coast Regional Council conducted an organics collection trial in Peregian
                   Springs and Cooroy. The voluntary opt in trial was conducted on only single
                   occupancy residential properties in the new housing estate of Peregian Springs
                   (participation 251 households) and the established housing of Cooroy (participation
                   220 households). Approximately 20% participants opted out of the trial
                  A weekly collection of combined garden and food organics was undertaken.
                   Participants were provided with a 240 L green lid bin, an aerated kitchen tidy and 6
                   months’ supply of compostable bags.
                  Organics collection per delivered bin yielded:
                   *  9.5 kg per week Peregian Springs
                  *   6.2 kg per week in Cooroy.
                  Garden organics comprised between 85% and 92% of all materials collected in the
                  organics bin;
                   Waste made up between 7% and 15%, The detail of the trial results are in The
                  Sunshine Coast Organics Collection Trial Summary Report February 2012 — The
                  Organic Force.
                   If food waste were to be added to green waste and processed at the Eumundi landfill
                  a new environmental licence ERA 53 Composting and Soil Conditioner Manufacturing,
                  would be required. A purpose built facility would need to be readily and cost
                  effectively established.
                  It should be noted that NC intends to pursue @ technical review of various aspects of
                  the Eumundi Road Landfill, including assessing any discharge issue from existing
                  organic waste processing operations at the site. Options that may change these
                  operations could adversely or beneficially impact on a discharge issue.

                 a Themes for Options Development | Lloyd Consulting

                                                                                              Page 14 of 200

Section 15

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 15 of 200

GENERAL COMMITTEE MEETING AGENDA                                                             28 APRIL 2014

                                                                                                                    |

                                                                         ‘S Moydevisuline
                                                                                            evrvoeresial services

                  Presently Council has a contract with ARG on Eumundi Rd landfill! for the
                  processing/mulching of garden and wood waste. Negotiations are presently
                  underway for a 1 plus 3 year extension and this provides an opportunity for Council
                  to improve the present system. It is recommended that Council ensure flexibility in
                  any contracts entered Into as depending on the options that Council chooses
                  volumes of green waste may significantly increase and or the addition of food waste
                   processing may also be required.
                  Council’s Parks and Gardens purchase soil blends and mulches externally however
                   understanding their specific needs could allow this internal market to be supplied.
                  Also, presently, coarse mulch Is given free to ratepayers and fine double grind sold
                   for $20/m3. There Is no verification that the material has been pasteurised to ensure
                   that weed spread will not occur from the material. In negotiations with ARG options
                   for mulch and compost to meet AS 4454 (Composts soil conditioners and mulches)
                   and AS 4419 (Soils for Landscaping and Garden Use) should be pursued. This will give
                   greater confidence in the mulch material provided to ratepayers and improve
                   potential revenue by opening up more market opportunities.
                   2.2.1 Tasks
                   *  Identify and assess options for decreasing the domestic organic fraction (green
                      and kitchen) waste going to landfill, such as:
                      o   Raising awareness through targeted education campaigns.
                      ©   Extending the present voluntary green waste collection service, including the
                          option of including food waste. Both voluntary and mandatory options could
                          be examined. Where food and green waste are collected, appropriate
                          treatment options must also be considered.
                      ©   Increasing the rate of home composting/mulching and other at source
                          treatment processes for food and garden waste.
                   =  Identify and assess options for options for decreasing the amount of commercial
                      organic waste (larger point source generators including from major restaurant
                      precincts) going to landfill;
                   *  Identify and assess options for reducing Council-zenerated green waste sent to
                      landfill, and creating 2 soil amendment/compost product usable by Council staff
                      for parks, ete.; and
                   *  Identify and assess options for Increasing the standard and market for mulch
                      produced at Eumundi Road Landfill.

                                         Lloyd Consulting | Themes for Options Development Be

                                                                                             Page 15 of 200

Section 16

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 16 of 200

GENERAL COMMITTEE MEETING AGENDA                                                                  28 APRIL 2014

            Ss   llaydoonsus ine
                            excrewweta! sewens

                  2.3 Theme 3: Recycling
                  identification and Assessment of Options for improving Recycling Rates
                  Background: Over 20% of material in the average NC domestic waste bin could be
                  easily recycled using the existing recycling bin service. Council presently has In excess
                  of 25 000 weekly domestic waste collections at approximately 15kg per household
                  per week being collected and disposed in landfill, With 20% of the domestic waste
                  bin comprising recyclables, this equates to 75 tonnes of potentially recyclable
                  material being landfilled each week or almost 4000 tonnes a year.
                  No waste audit has occurred in Noosa of domestic recycling; however an audit at
                  Caloundra commissioned by SCC, Assessment of Comingled Recycling Segregation
                  ond Visual Method Development — May 2013 EnviroCom revealed only 65% of the
                  contents of the recycling bin could be recycled. Streams not recycled included 2% of
                  material which was bagged, 14% Glass fines <25mm 8% other fines <25mm.
                  An audit of commercial recycling bins Sunshine Coast Commercial Recycling
                  Assessment — January 2011 SCC (EnviroCom) showed a contamination rate of 6.57%,
                  and process loss rate of 18.68%. The predominant recyclable material categories
                  were: Recyclable Paper 56.3%, Corrugated Cardboard 33.3%, Newspaper 9.6% and
                  Magazines 7.5%.Materials which are potentially recyclable but are unable to be
                  recycled include glass fines, encased/bagged materials, and un-sortable material less
                  than 25mm in diameter.
                  Present commercial recycling services for Noosa Council are:
                  *   Commercial 240 litre Waste Bin — 4000
                  *   1.0m’ Bulk Bin -36
                  *   2m’ Bulk Bin—12
                  =   3m’ Bulk Bin - 214
                  *   Commercial 240 litre Recycling Bin — 1265
                  *   Bulk 1100 litre Recycling Bin — 254
                  (Note: These are services per week as some areas such as Hastings St and possibly
                  other areas have anything up to daily pickups).
                  Hastings Street and some other high-density commercial districts are constrained in
                  the ability to locate bins on-site, require multiple services, and have conflict with
                  nearby tourist accommodation from truck movements and the noise arising from
                  early morning collection services.

                          Themes for Options Development | Uoyd Consulting

                                                                                                 Page 16 of 200

Section 17

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 17 of 200

GENERAL COMMITTEE MEETING AGENDA                                                                 28 APRIL 2014

                                                                                                                       |

                                                                           S lloydoonsusine                            |

                   2.3.1 Tasks
                   For improving recycling rates including:
                   *  Identification and assessment of options for improved commercial recycling
                      including the opportunity for a “boutique” collection service in high volume areas
                      such as Hastings Street.
                   "  Options for decreasing the level of domestic recycling materials in the general
                      waste bin, and improving correct participation in domestic recycling service.

                   2.4 Theme 4: Commercial Waste
                   identification of options for management of commercial waste including review of
                   Council's collection service
                   Background: Traditionally Queensland Councils have a legislated obligation to
                   manage the collection and disposal of the residential domestic waste, Private
                   contractors usually are involved in providing waste collection services to the
                   commercial sector.
                   NC uses its contractor Cleanaway to undertake the commercial waste and recycling
                   operations.
                   NC has a monopoly in providing a commercial service but is coming under increasing
                   pressure to open up the commercial waste streams to the private operators.
                   Having a monopoly on the commercial system Council has an obligation to ensure it
                   Is operating at a best practice standard.
                   The provision of commercial waste services by private operators may have some
                   benefits for business. There could be potential for an increase in waste collection
                   truck movements with multiple providers in the market. Presently Council provides
                   an equivalent sized commercial recycling bin for every general waste bin serviced.
                   There could be an increase in business not participating in recycling due to cost.
                   This would need to be balanced by the standard of service council presently provides
                   in comparison to “best practice”. This could include the provision of waste avoidance
                   and reduction advice.
                   2.4.1 Tasks
                   Identify and assess potential arrangements for the provision of waste and recycling
                   services to the commercial sector in NC, with particular consideration for possible
                   financial/other impacts on Council of removing the control of the commercial waste
                   and recycling contracts from Council and allowing competition from private waste
                   contractors. Alternative arrangements should also focus on improving commercial
                   recycling rates and reducing overall waste quantities.
                                          Uoyd Consulting | Themes for Options Development ae

                                                                                                 Page 17 of 200

Section 18

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 18 of 200

GENERAL COMMITTEE MEETING AGENDA                                                                 28 APRIL 2014

                                                                                                                      |
            S Hloydeonsv/in                                                                                           |
                             eervoerntl fences:
                   2.5 Theme 5: Fees and Charges
                   Examination of options for alternative fees and charges structures
                   Background: NC provides a kerbside waste and recycling collection service to specific,
                   predominantly urban residential areas. Some 350 rural households do not receive a
                   kerbside service. Presently Council residents who do not receive a kerbside service
                   are not required to pay rates for waste management. However, the waste
                   management component of NC’s rates provides funding for the operation of three
                   transfer stations, the Eumundi Road Landfill, public place waste and recycling
                   services, street cleaning, the policing and enforcement of illegal dumping and
                   community education on waste reduction. All NC area residents benefit from these
                   facilities and activities, regardless of whether they receive a kerbside service, and
                   should contribute to their provision.
                   Previously NC levied a fee on rural properties not receiving a service and a disc was
                   provided which allowed a number of free visits to transfer stations.
                   For example, Gympie Regional Council applies an alternative waste charge in the
                   form of an annual $85 “Waste Management Charge” on all properties vacant and
                   developed. The charge Is collected to cover Council costs for capping and closure of
                   old landfills and upgrades or establishment of transfer stations. In addition,
                   properties not serviced by a kerbside collection pay an annual "Waste Management
                   Operations Charge" of $230.
                   Further, Council presently undercharges full cost disposal fees on the dumping of
                   small loads. NC is aware that gate fees charged for trailer loads of waste disposed of
                   at transfer stations do not cover the full cost for disposal.
                   Fees and charges should be equitable, based on the true cost of services provided
                   and encourage waste avoidance and recycling.
                   2.5.1 Tasks
                   *  Examine the present fees and charges as they relate to cost recovery and
                      equitability for the provision of the range of waste services.
                   *  Examine the use of benefitted rates areas for providing an increased level of
                      service to specific locations/customers.
                   *  Identify and assess options for alternative fees and charges structures, which
                      improve equitability across the NC population and promote waste avoidance and
                      recycling.

                ao Themes for Options Development | Lloyd Consulting

                                                                                                Page 18 of 200

Section 19

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 19 of 200

GENERAL COMMITTEE MEETING AGENDA                                                                  28 APRIL 2014

                                                                          S Iloydeosi ie                               |

                   3.1 Deliverables
                   NC is seeking a robust, documented process for the development of its Strategy,
                   which can be provided for Internal and public scrutiny. To this end, Council requires
                   the following deliverables for Part 1 of the Strategy development:
                   *  Along list of options addressing the themes and tasks identified by NC;
                   *  A short list of options (nominally three} to be assessed, which are selected in
                      consultation with Council {the process by which the short list is derived from the
                      long list must be clearly documented};
                   *  Aset of assessment criteria, agreed in consultation with Council;
                   *  Anassessment methodology approved by Council;
                   *  An Options Development report (draft followed by final version) documenting
                      the process and results of the Options Assessment including any significant
                       perceived risks and issues associated with options, and providing a thorough
                       description of the final preferred options selected by Council, including
                      justification for their inclusion in the Strategy.
                   The final Options Development report should provide sufficient detail to enable
                   Council to produce a Strategy document and Action Plan,

                                          Lloyd Consulting | Project Management and Delivery ue

                                                                                                 Page 19 of 200

Section 20

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 20 of 200

GENERAL COMMITTEE MEETING AGENDA                     28 APRIL 2014

   S Moyd

      3.2 Project Timeline

       02
      [2 ee]: NMEA bee             ee? lone) Bae          |
       eee eet eee}
       Ba
       OL       dl Ed   a a
       eer ae | ee | apr
       See      | ewe | econ [oe |
      Ee ernommanier, | Wendt Pet te W CO ne Se
       3 enero) Mae Men [eer Tiel          rm Tee         |
       ice      | ieee | lee oe eo ee pets oe le) ae |
        ee      | sa  ee |           Oe Sea. re ener
       Seer    2 YOU MO       PC           a            ae
       pen wanetnet | aeee: eee                          ee
               atk MO | eee       ae ee                  ee

     | = ie Management ard Delivery | Loyd Consulting   :

                                                     Page 20 of 200

Section 21

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 21 of 200

GENERAL COMMITTEE MEETING AGENDA                                                               28 APRIL 2014

                                                                           S Iloydeonsuiine
                                                                                             eurveesesal ances

                   3.3 Project Stakeholders
                   NC requires consultation and engagement with key stakeholders to develop the
                   waste strategy options. All members of the Noosa area community are impacted by
                   waste management, and should be offered the opportunity to take ownership of the
                   Strategy. Key stakeholders of the project include:
                   *  Council staff — both managerial and operational
                      (particularly Environmental Services, Waste Services, Civil Operations, Parks and
                      Roads, etc.);
                   =  Mayor and Councillors;
                   *  Residents (households};
                   *  Local businesses;
                   *  Community groups (i.e. community gerdens, Permaculture Noosa, Sporting and
                      recreational clubs, Noosa Residents Association, Noosa Biosphere, Noosa
                      integrated Catchment Association (NICA), charities and Brite Side Industries);
                   *  Neighbouring Councils; and
                   *  State and Federal Governments.

                   3.4 Project Reporting
                   NC wishes to remain involved in the Strategy development process, and ensure
                   consistent progress throughout the project. Monthly reports from the party tasked
                   with delivering Part 1 will provide an updated Project Schedule, if required, identify
                   issues to be resolved and highlight the achievement or delay of any key milestones.
                   Project progress reports will also outline learning’s / decisions made throughout the
                   Project and highlight any proposed changes to Project scope or deliverables.

                   3.1 Project Team
                   NC is seeking a suitable qualified professional {or organisation) to undertake Part 1
                   of the Strategy development. Applicants for the job must therefore provide evidence
                   of previous, relevant experience, a description of the qualifications for all personnel
                   who will be involved, and their respective roles in the proposed project team, as well
                   as the contact details for three referees.

                   3.2 Health, Safety, Environment and Community
                   Council has 2 commitment to attaining the highest standards in its health, safety,
                   environmental and community obligations. The selected consultant and its personnel
                   are obliged to comply with the Council's policies related to health, safety,
                   environment and community engagement at all times.

                                          Lloyd Consulting | Project Management and Delivery es)

                                                                                               Page 21 of 200

Section 22

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 22 of 200

GENERAL COMMITTEE MEETING AGENDA                                                              28 APRIL 2014

           Ss    lloyd consulting

                   4.1 New Audits and Reports
                   To assist the development of the required options additional information is
                   necessary and Council is undertaking or commissioning a number of parallel studies
                   prior or during the Options Development phase.
                   4.1.1 Waste Audit Programs
                   Undertake an audit of the waste stream of larger commercial generators. To include:
                   *  recycling participation rates; and
                   *  recycling volumes and content, especial ly glass
                   Undertake an audit of the domestic waste recycling stream:
                   *  Commercial and industrial waste stream {including high volume locations such as
                      hospitals, aged care facilities);
                   *  ‘Boutique’ precinct collections (e.g. Hastings Street restaurant precinct);
                   =  Domestic recycling stream.
                   4.1.2 Eumundi Rd Recycling & Disposal Facility Technical Review
                         & Improvement Program
                   Environmental monitoring of the site has indicated water quality Issues that have the
                   potential to impact on these environmental values. Further studies are required to
                   establish the cause of the water quality issues and to confirm the potential for
                   impacts to surrounding environmental values (to be undertaken in parallel with
                   strategy development).
                   *  Investigation of water quality issues at the site (general).
                   *  Investigation of water quality issues at the site {organic waste processing area},
                   *  Determination of environmental values surrounding the site (reference
                      document Fauna and Flora Study 2006 undertaken previously},
                   *  Address  water   quality issues  and  Transitional Environmental   Program
                      (stormwater  management} requirements based on environmental values
                      assessment.

                  hg Related Studies Reports and References | Lloyd Consulting

                                                                                              Page 22 of 200

Section 23

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 23 of 200

GENERAL COMMITTEE MEETING AGENDA                                                                28 APRIL 2014

                                                                                                                    |
                                                                           Ss  lloyd ONSUTT fg                      |
                                                                                           SOROLN semines

                  4.2 Existing Waste Audits and Background Information
                  =" Assessment of the Domestic Kerbside Waste Stream and Green Waste — January
                      and June 2012 SCRC (EnviroCom).
                  ®   Assessment of Comingled Recycling Segregation and Visual Method Development
                      May 2013 SCRC (EnviroCom).
                  *   Sunshine Coast Commercial Recycling Assessment — January 2011 SCRC
                      {EnviroCom).
                  *   Sunshine Coast Council — Organics Collection Trial 2011 (SCRC - The Organic Force
                      Johannes Biala).
                  *   Waste Collection Services Noosa - Summary Report 23 December 2013.
                  *   Population and Statistical Information for the Noosa Council Region, 28
                      November 2013. Queensland Treasury and Trade.

                  4.3 NC Waste Management Scoping Study May 2014
                  In January 2014, NC commissioned a scoping study review of existing waste
                  management operations. The Scoping Study report examined a number of issues as
                  listed below and made a series of recommendations for NC to consider. The report
                  contalns commercial in confidence material but will be made available to the
                  contractor under the terms of thelr engagement.
                   =  Review of all existing waste management documentation and assessment of
                      continulng relevance or established good practice.
                   *  Any technical inspections, analysis and recommendations with respect to
                      Eumundi Rd landfill site not limited to existing and new cells, water quality,
                      infrastructure etc.
                   *  Internal (Councillor and officer) consultation to capture ideas and feedback and
                      to support recommendations.
                   *  Review of education programmes and identification of opportunities for
                      improvement.
                   =  Review of partnering opportunities and identification of opportunities for
                      improvement with particular emphasis on Noosa Biosphere, community groups,
                      Queensland Parks and Wildlife Service and commercial retailers/operators.
                   *  Review and identification of grant funding opportunities.
                   *  Review and identification of opportunities for improvement in product offerings
                      (bin types and services).
                   *  Review and identification of opportunities for improvernent with respect to
                      Eumundi Rd landfill management practices.
                   *  Review and |dentification of opportunities of existing contract arrangements.
                   *" Review of best practice generally and possible opportunities for adoption in
                      Noosa.

                                   Lloyd Consulting | Related Studies Reports and References Eo

                                                                                               Page 23 of 200

Section 24

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 24 of 200

GENERAL COMMITTEE MEETING AGENDA                                                              28 APRIL 2014

          S Hayden sili
                            ctrevowerte! rernizes

                  4.4 Current Noosa Waste Facilities
                  The waste facilities servicing Noosa are:
                  *   Ringtail Creek Quarry located at Boreen Point Road
                  *   Pomona Transfer Station located at Pamona Kin Kin Road
                  *   Cooroy Transfer Station located at Mary River Road, Cooroy
                  *   Eumundi Road Landfill located at 561 Eumundi Road, Doonan
                  *   North Shore Transfer Station located at Teewah Beach Road, North Shore

                 es Related Studies Reports and References | Lloyd Consulting

                                                                                              Page 24 of 200

Section 25

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 25 of 200

GENERAL COMMITTEE MEETING AGENDA                                                     28 APRIL 2014

                                                                             S lloyd

                                                                         =       \

                                eh                                     ;              eet

                                                       Loyd Consulting | Related Studies Reports and References

                                                                                     Page 25 of 200

Section 26

GENERAL COMMITTEE MEETING AGENDA                                                 28 APRIL 2014


2.   PRE-RESPONSE REQUEST TO CHANGE CONDITIONS OF PLANNING &
     ENVIRONMENT COURT ORDER (318/2008) FOR A DEVELOPMENT PERMIT FOR A
     MATERIAL CHANGE OF USE FOR A RESOURCE BASED SPRING WATER BOTTLING
     PLANT (COOROY MOUNTAIN SPRING WATER) AT 314 COOROY  MOUNTAIN RD,
     COOROY MOUNTAIN

Author            Senior Development Planner, Denis Wallace
                  Planning & Infrastructure

Index             ECM/Application/132006.268.02

Attachments       1.   Locality Plan
                  2.   Court Approval for Spring Water Bottling Plant



 APPLICATION DETAILS

 Application Number:             132006.268.02

 Applicant:                      Cooroy Mountain Spring Water Pty Ltd

 Request Received Date:          4 March 2014

 Original Approval Type:         Planning & Environment Court Order 318 of 2008 for Material
                                 Change of Use – Resource Based Spring Water Bottling Plant

 Number of Submissions to        32
 Original Application:

 PROPERTY DETAILS

 Property Address:               314 Cooroy Mountain Rd Cooroy Mountain 4563

 RP Description:                 Lot 2 SP143409

 Land Area:                      48.17ha

 Existing Use of Land:           Bottling Plant/Detached House/Rural

 STATUTORY DETAILS

 SEQRP Designation:              Regional Landscape & Rural Production

 Planning Scheme:                The Noosa Plan

 Planning Locality:              Cooroy & Lake Macdonald Locality
                                 Rural Zone
 Planning Zone:

 Assessment Type:                Pre-Response Request      for   a     Permissible   Change   to
                                 Conditions of Approval




                                                                                Page 26 of 200

Section 27

GENERAL COMMITTEE MEETING AGENDA                                                  28 APRIL 2014



RECOMMENDATION

That Council agree in part to the pre-response request to change Planning & Environment Court
Order 318 of 2008 (Application No.132006.268.02), situated at 314 Cooroy Mountain Road,
Cooroy Mountain, in accordance with the following details:

A.   Agree to delete conditions 5B, 5G & 18B;

B.   Agree to change conditions 5C, 5E, 5F, 8, 9, 13 & 18A to read:

     5C.   Trucks attending the site must not exceed a total of 8 trucks per day and must not
           include B-Doubles.

     5E.   The hours of operation for the use are limited to 6:00am to 6:00pm Monday to Friday.

     5F.   A maximum of 12 staff (including drivers) are permitted on the premises during the
           hours of operation and are not permitted prior to 6:00am.

     8.    The existing site access shall be upgraded. The works must be undertaken as part of
           an Operational Works application and include the following:
           (a)     Design and construction generally in accordance with Council’s Standard
                   Drawing No SEQ R-056.
           (b)     The clearing of vegetation in the road reserve as described in the submitted
                   Traffic Impact Assessment prepared by RoadPro Development dated 11
                   December 2013.
           (c)     Any other clearing necessary to provide the “Safe Sight Distance” as indicated
                   on Council’s Standard Drawing No SEQ R-056.
           (d)     Additional signage in Cooroy Mountain Road warning of “Trucks Turning”. The
                   signage must be in accordance with the current edition of the Manual of
                   Uniform Traffic Control Devices Queensland.
                 The ongoing maintenance of the site access, associated clearing and signage is
                 the property owner’s responsibility.
     9.    The access driveway extending from the Cooroy Mountain Road frontage to the
           buildings must have a sealed surface and be maintained in good order.

     13.   A minimum of 13 uncovered carpark spaces shall be provided on site, including 1
           clearly defined disabled carpark space.

     18A. The design and construction of the on-site effluent disposal system and disposal area
          shall be in accordance with the Site and Soil Investigation for On-site Wastewater
          Treatment and Effluent Disposal prepared by Future-plus Environmental, dated
          November 2013, subject to the following requirements:
     (i)  Ongoing monitoring of treatment process and disposal areas shall be undertaken to
          ensure both are functioning effectively over time. They shall be undertaken generally
          as follows:
          •      Annual monitoring shall be undertaken from the time of commissioning to
                 determine the quality of the wastewater produced from the effluent treatment
                 system;
          •      Monitoring of the soils, vegetation and groundwater in the application area shall
                 be undertaken every three years to establish that such is not percolating into
                 the groundwater;


                                                                                  Page 27 of 200

Section 28

GENERAL COMMITTEE MEETING AGENDA                                                    28 APRIL 2014


             •      Sampling and testing shall be in accordance with relevant regulatory
                    requirements and manuals such as those provided by the Environmental
                    Protection Agency, with testing undertaken by an accredited Laboratory;
             •      Continuous monitoring shall be undertaken by the system for any water on the
                    surface of the application area, downslope resurfacing, changing plant growth
                    on or around the application area and any other signs of problems, and
                    addressed through maintenance or servicing.
             (vi) Washing plant, equipment or vehicles shall be undertaken off-site. If on-site
                    washing of any plant or equipment is necessary, all wastewater shall be
                    collected in a sump and disposed of off-site as trade waste by a registered
                    operator.
             (viii) Rehabilitation of the waterway of the site, as indicated by the 1997 Strategic
                    Plan (Open Space-Conservation & Waterway Protection) is to be undertaken in
                    addition to replanting as detailed in Drawing HJ0085.1.2 of the Conceptual Site-
                    Based Stormwater Management Plan.

C.     Refuse to change conditions 15 and 16;

D.     Include the following additional conditions:

       1.    The effluent holding tank and STP shall have visual and audible high level
             alarms systems installed with secondary power backup (e.g.: battery power);

       2.    The effluent facilities and grease trap facility shall be serviced and maintained on a
             three monthly service regime with all documentation for maintenance and servicing
             forwarded to Noosa Council.



REPORT

1.     Proposal
The applicant has requested Council provide a pre-request response notice to change conditions
of a Development Permit for a Material Change of Use for a Resource Based Bottling Plant
issued by the Planning & Environment Court. The proponent advises it wishes to significantly
reduce the scale of the approved operation and seeks changes to a number of the conditions that
attach to the Court Order (included as Attachment 2).
The applicant indicates the Cooroy Mountain Spring Water business will now operate as follows:
    Reduced operations from 5 days per week plus 5 Saturdays per year to 2 - 3 days per week;
    A reduced number of employees from 48 to approximately 3 - 4 staff (maximum of 10) and 3
     visitors at any one time;
    No longer manufacturing or distributing products for office water coolers;
    Reduced vehicle movements and access requirements due to the changes in manufacturing
     and hours of operation; and
    Changes to on-site effluent requirements as a result of the reduced number of employees
     and visitors.
The applicant originally sought changes to conditions 8, 9, 13, 15, 16, 18A & 18B in relation to
car parking, access relocation, development contributions and effluent treatment. During the
course of the assessment it also agreed to change conditions 5B, 5C, 5E, 5F & 5G relating to
truck movements, staff and operating hours and add two new effluent treatment conditions.



                                                                                    Page 28 of 200

Section 29

GENERAL COMMITTEE MEETING AGENDA                                                  28 APRIL 2014


2.   Background

A development approval for a Home Occupation (Bottling of Natural Spring Water) was granted
in September 1991 and since operated as Cooroy Mountain Spring Water. Over time, the
business expanded significantly.

In February 2006 an application was lodged for the Resource Based Spring Water Bottling Plant.
The use included on-site bottling and packaging of spring water from 3 bores and employed up to
60 people in peak periods. The associated factory on the site is approximately 3,000m2 in size.

During the public notification of the application 28 objections were received as well as 3 letters
and 1 petition with 264 signatures in support of the application. The objections were primarily
concerned with amenity impacts - that the use could be more appropriately located, lack of need,
excessive traffic and the use being inappropriate in a water supply catchment area.

Staff recommended the application be refused because the subject development was considered
likely to impact on the amenity of residents in the area and did not demonstrate sufficient
planning need to operate from the site to overcome the conflict with The Noosa Plan. Noosa
Council decided to approve the application and issued a development permit on 6 March 2008.
The applicant subsequently made representations to the development approval conditions.
Council agreed to some of the changes and issued a Negotiated Decision Notice.

On receipt of the decision, six submitters who objected to the development lodged an appeal to
the Planning and Environment Court (No. 314/08) that the application be refused. The applicant
(Cooroy Mountain Spring Water) also lodged a separate appeal to the Court seeking
amendments to Conditions 5 and 16 relating to hours of operation, vehicle movements and
roadworks contributions.

On 2 August 2010 the Court dismissed the submitters’ appeal after the applicant agreed to
include additional conditions on the approval and allowed in part the applicant’s appeal to amend
conditions of the approval. The decision, included as Attachment 2, represents the current
development approval.

Administrators were appointed for the Cooroy Mountain Spring Water companies in September
2011 and the operation ceased around August 2012. The new owner, who also owns Wimmers
Soft Drinks, purchased the company from the receivers in July 2013.

3.   Complaint History

The previous operation of Cooroy Mountain Spring Water had an extensive history of complaints
spanning almost 10 years. Generally speaking, the complaints began as the development
expanded from an approved home based business to a much more substantial commercial
operation and the majority related to traffic generation. The complaints resulted in various
breach actions by Council and also the lodgement of the application that led to the current
development approval.

4.   Statutory Process

The applicant advises it intends to request a permissible change to the development approval
under s369 of the Sustainable Planning Act 2009 and seeks Council’s pre-response prior to
making the application to the Court, as provided for under s368. A change to a development
approval can only be made where the change constitutes a ‘permissible change’ as defined in
s367.




                                                                                  Page 29 of 200

Section 30

GENERAL COMMITTEE MEETING AGENDA                                                       28 APRIL 2014


The proposed change to the development approval requested by the applicant is considered to
constitute a permissible change because:
     The change would not result in a substantially different development;
     The change would not trigger a new referral to the State Assessment and Referral Agency;
     The original application was impact assessable and the proposed changes would not likely
      cause a person to make a properly made submission because they relate to a reduction in
      the intensity of the development; and
     The changes do not involve prohibited development.
On this basis, the applicant is considered to be following the lawful process in making the
request.

5.    Assessment

Details and assessment of the requested changes to the existing conditions are provided below.

Condition 8 & 9 – Access Driveway

8.    The applicant shall relocate the existing site access to a location between 80 and 110
      metres east of the existing site access on Cooroy Mountain Road, to the reasonable
      satisfaction of Council. The intersection between Cooroy Mountain Road and the relocated
      site access shall be designed and constructed to provide safe turning areas for the vehicles
      likely to use the access. In this respect the intersection between Cooroy Mountain Road
      and the relocated access shall be designed and constructed in accordance with the
      most recent edition of the Department of Main Roads Road Planning and Design Manual
      and The Noosa Plan Planning Scheme Policy 5 Engineering Design Standards - Roads,
      Drainage and Earthworks. The redundant access (i.e. the existing access driveway) shall
      not be used for vehicular access. To ensure vehicular access via the redundant access
      does not occur, the redundant access point within the Cooroy Mountain Road reserve shall
      be revegetated in accordance with Council standards.

9     The relocated driveway from Cooroy Mountain Road to the car parking loading area shall
      be sealed, designed and constructed in accordance with AS/NZS2890.1-2004, AS2890.2-
      2002 and The Noosa Plan Planning Scheme Policy 5 Engineering Design Standards -
      Roads, Drainage and Earthworks. The relocated driveway shall be designed and
      constructed to grades that prevent vehicles from scraping and/or bottoming whilst also
      allowing pedestrians movements along the footpath without any step or level difference.
      Should any driveways be constructed to grades that do not comply with
      ASINZS2890.12004 and AS2890.2-2002, Council will require that the driveway be removed
      and reconstructed to levels that do comply.

Applicant’s Request

The [submitted] Traffic Impact Assessment prepared by RoadPro Development provides a new
assessment of the proposed operations and confirms that the required road access and vehicle
movements are minimal given the proposed reduction in operations (i.e. no distribution of water
coolers and reduced days of operation p/week).

Further, the location of the access driveway has been reviewed with consideration to the number
of vehicles accessing the site. Given that the existing driveway has been operating adequately
for a number of years, the location meets the Australian Standards requirements and there is
good sight visibility, low traffic volumes and the existing local driver awareness of this access, it is
considered appropriate to retain the driveway in its current location. On this basis, it is proposed


                                                                                       Page 30 of 200

Section 31

GENERAL COMMITTEE MEETING AGENDA                                                  28 APRIL 2014


that the existing site access be retained and that Conditions 8 and 9, which refer to a new site
access, be deleted.

Assessment

The proposed changes to the use significantly reduce the number of traffic movements (both
passenger and heavy vehicles) for the development. The submitted Traffic Impact Assessment
prepared by RoadPro Development has considered the current access in regard to the proposed
changes. The assessment includes recommendations regarding road side clearing and finds that
the current access is sufficient to cater for the proposed use.

Although the access is located in close proximity to the Lukes Road intersection, the number of
traffic movements is small and Council staff generally agree with the conclusions of the
assessment. It is recommended that Condition 8 be amended to permit the use of the existing
access and, in addition to the roadside clearing described in the traffic assessment, require that
suitable signage be provided advising of the potential for trucks turning into/from the site.

The existing access driveway from the Cooroy Mountain Road frontage to the buildings is sealed,
although it is in poor condition in parts and Condition 9 should be amended to ensure that the
access driveway is sealed and maintained.

Condition 13 – Carparking

13.   A minimum of 25 uncovered carpark spaces shall be provided on site, including 1 clearly
      defined disabled carpark space.

Applicant’s Request

The facility will operate with a maximum of 10 employees and a maximum of 3 visitors. As such,
it is requested that Condition 13 be reduced to require only 13 car spaces.

Assessment

It is agreed that the condition can be amended to reduce the carpark area to reflect the reduced
staff numbers.

Conditions 15 & 16 – Roadworks Contributions

15.   A contribution of $5,960 shall be paid to the Council towards the cost of improvements to
      the major road network of Cooroy, as a result of increase traffic generation caused
      by the proposed development. The contribution shall be paid to the Council prior to
      obtaining a Development Permit for Operational Works. This amount will be subject to
      variations in the Consumer Price Index, All Groups Brisbane from December 2007 until the
      date of payment.

16.   A contribution of $160,975 shall be paid to the Council towards the cost of improvements to
      Cooroy Mountain Road, as a result of increase traffic generation caused by the proposed
      development. The contribution shall be paid to the Council prior to obtaining a
      Development Permit for Operational Works. This amount will be subject to variations in the
      Consumer Price Index, All Groups Brisbane from December 2007 until the date of
      payment.




                                                                                  Page 31 of 200

Section 32

GENERAL COMMITTEE MEETING AGENDA                                                  28 APRIL 2014


Applicant’s Request

It is requested that a payment plan be implemented for the contributions outlined within
Conditions 15 and 16. As such, it is requested that the following notation be included:

       Payment of the applicable contributions outlined by Conditions 15 and 16 is to be made in
       accordance with the approved payment plan.

Assessment

The contributions associated with these conditions have been outstanding since 2008 when the
approval took effect. The company’s liability in this regard was evident at the time of the recent
purchase. Council has undertaken the road upgrades to Cooroy Mountain Road and it is not
considered appropriate to further delay payment of the contributions.

The requested change is not supported.

Condition 18A & 18 B – Effluent Treatment

18A. The design and construction of the on-site effluent disposal system and disposal area shall
     be in accordance with the Conceptual Effluent Treatment and Disposal Strategy prepared
     by Gilbert and Sutherland, dated November 2009, subject to the following requirements:
     (i)   Ongoing monitoring of treatment process and disposal areas shall be undertaken to
           ensure both are functioning effectively over time. They shall be undertaken generally
           as follows:
           •      Annual monitoring shall be undertaken from the time of commissioning to
                  determine the quality of the wastewater produced from the effluent treatment
                  system;
           •      Monitoring of the soils, vegetation and groundwater in the application area
                  shall be undertaken every three years to establish that such is not percolating
                  into the groundwater;
           •      Sampling and testing shall be in accordance with relevant regulatory
                  requirements and manuals such as those provided by the Environmental
                  Protection Agency, with testing undertaken by an accredited Laboratory;
           •      Continuous monitoring shall be undertaken by the system for any water on the
                  surface of the application area, downslope resurfacing, changing plant growth
                  on or around the application area and any other signs of problems, and
                  addressed through maintenance or servicing.
     (ii) A reserve disposal area 100% the size of the primary disposal area shall be
           nominated and located outside required buffer areas. The location shall be provided
           as part of the detailed design report at the Operational Works application stage.
     (iii) A minimum of secondary standard effluent treatment with disinfection to achieve the
           required microbiological quality (i.e. 200cfu/100ml with no sample over
           1000cfu/100ml mL) shall be adopted.
     (iv) Detailed MEDLI modelling shall be undertaken at the operational Works application
           stage to confirm the appropriate size for the effluent disposal area to ensure this is
           equal to plant uptake, soil storage and environmentally acceptable release rates.
     (v)          More information on the source/s and respective volumes of wastewater
           produced during bottling etc shall be provided in a detailed site-based stormwater
           management plan (SBSWMP) at the Operational Works application stage, including
           monitoring of actual wastewater production rates.
     (vi) Washing plant, equipment or vehicles shall be undertaken oft-site. If on-site washing
           of any plant or equipment is necessary, all wastewater shall be collected in a sump
           and disposed of oft-site as trade waste by a registered operator.



                                                                                  Page 32 of 200

Section 33

GENERAL COMMITTEE MEETING AGENDA                                                  28 APRIL 2014


      (vii) Additional monitoring of wastewater discharge at Outflow Point 1 (G & S drawing
             H J0085.1.7) is to be carried out to demonstrate compliance with the desired
             SVSWMP water quality objectives in support of an operational Works approval, and
             on an on-going month basis to demonstrate continued compliance with SBSWMP
             water quality objectives. This monitoring and assessment of the impact must be
             carried out compliance with the Ecoaccess operational policy "Wastewater
             Discharge to Queensland Waters".
      (viii) Rehabilitation of the waterway of the site, as indicated by the 1997 Strategic Plan
             (Open Space-Conservation & Waterway Protection) is to be undertaken in addition to
             replanting as detailed in Drawing HJ0085.1.2 of the Conceptual Site-Based
             Stormwater Management Plan.

18B. The Conceptual Effluent Treatment and Disposal Strategy prepared by Gilbert and
     Sutherland, dated October 2009 assumes a combined bottled/bulk water production
     volume of 24 ML/annum which produces 7.2 ML/annum of waste water. If the production
     rate increases over 24 ML/annum: additional settlement ponds, chemical treatment and
     flocculation is required in addition to those measures specified in the Conceptual Effluent
     Treatment and Disposal Strategy and condition 18A of this approval. These additional
     measures are to be achieved through larger {vertical) holding tanks and chemical dosing
     within the approved development footprint Erosion & Sediment Control

Applicant’s Request

Condition 18A refers to Effluent Disposal requirements, which will now be superseded by the Site
and Soil Investigation for On-site Wastewater Treatment and Effluent Disposal prepared by
Future-plus Environmental. This report addresses each provision within Condition 18A and
integrates the relevant requirements or changes, where applicable. As such, it is requested that
condition 18A be updated to reflect this new report and condition 18B be deleted.

Assessment

Council’s plumbing unit has reviewed the submitted effluent report and supports the proposed
changes, subject to the following additional requirements agreed with the applicant:

     The effluent holding tank and STP shall have visual and audible high level alarms
      systems installed with secondary power backup (e.g.: battery power).

     The effluent facilities and grease trap facility shall be serviced and maintained on a three
      monthly service regime with all documentation for maintenance and servicing forwarded to
      Noosa Council.

Conditions 5B & 5C – Truck Movements

5B.    Prior to the Council completing the staged upgrade works to Cooroy Mountain Road,
       weekly Trucks shall be limited as follows:
       (a) 40 water carrying trucks (namely all semi-trailers, tankers and other trucks carrying
             water but excluding B-Doubles) per week;
       (b) 20 ancillary trucks (namely non-articulated trucks and non-water carrying trucks).

5C.    After the Council has completed the staged upgrade works to Cooroy Mountain Road,
       weekly Trucks shall be limited as follows:
       (a) 50 water carrying trucks (namely all semi-trailers, tankers and other trucks carrying
             water but excluding B-Doubles) per week;
       (b) 25 ancillary trucks (namely non-articulated trucks and non-water carrying trucks).



                                                                                  Page 33 of 200

Section 34

GENERAL COMMITTEE MEETING AGENDA                                                   28 APRIL 2014


       Note: The road upgrade referred to is the upgrading of the remaining 2.2. kilometres of
       Cooroy Mountain Road to provide two (2) 3.5 metre wide traffic lanes with a 1.0 metre
       wide sealed shoulder to a total formation width of 9.0 metres. It is envisaged that the
       upgrade works to Cooroy Mountain Road will be completed in the financial year
       2012/2013.

Assessment

The road upgrade works are now generally complete and the applicant has agreed condition 5B
can be deleted and 5C simplified to reflect the reduced intensity of the use, with no more than 8
trucks a day now proposed.

Condition 5E – Hours of Operation

5E.   The hours of operation for the use are limited to:
          6:00am to 10:00pm Monday to Friday;
          8:00am to 5:00pm on no more than five (5) Saturdays per year, where production has
           been disrupted during the week due to breakdown.

Assessment

To reflect the reduced intensity of the use the applicant has agreed to amend this condition to
limit the hours to 6am to 6pm Monday to Friday only.

Condition 5F & 5G – Maximum Staff

5F.   A maximum number of 48 staff (including drivers) are permitted on the premises during the
      hours of operation and are not permitted to arrive at the premises prior to 6:00am except
      for:
          1 employee (maintenance worker) who is permitted to arrive at 5:00am Monday to
           Friday;
          1 employee (maintenance worker) who is permitted to arrive at 5:30am Monday to
           Friday; and
          8 employees (production workers) who are permitted to arrive at 5:45am Monday to
           Friday;

5G. Administrative staff will be relocated from the site by 31 October 2012 such that the
    maximum number of staff on site from that time forward will be 30, generally represented
    by 15 production workers, 7 semi-trailer drivers, 3 management staff (from time to time), 2
    ancillary truck drivers and 2 maintenance workers.

Assessment

To reflect the reduced intensity of the use the applicant has agreed to amend condition 5F to limit
the maximum number of staff on site to 12 (including drivers) from 6am only and to delete
condition 5G.




                                                                                   Page 34 of 200

Section 35

GENERAL COMMITTEE MEETING AGENDA                                               28 APRIL 2014


Consultation

External Consultation - Community & Stakeholder
Nil


Internal Consultation
Departments/Sections Consulted:

      Community Services                   X   Planning & Infrastructure
      Disaster Management & Public Order   X   Building & Plumbing Services
      Waste & Environmental Health         X   DA Planning
      Community Facilities                     Strategic Land Use Planning
      Cultural Facilities                      Asset Design & Investigations
                                               Asset Planning
                                               Civil Operations
                                               Environment

      Executive Office                         Corporate Services
      Community Engagement                     Finance
      Customer Service                         ICT
      Executive Support                        Procurement & Fleet
      Governance                               Property & Facilities
      Human Resources                          Revenue Services




                                                                               Page 35 of 200

Section 36

GENERAL COMMITTEE MEETING AGENDA             28 APRIL 2014


                                            ATTACHMENT 1
                            Locality Plan




                                             Page 36 of 200

GENERAL COMMITTEE MEETING AGENDA                                                                  28 APRIL 2014

                                                                                                     ATTACHMENT 1
                                                        Locality Plan

    SS        PO        a                      ee    ae                 4                                         Fe
 SMS | Nees See he                        BS       ed                                          <                  ae
          a             ye ees                 as | 6                                                                     ce
 i OE             ee a                         AEs,              |                            om.                      ee
       ee     Poe                ae   “     D.             “                                             *              hs
  ?    -       3,¢         Le ts a       Va) xa                 ~                                   _    a
| ee Be          RE        eee        -       dae           Aa                       >                               .    :
 Os ie SUP                    OR cas             A          lS     ay               :             -
‘       “eis    ris ae        a         :             a             A     F                    ae     E     ,    .         Lis
      rag                ae       hw Pe                  ae Spe              ae     ‘      =        a   |  we     4      We
          K A         Lae  ¥           aa                               as        =                7    '   ge         at  =
        . pes ‘  eo) i Jla                ” =       ’ “       ¥ ix         §             .    a     ;  .    oe   Qe    Sore:
          Pie       gaat     EE ||    —s                      ;                ha       ‘a     .     a.           Bi      r
      ot   une x         7)  #7 }                -      .        f       .                     =    A       o       .   “a
      Ps     ING ge           Bes )s        :           :            mst                        =        ce        a
      “6; ia   Nes,    4     ean     ere     Sey x               ‘   ye    Bat       fd             56         wae 3    a
       ae  Cro MO    a       ‘    .          PY      4 t    %    +      , z                             >      « . _ ‘ " nn
          .        ae gi   MS  te                     i                              ;                  > a           eR
 7 =         .     '              ®   \    4  Rl         \    . ¥    ~s           .   a af            , re     .
                   : P       2       3   + ;   P    .      =         ’              tas -              "                  '
 oa                                      Sy BE               ae                     Ge                MEIN
     2   Do   -   o we                      “     Xe    Nae       A         *                      :         -             fs
     ee              Fe       a         peas       N45 Se a          ‘         =>           age” lg Sy      ane
     eo”     bd rea             MEA             MS                  ee %                  aa. te.        Ee    “a   P< i
ane             if   mh,        ges  “A              i y        a  pee    a              t  J       is           a? 7  < +)
 ‘               MBE             id          SRN                ae      Se         RS                EP a
        s 2 5      oo    ys   abe. |           es,   ‘ %   Ng   4 M3 i tal f      ce .        fie    aw? oe.   - .    ia    .
   *       .         oo   Be 4  Ms              £        A    %        age    RY  A) *    w f ™.        —       Z a    a!
           rs              Ah           =         =   .   4     %    Pi   5 at 7      oon                   .     3      ae -
       ‘      ba            A        a       a” ae.       7       ~~ -     oF      oe}    5. 4 om   Re          ba       —
        i        ss         RS,              "    rm BR   1G    5: . t    uy  ae)        Maal 7 >                    a Ps
 bs                         a,           nf           i        e     i                        ei a Ws
se                         a                      F   os      ; 2       Sf     Op            aes      .     A           ‘
y              see      te       c                .        i}   et <a Fy         ‘ — i a         7     hs:           ¥ nt
             c +           .    3          ie   : sa      *    ~~  x r  : iB       aN s                              wy x
             Y          AST   kh   Yoo               “ts       5        ay                  :    op a                 eS

                                                                                                       Page 36 of 200

Section 37

GENERAL COMMITTEE MEETING AGENDA                                  28 APRIL 2014


                                                                 ATTACHMENT 2
                Court Approval for Spring Water Bottling Plant




                                                                  Page 37 of 200

Section 38

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 38 of 200

GENERAL COMMITTEE MEETING AGENDA                                         28 APRIL 2014

o          me to a ee Se                                                        a
             3.    there be liberty to apply.                               oe
              Filedon  Olo.    D6-   POs“
              Filed by:           Connor O’Meara Solicitors                   .
              Service address:    Level 5, 370 Queen Street, Brisbane 4000
              Phone:              (07) 3221 3033
              Fax:                (07) 3221 6661

                                                       Wy
                                                 fg xe Ka     5
                                                 oN,
                                                  Soe:

    a ee,
    aie at
  é mnfieg \3\
  o 7 <u ff
  Sr”

                                                                         Page 38 of 200

Section 39

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 39 of 200

GENERAL COMMITTEE MEETING AGENDA                                                           28 APRIL 2014

            eee                                    7     7              =   0s wo         _      .
 _                               Atlachyocent—$—
                     eer re              ae we                          _                             ———y

      1     APPLICATION DETAILS

       Application No:          2006/268
       Street address:          314 Cooroy Mountain Road, Cooroy Mountain
       Real property            Lot 2 SP 143409
       description:
       Planning Scheme:         The Noosa Plan
      2     RELEVANT PERIOD OF APPROVAL
      The relevant period for this Development Approval is identified in the Assessment Manager conditions
      3     ASSESSMENT MANAGER CONDITIONS
      Land Use
       1,   Development undertaken in accordance with this approval must generally comply with the approved
            plans of development. The approved plans are numbered SKO1 and SK02 dated 2 August 2010and
            as may be amended by these conditions.
       2.   The development must be undertaken and operated in a manner that causes no detrimental effect
            upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting
            nuisance or other emissions.
      Vehicle and Truck Movements
       3.   All vehicles associated with the use shall travel to the site via the western end of Cooroy Mountain
            Road.
       4,   =.
       5    -,
       5A.  Trucks are not to arrive at or leave the premises outside the hours of 7:00 am to 6:00pm Monday to
            Friday.
       58.  Prior to the Council completing the staged upgrade works to Cooroy Mountain Road, weekly Trucks
            shail be limited as follows:
            (a) 40 water carrying trucks (namely all semi-trailers, tankers and other trucks carrying water but
                excluding B-Doubles) per week;
            (b) 20 ancillary trucks (namely non-articulated trucks and non-water carrying trucks).
       5C.  After the Council has completed the staged upgrade works to Cooroy Mountain Road, weekly
            Trucks shall be limited as follows:
            (a) 50 water carrying trucks (namely all semi-trailers, tankers and other trucks carrying water but
                 excluding B-Doubles) per week:
            (b} 25 ancillary trucks (namely non-articulated trucks and non-water carrying trucks).
            Note: The road upgrade referred to is the upgrading of the remaining 2.2 kilometres of Cooroy
            Mountain Road to provide two (2) 3.5 metre wide traffic lanes with a 1.0 metre wide sealed shoulder
            to a total formation width of 9.0 metres. It is envisaged that the upgrade works to Cooroy Mountain |
            road will be completed in the financial year 2012/2013.
       5D.  Truck drivers will comply with the requirements of the “Truck Drivers Codé of Conduct" dated 2
            August 2010 which requires, amongst other things but is not limited to:

[RE Eom,                                                                                  10f8
Oe te

                                                                                          Page 39 of 200

Section 40

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 40 of 200

GENERAL COMMITTEE MEETING AGENDA                                                       28 APRIL 2014

           (a)  the use of engine/exhaust brakes along Topaz Street and Cooroy Mountain Road be
                prohibited except in case of an emergency (i.e. safety requirement);
           (b)  Maximum speed on Topaz Street and Cooroy Mountain Road to be 60 km/hr.
      Hours of operation
      5E.   The hours of operation for the use are limited to:
                *   6:00am to 10:00pm Monday to Friday;           :
                *   8:00am to 5:00pm on no more than five (5) Saturdays per year, where production has
                    been disrupted during the week due to breakdown.
      Maximum staff
      5F.   Amaximum number of 48 staff (including drivers) are permitted on the premises during the hours of
            operation and are not permitted to arrive at the premises prior to 6:00 am except for:
                *   1 employee (maintenance worker) who is permitted to afrive at $:00 am Monday to Friday:
                *   1 employee (maintenance worker) who is permitted to arrive at 5:30 am Monday to Friday:
                    and
                                                                                                +0
                 *  8 employees (production workers) who are permitted to arrive at 5:45 am Monday Friday. *”
      5G.   Administrative staff will be relocated from the site by 31 October 2012 such that the maximum
            number of staff on site from that time forward will be 30, generally represented by 15 production
            staff, 7 semi-trailer drivers, 3 management staff (from time to time), 2 ancillary truck drivers and 2
            maintenance workers.
      Home and office deliveries     :
      5H.     No home or office delivery staff or vehicles shall operate from the premises.
      Miscellaneous
      6.    Existing trees on the site and within road reserves are to be retained, except where required to be
            removed due to building operations or the conduct of the approved use. These landscape plans
            required to be submitted are to denote areas of existing vegetation or existing trees proposed or
            required to be retained.
      7.   Any advertising sign or device is to comply with Council's policies on advertising.
     Land Development
      Vehicle Access and Frontage works
      8.    The applicant shall relocate the existing site access to a location between 80 and 110 metres east
            of the existing site access on Cooroy Mountain Road, to the reasonable satisfaction of Council. The
            intersection between Cooroy Mountain Road and the relocated site access shall be designed and
            constructed to provide safe turning areas for the vehicles likely to use the access. In this respect the
            intersection between Cooroy Mountain Road and the relocated access shall be designed and
            constructed in accordance with the most recent edition of the Department of Main Roads Road
            Planning and Design Manual and The Noosa Plan Planning Scheme Policy 5 Engineering Design
            Standards - Roads, Orainage and Earthworks. The redundant access (ie. the existing access
            driveway) shall not be used for vehicular access. To ensure vehicular access via the redundant
            access does not occur, the redundant access point within the Cooroy Mountain Road reserve shall
            be revegetated in accordance with Council standards.
      9.    The relocated driveway from Cooroy Mountain Road to the car parking loading area shall be sealed,
            designed and constructed in accordance with AS/NZS 2890.1-2004, AS 2890.2-2002 and The
            Noosa Plan Planning Scheme Policy 5 Engineering Design Standards - Roads, Drainage and
            Earthworks. The relocated driveway shall be designed and constructed to grades that prevent
: ae .                     .                                                              2of 8
 ein    \eo

                                                                                       Page 40 of 200

Section 41

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 41 of 200

GENERAL COMMITTEE MEETING AGENDA                                                      28 APRIL 2014

                                  ener                               rree creer
         vehicles from scraping and/or bottoming whilst also allowing pedestrians movements along the
         footpath without any step or level difference. Should any driveways be constructed to grades that
         de not comply with AS/NZS 2890.1-2004 and AS 2890.2-2002, Council will require that the
         driveway be removed and reconstructed to levels that do comply.
    10.  All vehicles shail enter and leave the site in a forward direction.
    Loading Areas
    11.  Sealed loading and manoeuvring areas for the heavy vehicles shall be provided on site generally as
         shown on drawing number SK-01, dated 2 August 2010and shail comply with the requirements of
         AS 2890.2-2002 where applicable.
    Car Parking
    12.  A Sealed car parking area shall be provided on site generally as shown on drawing number SK-01,
          dated 2 August 2010 and shall comply with the requirements of AS/NZS 2890.1-2004 where
          applicable.
    13.   A minimum of 25 uncovered carpark spaces shall be provided on site, including 1 clearly defined
          disabled carpark space.
    14.   All carparking shall be kept, maintained and tine-marked in a condition fit for use.
    Roadworks Contributions
    15.   Acontribution of $5,960 shail be paid to the Council towards the cost of improvements to the major
          road network of Cooroy, as a@ result of increase traffic generation caused by the proposed
          development. The contribution shall be paid to the Council pnor to obtaining a Development Permit
          for Operational Works, This amount will be subject to variations in the Consumer Price Index, All
          Groups Brisbane from December 2007 until the date of payment.
    16. A contribution of $160,975 shall be paid to the Council towards the cost of improvements to Cooroy
          Mountain Road, as a result of increase traffic generation caused by the proposed development. The
          contribution shall be paid to the Council prior to obtaining a Development Permit for Operational
          Works. This amount will be subject to variations in the Consumer Price Index, Al! Groups Brisbane
          from December 2007 until the date of payment.
    Water Quality
     17.  The applicant shall submit a Water Management Plan for Council approval prior to the issue of any
          Operational Works Permit. The Water Management Plan shall be prepared by a suitably qualified
          Environmental Engineer and certified by a Registered Professional Engineer of Queensland
          The Water Management Plan shail detail water quantity and quality requirements of environments
          receiving runoff from the site. The Water Management Plan shall demonstrate that appropriate
          treatment measures will be incorporated into the proposed use to ensure the existing water quantity
          and water quality within environments receiving runoff from all aspects of the proposed use (i.e.
          including but not limited to effluent, carpark runoff and any by products of industrial use occurring on
          site) are maintained in accordance with The Noosa Plan and the Environmental Protection (Water)
          Policy 1997.
     Effluent Disposal
     18.  -,
     18A. The design and construction of the on-site effluent disposal system and disposal area shall be in
          accordance with the Conceptual Effiuent Treatment and Disposal Strategy prepared by Gilbert and
          Sutheriand, dated Geteber ek subject to the following requirements:
                          Hohe nr
          {i}       ongoing monitoring of treatment process and disposal areas shall be undertaken to
                   ensure both are functioning effectively over time. They shail be undertaken generally
                    as follows:                                                      .
    ae                                                                                  Jofé

                                                                                      Page 41 of 200

Section 42

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 42 of 200

GENERAL COMMITTEE MEETING AGENDA                                                       28 APRIL 2014

 T_T
                 *  Annual monitoring shall be undertaken from the time of commissioning to determine
                    the quality of the wastewater produced from the effluent treatment system;
                 * Monitoring of the soils, vegetation and groundwater in the application area shall be
                    undertaken every three years to establish that such is not percolating into the
                    groundwater;
   |             *  Sampling and testing shall be in accordance with relevant regulatory requirements and
                    manuals such as those provided by the Environmental Protection Agency, with testing
                    undertaken by an accredited Laboratory;
                 *  Continuous monitoring shall be undertaken by the system for any water on the surface
                    of the application area, downslope resurfacing, changing plant growth on or around
                    the application area and any other signs of problems, and addressed through
                    maintenance or servicing.
      (ii)       A reserve disposal area 100% the size of the primary disposal area shall be nominated
                 and located outside required buffer areas. The locatiori shal! be provided as part of the
                 detailed design report at the Operational Works application stage.
       (iit)     A minimum of secondary standard effluent treatment with disinfection to achieve the
                 required microbiological quality (i.e. 200 cfu/100 mL with no sample over 1000
                 cfu/100mL) shall be adopted.
       (iv)      Detailed MEDLI modelling shall be undertaken at the operational Works application stage
                 to confirm the appropriate size for the effluent disposal area to ensure this is equal to
                 plant uptake, soil storage and environmentally acceptable release rates.
       (v)       More information on the source/s and respective volumes of wastewater produced during
                 bottling etc shall be provided in a detailed site-based stormwater management plan
                 (SBSWMP) at the Operational Works application stage, including monitoring of actual
                 wastewater production rates.
       (vi)      Washing plant, equipment or vehicles shall be undertaken off-site. If on-site washing of
                 any plant or equipment is necessary, all wastewater shall be collected in a sump and
                 disposed of off-site as trade waste by a registered operator.
       (vii)     Additional monitoring of wastewater discharge et Outflow Point 1 (G & S drawing H
                 J0085.1.7)} is to be carried out to demonstrate compliance with the desired SVSVWMP
                 water quality objectives in support of an operational Works approval, and on an on-going month,
                 basis to demonstrate continued compliance with SBSWMP water quality objectives. This
                 monitoring and assessment of the impact must be carried out compliance with the
                 Ecoaccess operational policy “Wastewater Discharge to Queensland Waters”.
       (viii)    Rehabilitation of the waterway of the site, as indicated by the 1997 Strategic Plan (Open
                 Space-Conservation & Waterway Protection) is to be undertaken in addition to replanting
                 as detailed in Drawing H J0085.1.2 of the Conceptual Site-Based Stormwater
                 Management Plan.

    .                                                                                  4of8

                                                                                      Page 42 of 200

Section 43

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 43 of 200

GENERAL COMMITTEE MEETING AGENDA                                                       28 APRIL 2014

   RR     nen ener nn nn eennnnnen nnn eenenee nn nnn nencncncnnnccc cnn                          i,
    18B. The Conceptual Effivent Treatment and Disposal Strategy prepared by Gilbert and Sutherland,
         dated October 2009 assumes a combined bottied/bulk water production volume of 24 ML/annum,
         which produces 7.2 MLannum of waste water. If the production rate increases over 24 ML/annum,
         additional seitiement ponds, chemical treatment and flocculation is required in addition to those
         measures specified in the Conceptual Effluent Treatment and Disposal Strategy and condition 184
         of this approval, These additional measures are to be achieved through larger (vertical) holding
         tanks and chemical dosing within the approved development footprint. Erosion & Sediment
         Control                 .
    19.  Any person acting on this permit shall prevent erosion and sediment export from leaving the site.
         Site control measures such as silt fencing, controlled gravel access to the site and controlled
         disposal of waste, will be necessary.  In this regard plans detailing the methods of controlling
         erosion and sediment are required to be submitted to the Council for approval prior to obtaining a
         Development Permit for Operational Works.
    General
    20.  For the following classes of work associated with development, a Development Permit for
         Operational Works must be obtained prior to commencement of works relating to that class of work.
         The application may combine any or all of these classes of work:-
          °        Access and/or Carparking.
          .        Roadworks,
          °        Stormwater Drainage.
          °        Frontage Works.
          °        Erosion & Sediment Control
    21.  A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
          specifications for all engineering works that will become Council infrastructure, which shall be
          submitted in conjunction with an application for a Development Permit for Operational Works. In
          this regard a DXF/DWG file on GDA94 zone 56 grid of the proposed cadastre layout is to be
          submitted in conjunction with any application for Operational Works.
    22.   Digital detailed designs including drawings, calculations, specifications and a schedule of works,
          shall be submitted with any application for a Development Permit for Operational Works in respect
          of roadworks and stormwater drainage works. The design shall be in accordance with Council's
          Planning Scheme Policy PSPO5 — Engineering Design Standards - Roads, Drainage and
          Earthworks.  To avoid conflict with underground pipes or services, all existing and proposed
          services required by the development shall be shown on the plans.
    23.   To facilitate production of As Constructed drawings it is suggested that all design drawings are
          submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of
          ADAC are available at www.adac.com.au).
    24.   As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for
          design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of
          all services and structures. All of which shall be submitted to Council for checking and for Council's
          records,
          The data must fully detail levels for all engineering works including but not limited to drainage
          structures, finished ground levels and pavement surface levels. The data shall be submitted in the
          Asset Design and As Constructed (ADAC) digital format.   (Guidelines on the use of ADAC are
          available at www.adac.com.au},
          Approval of works shail not be granted until all As Constructed information has been supplied and
          accepted by Council.

                                                                                         5o0f8

                                                                                      Page 43 of 200

Section 44

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 44 of 200

GENERAL COMMITTEE MEETING AGENDA                                                         28 APRIL 2014

   Environmental Health
   25.   The developer must provide wasie storage and disposal facilities in accordance with Planning
         Scheme Policy No 9 “Waste Management Multi-Dwellings and Commercial and Industrial
         Premises”, including an external imperviously paved area correctly sized for all refuse and recycling
         containers and suitably screened from public places and neighbouring properties.      A roofed
         waste/bin wash area is required with a cold-water tap, hose and drain outlet connected to sewer, or
         approved wastewater disposal system via a bucket trap and grease arrestor,
   26.   The development must allow refuse-loading areas to be located off street. All vehicles associated
         with the collection of waste/recyclables, shall enter and leave the site in a forward direction, without
         the need for any unsafe maneuvering.
   27.   A Waste Management Plan (Operational) in accordance with Planning Scheme Policy No. 9
         “Waste Management Multi-Dwellings and Commercial and Industrial Premises", must be submitted
         for the day-to-day operation of the development and approved by Council's Health Section prior to
         issue of development permit for operational works.            .
         It is critical that waste areas are properly planned. A copy of Planning Scheme Policy No. 9
         explaining exactly how to predict waste quantities and design waste areas is available from Council
         and the web. The Plan shail include the following information: -
         °        The types of waste that will be generated from the activities approved within the
                  development,
         °        Estimated volumes or tonnage of both recyclables and waste generated.
         .        Methods to be used for dealing with garden waste.
         °        Initiatives to minimize waste either by waste prevention, reduction, re-use or recycling.
         .        Description of procedures for getting all waste to the bins; the storage of bins and the
                  collection of bins by the contractor.
         °        A description of the design details of waste storage and recycling areas including size,
                  focation, elevation and floor plan, methods of bin washing and system to prevent storm
                  water getting into sewer via the bin wash.
         °        A description of types and volume of waste storage containers to be used.
         .        The waste and recycling storage area shall include the provision of containers for all
                  waste and recycling materials including putresable matter, non-recycling waste, paper/
                | Cardboard, glass, aluminum/steel cans, waste oil, styrofoam boxes, etc, and bin washing
                  facilities connected to sewer.
          .       A detailed description of vehicular access to collect waste. Where collection is off street,
                   access must allow vehicles to enter and leave the site in a forward direction.
    28.  As no Plumbing Final has been issued through Noosa Council Plumbing Services, all existing
       _ plumbing and drainage, along with Backflow Prevention Devices, are to be assessed to ensure
         compliance with current Legislation and Acts.

    The approved plans and / or documents for this development approval are listed in the Assessment
    Manager conditions.
    5    ADVISORYNOTES                                                 i
    The following Advisory Notes are for information purposes only and do not form conditions of approval:

—                                                                                        6 of 8
 Ellin
NSE

                                                                                         Page 44 of 200

Section 45

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 45 of 200

GENERAL COMMITTEE MEETING AGENDA                                                         28 APRIL 2014

   1.   We advise ‘interested parties’ i.e. ‘developer’, ‘owner’, ‘tenant’ to consider their responsibilities
        under the Disability Discrimination Act (DDA) in regard to the installation of disabled access and the
         provision of disabled facilities, and that access to this building and the provision of sanitary facilities
         may need to comply with the requirements of Section D Part D3 and Section F Clause F2.4 of the
         Building Code of Australia,
   2.    Noise from building works associated with commercial and or industrial development should comply
        with the following —
         °        Limited to between 7:00am to 6:30pm Monday to Saturday.
         °        All reasonable measures are taken to minimise noise emissions.
         °        Not permitted on Sunday or public holidays.
   3.    In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint,
         cement, concrete, builder's waste or rubbish should not be permitted to enter or be placed where it °
         could reasonably be expected to move into a roadside gutter, storm water drain or a watercourse.
         On the spot fines apply for such offences.
   4.    The applicant is informed that payment via credit card transaction will not be an acceptable method
         of payment for development contributions conditioned in this permit or for infrastructure charge
         notices issued separately.
   Aboriginal Cultural Heritage Act 2003
    There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals
   pursuant to the Aboriginal! Cultural Heritage Act 2003 (ACH Act).
   The ACH Act establishes a cultural heritage duty of care which provides that: “A person who caries out
   an activity must take ali reasonable and practicable measures to ensure the activity does not harm
   Abonginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary
   penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be
    issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue
   stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural
 _  heritage value of Aboriginal cultural heritage.
    You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any obligations
    under the ACH Act.
    6  _ PROPERTYNOTES                                                                                   ns
    Not applicable
    7 _ PRELIMINARY APPROVAL OVERRIDING SCHEME
    Not applicable

x                                                                                         7of8

                                                                                        Page 45 of 200

Section 46

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 46 of 200

GENERAL COMMITTEE MEETING AGENDA                                                  28 APRIL 2014

  i
   8    FURTHER DEVELOPMENT PERMITS REQUIRED
    Type of Development Permit          Subject of the required Development Permit
   required                                                                      /
    Development Permit for Building Works All Building Works
    Development Permit for Operational  Access, Carparking, Roadworks, Stormwater Drainage,
   Works                                Frontage Works and Erosion and Sediment Control.
   9    SELF ASSESSABLE CODES                                 OB
   The developer must comply with the following codes for self-assessable development related to the
   development approved under this Decision Notice:                                         .
   Advertising Devices Code

                                                                                Sos

                                                                                  Page 46 of 200

Section 47

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 47 of 200

GENERAL COMMITTEE MEETING AGENDA                                            28 APRIL 2014

    .        |
             |                           .

             |                          Sto
                                             CooRoY
                                              y Sebi

                          |
                          |
                          t
                          i                                                            .

                                                           l=                      oo

                                                            1) T

x : ‘CooroY MOUNTAIN SPRING WATER FACTORY UPPER LEVEL PLAN          /™           SCALE 1:200 142)

                                                                           Page 47 of 200

Section 48

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 48 of 200

GENERAL COMMITTEE MEETING AGENDA                                        28 APRIL 2014

 —— vo re me were                  _                        a

            \          “a          CONCRETE SOM                           *
                  fo TTT                                                      ‘
                                   |

                                                                        Conroy

                     3              i.           Do                                 jf

 mM Ss                                                                         4
   <i                                 Ll                                     ®
  on™:  5S)                                            ~                     :
  ig. GOORSY/ MOUNTAIN SPRING WATER FACTORY — LOWER LEVEL PLAN     :       if SCALE 1200 1423
—_ Af

                                                                        Page 48 of 200

Section 49

GENERAL COMMITTEE MEETING AGENDA                                             28 APRIL 2014


3.   APPLICATION FOR AN EXTENSION TO RELEVANT PERIOD FOR 26 MULTIPLE
     DWELLING UNITS & AN ACCOMMODATION BUILDING FOR 12 UNITS, SITUATED AT
     27 ATTUNGA HEIGHTS, NOOSA HEADS

Author            Development Planner, Jack Lewis
                  Planning & Infrastructure

Index             ECM/ Application/ 132003.221199.3 & 142007.2555.04

Attachments       1.      Locality Plan
                  2.      Zone Map
                  3.      Approved Development Plans

 APPLICATION DETAILS

 Applicant                   David Neate C/- Innovative Planning Solutions

 Proposal                    Request to Extend the Relevant Period

 Properly Made Date          11 October 2013

 Original Approval Type         Development Permit for Material Change of Use for
                                 Multiple Dwelling Units (26 Dwelling Units) and
                                 Accommodation Building (12 Accommodation Units);
                                Development Permit for Operational Works for
                                 Landscaping, Drainage, Stormwater, Vegetation Clearing,
                                 Water & Sewerage, Earthworks, Access & Parking
 Number of Submissions for 32 properly made and 6 not properly made
 Original Application

 PROPERTY DETAILS

 Property Address            27 Attunga Heights NOOSA HEADS

 RP Description              Lot 27 RP 89506

 Land Area                   1.805 hectares

 Existing Use of Land        Detached House

 STATUTORY DETAILS

 SEQRP Designation           Urban Footprint

 Locality                    Noosa Heads

 Zone                        Open Space Conservation, Attached Housing and Detached
                             Housing

 Overlays                    Biodiversity Overlay (Environmental Protection), Natural
                             Hazards (Medium Bushfire), Natural Hazards (Landslide),
                             Natural Hazards (Low Potential Acid Sulfates)




                                                                             Page 49 of 200

Section 50

GENERAL COMMITTEE MEETING AGENDA                                                     28 APRIL 2014


RECOMMENDATION
That Council refuse the request to extend the relevant period for applications 132003.221199.3 &
142007.2555.04, situated at 27 Attunga Heights, Noosa Heads for the following reasons:

1.    The development is contrary to The Noosa Plan’s Overall and Specific Outcomes for the
      Noosa Heads Locality;

2.    The application was publicly notified in 2004 and given the time lapsed, the community is
      unlikely to be aware of the development approval; and

3.    The proposed development were it to be publicly notified today, is likely to receive
      submissions objecting to the development, given the significant non-compliance with The
      Noosa Plan.


REPORT
1. Proposal
The application seeks approval to extend the relevant period for a Development Permit for a
Material Change of Use (26 Multiple Dwelling units and an Accommodation Building for 12 units)
and associated Operational Works at 27 Attunga Heights, Noosa Heads for a further 2 years until
15 October 2015. The report is before Council, as the application is recommended for refusal.
2. Background
The application was first reported to Noosa Council on 9 March 2005, wherein officers
recommended refusal of the Material Change of Use application due to the scale of the
development, as well as the impacts on the site’s environmental and physical constraints.
Amended plans were lodged and reported to Council on 22 June 2005 with a recommendation
again for refusal. The amendments were relatively minor, including some increased setbacks to
the creek and amendments to the Accommodation Building to retain 3 mature hoop pines. On 18
July 2005, Noosa Council approved in part the Material Change of Use application for 30 multiple
dwelling units and an accommodation building of 12 units, as well as refusing the request to
reconfigure the lot into 2 lots. Council found the following grounds submitted by the applicant
sufficient to justify the decision despite the conflict with the planning scheme:-
1. The limited scale of the buildings, the proposed landscape/vegetation buffering will ensure
     that the proposed development will not be visually intrusive.
2.   The development integrates with minimal modification of the landform by buildings following
     existing contours, changing in level, suspended above ground surface, accesses following
     existing driveways, and minimisation of cut and fill platforms.
3.   The development integrates with the landscape by using predominantly native species,
     minimising clearing, using sympathetic building colours, locating access ways in cleared
     areas.
4.   The geotechnical report concludes that there will be a low to moderate risk of slope instability
     and that this risk is manageable by use of special construction techniques.
5.   The areas of the site for development support vegetation communities of only low to high
     levels of significance, with both communities highly disturbed, low in diversity, small in size
     with low connective values. Approximately 73 to 79% of the site is to remain as
     undeveloped open space.
6.   The level of development is consistent with the limitations of access in the area. With the
     applicant’s traffic consultant concluding that the impact of the proposal would be insignificant
     (below a 5% increase), except on Viewland Drive. The increase in traffic on Viewland Drive
     would be such that peak traffic flow would be less than 300 vehicles per day.


                                                                                    Page 50 of 200

Section 51

GENERAL COMMITTEE MEETING AGENDA                                                      28 APRIL 2014


Representations were made by the applicant to the conditions, with a negotiated decision issued
13 October 2005.
On 1 December 2005, Council received ‘notice’ that the application was being called in by the
then Minister for Local Government and Planning (Desley Boyle) to assess and decide the
application pursuant to section 3.6.6 of the Integrated Planning Act 1997. The Minister advised
that the application was ‘called-in’ as the development involved matters of state interest,
including a state wildlife corridor through the site, impact on wildlife habitat, the movement of
koalas, and the site contains remnant vegetation.
On 6 March, 2006, the Minister issued a Decision Notice for a Material Change of Use for 26
multiple dwelling units (21 x 3 bedrooms & 5 x 2 bedrooms) and an accommodation building
comprising 12 x 1 bedroom units.
On 17 October 2008, the Department of Natural Resources and Water issued a permit for the
clearing of native vegetation on the site. This permit was issued after the applicant undertook
vegetation offset planting on part of the adjacent Viridian site to offset the proposed clearing of
remnant vegetation on the subject site. The offset rehabilitation was completed and the covenant
established on the title. The clearing permit gave the applicant until the 15 October 2013 to clear
the subject site for the development.
On 21 April 2009, Council issued a Preliminary Approval for Operational Works – Drainage,
Stormwater, Vegetation Clearing, Water & Sewerage, Earthworks and Access & Parking. A
Preliminary Approval was issued because the payment of contributions and bonds were
outstanding. The payment of these is required before a Development Permit can be granted.
On 13 July 2009, Council extended the relevant approval of the Ministerial approval and the
associated Operational Works preliminary approval until the 15 October 2013, which was the
date the State’s vegetation clearing permit was to expire. This aligned the expiry date for all
approvals.
On 31 October 2013, the Department of State Development, Infrastructure and Planning agreed
to extend the relevant period for two (2) years to allow for clearing of vegetation on the site
associated with the development.
3. Assessment
The applicant requests an extension to the relevant periods for both the Material Change of Use
and Operational Works approvals for two years. The current landowner purchased the site three
years ago, after the previous owner went into receivership.
The applicant indicates that a revised, less dense and more sympathetic development is the
likely outcome that will be sought on the land. However, until such a revised outcome is applied
for, the extension of the current approval gives certainty in ensuring the development entitlement
for the site. The applicant indicates that due to the relatively short time for the current land owner
to act on the existing approvals, or finalise an alternative outcome, an extension is requested.
In accordance with Section 388 of the Sustainable Planning Act 2009, in deciding a request to
extend the relevant period, the assessment manager must only have regard to:
(a)   the consistency of the approval, including its conditions, with current laws and policies
      applying to the development, including, for example, the amount and type of infrastructure
      contributions, or infrastructure charges payable under an infrastructure charges schedule;
(b)   the community’s current awareness of the development approval;
(c)   whether, if the request were refused-
      (i)  further rights to make a submission may be available for a further development
           application; and
      (ii) the likely extent to which those rights may be exercised;
(d)   the views of any concurrence agency for the approval.


                                                                                     Page 51 of 200

Section 52

GENERAL COMMITTEE MEETING AGENDA                                                      28 APRIL 2014



The following provides an assessment against section 388 of the Act.

Consistency with The Noosa Plan & State Policies/Regulations

State Planning Policies
The applicable SPPs have been deemed by the Minister for Local Government and Planning as
being appropriately reflected in Council’s planning scheme and therefore do not warrant a
separate assessment. In addition, the recently adopted Single State Planning Policy does not
apply, as it came into effect after the application had entered the decision period.

South East Queensland Regional Plan
The site is located within the urban footprint of the South East Queensland Regional Plan. The
proposal is for urban development within the footprint and is consistent with the regional land use
intent, regional policies and desired regional outcomes.

South East Queensland Koala Conservation State Planning Regulatory Provisions
The site is located outside of the Koala Assessable Development Area and does not warrant
assessment against the regulatory provisions.

The Noosa Plan
The application was lodged and assessed under the Superseded Planning Scheme and The
Noosa Hill Development Control Plan. The provisions of the Superseded Scheme and The
Noosa Plan are not dissimilar. The Noosa Plan includes the 1.8ha site in a number of zones,
including the Detached Housing (2,481m2), Attached Housing (2,068m2) and Open Space
Conservation (1.34ha) zones (see Attachment 1 – Zone Map).

An assessment of the approved development against the key technical provisions of The Noosa
Plan is outlined below:

Criteria    Existing Approval         The Noosa Plan                                   Complie
                                                                                       s
Density     - 21 x 3 bed units        Attached Housing (2,068m2) – 160/ha (33)
              (69.3)                  Detached Housing (2,481m2) - 3.3/600m2
            - 5 x 2 bed units (12)    (13.2)
            - 12 x 1 bed units        Total = 46.2 persons                                X
              (16.8)
            Total = 98.1 persons

Height      Units – 4 storeys/12m Attached     Housing         (2,068m2)     –    3
            Lodge         –      3 storeys/12m                                            X
            storeys/10m            Detached    Housing         (2,481m2)     –    2
                                   storeys/8m

Gross       5,000m2 approx            Attached Housing (2,068m2) – 1,320m2
Floor                                 Detached Housing (2,481m2) – N/A                    X
Area

Site        2,835m2 (83%)*            Attached Housing (2,068m2) – 827m2 (40%)
Cover                                 Detached Housing (2,481m2) – 992m2                  X
                                      (40%)
* Applicable only to the developable area of the site




                                                                                   Page 52 of 200

Section 53

GENERAL COMMITTEE MEETING AGENDA                                                   28 APRIL 2014


The existing approval does not comply with key Noosa Plan requirements relating to density,
height, gross floor area and site cover. Furthermore, the proposal extends substantially beyond
the developable areas identified by The Noosa Plan zone map, into parts of the site designated
Open Space Conservation. This area has significant environmental values and is mapped by the
Biodiversity Overlay for Environmental Protection, given the area includes remnant vegetation.

The proposed development also fails to adequately protect the environmental values and
functions of the creek and its riparian vegetation, given the minimal setbacks to the creek and the
substantial earthworks likely to be required for the approved development. The development
generally west of the creek is also not considered appropriate, given the steep slopes and the
significance of the vegetation. The buildings intrude into the recommended setback of 10m to the
creek, and basement car parks are proposed into parts of the very steep site, requiring
substantial earthworks and clearing to construct the development.

It is recognised that there is some development potential off Attunga Heights, which includes the
existing dwelling on the site and contains more moderate slopes. However, any development in
this area should be of a scale and density consistent with existing and permitted development in
the street, which are predominantly duplexes.

The existing Material Change of Use and associated Operational Works approvals do not meet
the outcomes sought by The Noosa Plan, resulting in inappropriate development impacting on
the site’s environmental and physical constraints.

Infrastructure Charges
Under the provisions of the existing approval, infrastructure contributions have not been required
for the following relevant networks:

          Stormwater; and
          Public Transport

These networks are now applicable to the proposed development. In accordance with the
position adopted by Noosa Council on 6 February 2014, an infrastructure agreement is required
to secure the additional charges for these networks so that the approval remains consistent with
current laws and policies applying to the development (total of $60,336). These charges are
additional to the infrastructure contributions and/or charges required under the provisions of the
existing approval.

If the proposal were to be approved the applicant would need to enter into an infrastructure
agreement to pay for the missing networks. The total amount required to be paid would be
$621,417 (CPI Dec 2013).

Community’s Current Awareness of the Development, Rights to Submit and Likelihood of
Further Submissions

The original application was publicly notified in 2004 and approved in 2006 by Ministerial call in.
Thirty-two properly made submissions were made during the public notification period.

Since the application was approved, the Noosa Outrigger Resort (Viridian) has been constructed
adjacent to the subject site comprising a total of 192 visitor accommodation units in 11 separate
buildings with associated restaurant and conference facilities. The resort development is located
on the eastern side of the valley, and overlooks the currently vegetated hillside, which makes up
the subject site.

Although an existing access easement (in favour of the subject site) traverses the Outrigger
Resort site, many of the new unit owners are likely to be unaware of the extent of the existing

                                                                                   Page 53 of 200

Section 54

GENERAL COMMITTEE MEETING AGENDA                                                    28 APRIL 2014


development approval on the adjoining site. Residents also in Attunga Heights and opposite the
public walkway are likely to be similarly unaware, with almost 10 years lapsing since the original
notification period. It is likely that further adverse submissions would be received from residents
of these surrounding properties given the proposed development does not comply with The
Noosa Plan provisions and results in significant clearing.

As a result, the proposed extension does not meet the community awareness test for extending
the approval under Section 388c) of the Sustainable Planning Act 2009 and is likely to attract
submissions opposing the development.

Concurrence Agencies
There were no concurrence agencies applicable to the Material Change of Use application.
However, it is noted that the Department of State Development, Infrastructure and Planning
agreed to extend the relevant period for two years, to allow for clearing of vegetation on the site
associated with the development.
4. Conclusion
In deciding a request for an extension to the relevant period, an assessment has been made
against section 388 of the Sustainable Planning Act 2009. The assessment has found that the
development is inconsistent with The Noosa Plan and the community is unlikely to be aware of
the proposal given the time elapsed since public notification, with further submissions likely to be
made against the proposal.
Consultation
External Consultation - Community & Stakeholder

On 31 October 2013, the Department of State Development, Infrastructure and Planning agreed
to extend the relevant period for two (2) years to allow for clearing of vegetation on the site
associated with the development.
Internal Consultation

Departments/Sections Consulted:

   Community Services                          x   Planning & Infrastructure
   Disaster Management & Public Order              Building & Plumbing Services
   Waste & Environmental Health                x   DA Planning
   Community Facilities                            Strategic Land Use Planning
   Cultural Facilities                             Asset Design & Investigations
                                                   Asset Planning
                                                   Civil Operations
                                                   Environment

   Executive Office                                Corporate Services
   Community Engagement                            Finance
   Customer Service                                ICT
   Executive Support                               Procurement & Fleet
   Governance                                      Property & Facilities
   Human Resources                                 Revenue Services




                                                                                   Page 54 of 200

Section 55

GENERAL COMMITTEE MEETING AGENDA    28 APRIL 2014



                                   ATTACHMENT 1
Locality Plan




                                    Page 55 of 200

2 |         5                                                                                                                                                               2
 oS         =                                                                                                                                                                9
 N           za                                                                                                                                                              nN
 —_         Lu                                                                                                                                                               5
 o          =                                                                                                                                                                .
 =
 Oo.        x                                                                                                                                                                Te)
 <x         g           SNS,                                                                                                                                                 ®
                    aces \ CS
 eo                SS    \AL                                                                                                                                                 S
 WN         e     “ASO
             KE    Ee                                                                                                                                                        a

                  Is] T—7—
                  LY  [2 Tserc
                   ,    SRS
                   Shay pel Sista CK x SS
                    Lo) ee]       OSI        KES
                   ay — posit i r/R  Sapir AR
                  sf    KS Soe V YAY
                   TN   PATO  OEY SZ  E  wy\ Sy                    °
                   ac rs {   1 SBS. L fh      Fo                                              :
                    Sy & PRBS 7 yt                                                           EAT
                    PSkest |of [Sho IN /aT2                                                    Sr
                    Hh  bo] J Tey    Nf   \a  Z                                          /     ol
                   BALM al WN ERR        =                                   ornare ,    \   45h
                  <LI      palsy                                        [ 2   RSSE           pS
                   SS FEF |      1 ek.                                    A tars 0   :       Ba
                      NS Fg     =    WYO                ana      =    ~ SL SSN           RAB
                     %  SRE   ET Sa OAD ro              1   EIS OSA LRN                 NY  Yay j
                    Sig NGI, E=BILE|\m gag, \            SSUES ACY Y                 LF   este f
                       NZ  NP  MORM  CRS SS       Ne a oO              a            ‘e/a hi]
                    &  DSS     ,   Lg Lee             RAR      woh eRe              SS LETS
                    e  ROW   [So pelS ee         Slap       (OOO Le               a A      $24)
 <x                    BY got) IF SSA Se 7         SY       SN SONU              (IY AIT)
                        mS   Saat ett / gt         a          oro             ~~    CTH
 o                   who] PIs S/ 3 ¥                   5                      By      Cats psy
 ci                         [AeaR ee a                 gORSA           Tae       A eterna =
                     ys     Aeibnns za!                ow                         af        J
                    -      SE era rs) of               2?              [SAIS  fel Fa ass 4
 O                  iy       OSPR YU                   ae              |    NY (S ] aygues Po
                    x         Ss                     <<               im     LETT oo) PTR
 q                  i      ris                 | SFY          ~ =      eS           SO ea
                                               So} | Be.        VS BLS)       a2naty      SS
                                                      on | |    SSC EIIAIRAD So Ae
 oO                eA        c                     Si_st \ Pao, \ VL Ue Pie Si)
 =a                mod Oe                             ao \\\ St   eet         TET io dat
                   Les) LORS                          NS  NS rt            PR  TR TH Hl on|
 -                ot OH [ee =k Sh                        3 UG    S/o aS            SSeS
Lu                A 8) OB Ret Sebo!)                     NSS  eI Syek      s Ey ess
                   a Go) SO3 Ry  ST         EL!             LU Pa eA SG     Sad —Lsagl PA)
uu                {SU SQ sah Ry]                             “Xt BN Ailf wm s_ | foe a CT EY
 =                £ SF ol 44 ae S|                     4,      C3) Ie  =      eo
                  emf xf peend Ld Ai                     5,                  =
 Ww               Dd tS     Gas                           S4 DR                          eh ae
                  Rint LIne eo      ‘                 +   -  ——=prbe    M,C      OMe oS WS) /e] Ie
uu                ect RSet  YS             een                  RRP       fo _ Sa Zep  Re  BLS
 -                YB, (oe               Reo \ig        y    ay Jase     5 Une       8         \
 -                   fey tp 8 [Oy      PSV SY [ary      >    “tit AVvA  8 Arey - RAIA \
                   1 Part    Ve              ac    ee     oS,             Wve         ARIE     \
 S                dj [AA __/e          Pe BNE x                   LaNs    ASS     AGAR SAL
                  ig        (ag        ACA      BA           .     a ETS | oN NEL RIS
                  q |       /          rT \V"\o\ XS                oar   rt 2    ZAM ears
 =                ; i   d   ‘          Co         47“ |       \   wa \ Mok] PYSexose        >_<. xs
 Oo                 |   =   "          Me SX exe \ ¥ ‘\          ae   \ { a Ly rH   ay   << nie
                    1       A            et  \ =   | in)            —\\_ Ar    Mel Oey KA
 O              ©          ay            cS Kot A (3               4 ze) (APSA MA              x
               &   (Saee e                DA \“o kB) oN          be    aot]     ret CR So      f
 x             a = & > ||       ;    AN     in \   a) } aN        = easly a Be me Ped Pah
oc              Se    INT TI   can ty            SSS  aan         FO    alley | aS  ip tn /2/ —~
                = PS ad        An \ XR           1 -Tal &          pin (Se! Siar] A      Cf pe:
 Ww            re CoS          or   Ys        Any)  ah th yy             AS Pay yy   tty     Peg
 z              ce              a)      CI       | lea                 el    BE    we        NJ
                  w              OS ) G3                               a         pi    oN      ey)
Lu              Se              Lo\  Bac                           1   tetany       -        S
                oO}.             Ca\  MUS SS           “Ss          \  iF                    an]
 OS            ol ey             Loe  at    i) pis     7 ca\ ayn       tA  a!                 Ni} |

Section 56

GENERAL COMMITTEE MEETING AGENDA    28 APRIL 2014


                                   ATTACHMENT 2
Zone Map




                                    Page 56 of 200

GENERAL COMMITTEE MEETING AGENDA                                                                                                                       28 APRIL 2014

                                                                                                                                                   ATTACHMENT 2
Zone Map

     > ,                                      C                                                                               zzxe.
\@ © ps                                                A                                                                  a      4      no       & o
     yy         ¢                                                                                                                          po 2       ees
  aR            3                                                                                                                                          i
i’           -                                                                               H                                                             ;
4         oe            a                      pam m                              Pi         4
       ‘            ”                        by  al |                                      i Be                    ]                       »—    Legend           .
    os           hijee.          ,                y                                         PAR        m   %                               we =  Zones - Noosa
4                   oa                            A                                                     bs &                                                        i
iy                        >    |      [subject site                                                        ail                                     BB Attached Housing
              je       mie    mi                   \                                                       4   ie  Nh                              || Business Centre
         Ae             :                        |                                                  EIR   aha     ay                                           a
         ‘e                                                                               f   rd               Ps                                       Community Services
                           5        f           i                                                                                           $           Detached Housing
              .    2          |                 y                                                                  ss                              Oo   Industry
                     et                                                                                                                                 Neighbourhood Centre
                  oo                         ;                                                                       By
              : a : n                                                                                                                              A Open Space Conservation
              ci                                   -                                                                 \                                  Open Space Recreation
               A         ;                                                                                           z
            ' i                                                                                                                                    i Rural
            }                       SN
           4                        ia                        &                                                 >           %                      Hl rural settioment
                                   A                        Ly                                                ae %
                                   =    t                                                              . XS % %                                    M0) semi-attached Housing
           7                     .                                 4                                  Be  =    “
             =                              4 |                                                           oi   %                                  | | Shire Business Centre
            i               _ a       J    i        p     a         “                                        a                                          Village Mix
          1 j             (              aM a                                                                 }                                    || Visitor Mixed Use
                                        Ne a ~      oe   —                  Sid on                                                                  ————————
Pf       A               Ps       ea         <r     ae     4                   es a                       5       bi
      \ Bi                e        i       re ]     Ae =                             0                                                                              Pr
       a                       rr            ft         aA                                ~

                                                                                                                                                       Page 56 of 200

Section 57

GENERAL COMMITTEE MEETING AGENDA    28 APRIL 2014


                                   ATTACHMENT 3
Approved Site Plan




                                    Page 57 of 200

a
 =         oe)
 co        <                                                                                               Ss                                                                                         S
 a | 2
  So
 N         -                                                                                  Se                   a                                                                                  N
           E                                                                oe                                                                                   a                                    3
 =         Ww
 o         =                                                           b                                                        ES                                12                                Ls
           <                                                                                                        ae                                           AMENDMENTS
 e                                                        J                                                                    5                                  oo                                   ;
                                                                                                                                   |                                  | REWER TOWN PLANE |
                                                  .              <~             BAYVIEW                       o                C3     ewe                         ! an    —T                           o
                                                   =     oR AG)                  ~DEVELOPUENT             6929                     i                                a                                 Oo.
                                                           aS                        tem              eo    S&S                                                      Sa
                                                  *                                                                                  |                                  ——
                                                  =                                                       .                                                       x femme        i
                  |                                     &                                 fy                   f        kA                                         —
                                                  em     Rs                                                               oy en  =    ~~                           c,
                                                           Lae                                            &            .           |  —                            —          be ay ma
                   |                                  Ee \\    Oe                                     of               4 ef                                        Seieseerererem
                                                             aR LEAS) ~                             ©                -  £                                          a   Ran aan
                                                    .           b>                                                                                                    ee
                                                      a       Oa Gs                 2                                                                             (et pe BT SME oy
                                                hy      OS     nN  Cay S   er  SS                                                                                  SESE ms
                                                 \    .    —F =e           ——         ZS                                                                           feeeramevoemsa sense scns
                                                                                      ee                        J)                                                    ae
                                                                    Laas     eee       2 ee         sa   | wlalalale                                                 ecb
                                                            _t         Eee pe ieee                                                                                 By    ehh cae
                                                              :             Fe                 a                                                                    eee bos Ute
                                                                                  SC a                                                                              Ae rare ae
                                                                                   .                                                                                 Pt ena eet Ps
                                                                                       "><                                                                          CaS  Ane  iceis (8)
 <                                                                                                                                                                    HR a    IY
Lu                                                                                                                                                                   ARC       A
 z                                        DRAWING INDEX                                                                                                              JooM
                                                                                                                                                                         HITEC
 2                 |                       DA.0000 LOCALITY PLAN & DRAWING INDEX                    SCHEDULE OF AREAS                                                 a ve
                                                                                 ¥                                                                                       Shem
 6                                         Dagon,  STERN                        tment tengn          __                                                              SS
 Qa                                                SITE SETOUT PLAN - PARTA     1   AY 1:10                     BASEMENT                  ooo                        Grek: nee inc-atebcon
 Zz                                        ee      SE Rae                       tags!   0 gs         a                                                               aa nies
 -                                         toes    SETOUT PUN SITE SETBAK           aN eos               a                    =          _                           @err
Lu                                             06  SETOUT PLAN BASENENT         {BOB At 1500 AS     CASNTIPEA   oraworigon          Oe                              ee ORONT
Lu                                         DA-1001 GENERAL ARRANGEM             1200@A1_ 1:400 @AS                ene                                               solomon haitaae nenoanet
 Ss                                         DA-1002 GENERALAR   ENT -LODGE - BASEMENT 1:1            _—               "$s                                          spore tina ome nramce
                                           DA-1003  a cipintrtlit poee Bh nn ae 4   AY 1:200@A3      CABIN TYPES.             1880" oe                             Fetes a are wectrtn
 Ww                                         DA-1004 GENERA     MENT - LODGE - FIRST : At 1:200 @A3              GROUND FLOOR              Soe                             SCTE LD PTY
tu                                          DA3001 SITE SECTIONS - SEC          ‘10041 120063                 ss            —<—-                                 joss  HARDING
                                                        | ARRANGEMENT - CABINS  a4  Al 1-200 @A3                PAST FLGOR     It
 -                                          oo     ae secTONs- SECTIONS S87     1:250@A1 1:500 @A3   CABIN TYPE C GROUND FLOOR _—__ ae _ e                       {=   HARDING RESORT
                                          . DA.             + SECTIONS 1,2,3/    .                     —_—___a_
 =             c                                     SECTIONS - SECTIONS B,C    1250@ A! 4500 @A3               mast sigan     te             ~                   vm   apo
 =            &                                                                  500@ At 1:1000@A3              a" —_-                                                 SEEN" a
 S            a                                                                                       sa                                                          ae
 Oo            ®                                                                                     COVERED CRCULATION        =          400"                 -  [mn  978      —
 o            5                                                                                       someones                                                      am
 a            ~                                                                                     sree                                                         je    rans
at            9                                                                                      <<                                                           sour _1:200068 441 #:40008 AS
 a             o                                                                                     CARPARKING                            otK                              ——
 Wi            >                                                                                                               cars                               an   _aee
 5             9                                                                                              ee                                                     ™ LOCAL PAW
 Ww            2                                                                                                                               -                      COVER SHEET
                                                                                                                                                                  nee 978 DAGOOO
 o            <                                        — _                                a                                                                       we   «OK
                                                                                                                             a                                    recor 2/03/2008
                                                                                                                                                            ae        DEVELOPMENT APPROVAL

Section 58

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 58 of 200

GENERAL COMMITTEE MEETING AGENDA                       28 APRIL 2014

                          @   Alp | \Sey/
    G      374           7 | hoe ame     j ju
    ae Le Hit                   eal”.
|   OGRE RHEE     2  PF  fe      AR                        |
                  a8    Hah ERS RN So
    GP            BD     WD Ogee                           |
          baal of a egg               TP                   |
          ne            AS RE NS OTB
      Hh   | i          SESS MSR
      po   HE           PO     ES    Rae
                     RIO      ee et Rt   +O}              i
                     ides. Se        2%
                   y ee       ay tae f
                     eoohiay    gy He  )
                     SR        EGA gas
                    Fy iD a Laas ay      Qi
                    28  fe         AREY | ag
                     EW Ae
                        KEN AIN hi
                         SSR                             ,
                        KW                       Se
                         6 RSS
                         Re  A SSN                Crs
                     Zz 10 HRS      [0              Cy
                         < \e             e
                           ae ye
                    €   (ESERIES                       Es
 |                           SHY i                        ¢
                          _ Re         AIS
                             AY gis
                            CRY.       |
                           o>  jo jo   |
  ij) po    hi}    Be 3    “fo         ms   eevee  ae sea ida
 ge       UE ©) pao          imma =)  Bea Huei irpar weve
 Baln/s| gale lg els jsiplg lg talOlaew i | [gee Ten il naan
ali     ae  ee   ae Al flan 8 "allt 3: z| Peevey |)! i AUG Al i
     EU          Meb    Lee
 }         : 2 |  8 | ai     zara} 2 >| is ei il baer

                                                       Page 58 of 200

Section 59

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 59 of 200

=                                                                                                                                                                           8
 Oo
a                                                                                                                                                                           -
=                                                                                                                                                                           °
o                                                                              U7                 se                                                                        9
 xq                                                                         L 2                      ‘\                                                                     ¢
a                                                                        <                             e                                                                    &
                                                                       a                            =                fen wen done ae
                                                                                7
                                                                      <           S                             .       -       soz       Be
                     i           ————                          we ay                            SS                  “Gs eee                            den
              Ua      <a.              | a                                         aan          era                TA aaa
                        a       a citi gu] savers UL          al          -         IN          ‘                   ALS Sti        eS ice coh
                   Y>»          Al a ie i i if 5 a       nnn           Y            eh                             Aish H iy  VS Kaa XN Ly Da’ .
                    eee)          Alc        <                        -              Boa            4              Any    SS Ved PA ee
                   Ke  Soe» Zn             5    ~*~                 KK               ,             f              oe       Se La a        Lag
                    INGE               A \        ees                Oo"*K,          Se           LoS Oe!                    PRE         AS
                   4  Sr@tesa              Kee See                          Cres Sal eee eee                                fp     VX            ANE
                é            ees            v              ico             Wiss Sh Smee                     ae        Sh                     ES
                 eS        eS       \       &              1       gore ae    eal \ J | i , I | ‘aad 1 f    as             =  ena        -7 - <5
                 ry        |          SNe                 Sea              er       TUM rol                        +           ne                      .
           .        \      | ng         >       tea WH                Ni Ca ise Cea CE a                                                          7
              ‘      ‘S ===   Feet y          a    "     me   We 44) i ‘|  or SS th Pee                  IE i if y       Pm                _ 7 -"
               \                             oe     WS                    NESS       Roe     eC      eee      ee) |
                                   a BS                                WM aa         Cas eS                  Je)
                              we                                oe           ies    ies eae                  pat
                                                       ™         |           —_——                             Cee
                     Se ae                           ve                        —     are aren ieee             a          10m from centre line of intermittent creek to
                    Dutbding face, © ‘Only canieringbstconies to 50m setback line from Edgar | bot prownd carpark        ~~ ~~
<         —~ — stmaana | __Protude into 10m setback zone. Gonet mateg Lhe Soot ig Rater basement lve! or carport ayout \       ~
a                            TTS    = = = =~           Ringe em cna tomate
z                                                      10m rom centre ine of termitentereekto =     ee
 Ww                                                   building face. Only cantliveringbalconies to            «*           TT rrr.
6                    ——————_________                   rote into 10m setback zone.               .                                          =
<q                   i ee                                           TP
                                                                              ee           —————————————___ *                  ae
6                                               oe                              a |                             “>
za               Legend                                                                                i.
E                 10m rone from centre ine of interment creek
ud              4
              rT       L Asea® indicating minor constructor activity
-             1a Elevated timber decking and structure.
E                     a     constructed rouns
=             rT] sean nn Sse Treo Sgn me
              ee Proposed Retaining Wall
Oo
O         em                        eee               eee oe                                                        eee
cr         a                         SS                                         BE            sc      8 |     WaRoNeResomr |Our                     £
 Ww        =                         oa            [a                            DCN SMO      |escserscne|| awn eomamam  |   _‘oopag [PP om  onns   i
©          * | Gan | Gk wecmen mean se          _   ecinene tectememee wares  —                                             e——————_ OT

Section 60

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 60 of 200

vr
 ql                                                                                                                                                             S
 rr
                                                                                                                                                                N
 =                                                                                                                                                              -
 =                                  a                                               a                                                    ee                     °
 <                                                  !              =                                                          =                                 8
 <                      Uy                     $e                                                                              ——-                              3
                                                    pe            TS,                                                         ~            aor
 N                      TWH PEELS LR                                       PER                                                 *Sae|armenenen fe                ©
                         | ih  PSP SE Sf FOLD ES NDE Ff fae £R                                                                tates                             o
                         Uf og OES BE PERE PE INS by oy                                                                        rr
                         Ee ES & Zé Jf A fe . és 9g . v Z ay, Gr         Me  55h                                                          ee
                        OE LES FF Saf fOF 6 Of a                  al  an FB,                                                   Fr
                        if OP SM oF YS ff          Aw Y     Roy Ix.  o    7 || | fy                     LO                     eel   “s
                         ELA MELE EE            SE bi  of      lls Vee                                ’                        See
                        wt               woe fe fora                + LODGE yar]  !  -  fi  we  Sess igcressessscrayeraey         bh ae    “fo

 S                          8 OK RR                      OL                                       i                              Spat ese
 Ww                      a”      eo ae J a fgPG i                       (Q ‘ Ps                   !                           “@ermon
                         ot  Oe          DS? FS TY oe                g     4    f                 '                             wousinor tun Sor reco
 -        |              eal x      ry    “    ’     ©) =    un     i AL                                                         HARDING
 Ww                                               ns <> Sane                                                                  =  HARDING RESORT. _
 =                                                                                                                            om ATUNGA HEIGHTS:
                                                                                                                                  mennees
 uu                                   :                                                                                        eee LOTI7 RP eee
 F                                                                    PRELIMINARY ONLY                                        -   *____.
 =                          Z kenses                                     FOR DISCUSSION PURPOSES ONLY                         on  JULY 2005
 Ss                             10m zone from centre bine of ininrmmtent creo                                                 sean 1:200@ At / 1:400@ A3
 oO                            200s ar retered 10 by Candlion 8 of NSC Decision Notice _~ pro-ceeeeles                        wm  MA   tent MA
                            [771 Devetonment Ares" indicating major constructon activity
 oO                         FA See ey secon nner csneion ets                eee bol ene             1                        “ors SETOUT LAN -PARTC
 2                          UA aaa                                        ata                      !
co                          Fi) cwmme nae cena nt ercce                        So                                            samen 978 DADO
 z                         r] tenga meas oy go                           CHE een ames                                         os: (+*<K
 o                         Gs Proposed Retaining Wal               —___                                                       — 210312006
                                                      a                a                                                        DEVELOPMENT APPROVAL

Section 61

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 61 of 200

GENERAL COMMITTEE MEETING AGENDA                               28 APRIL 2014

    |                                                  <)
                                                             |
                                                       Uf     [IE
  a                                                      4       |
  i                                 a                           ||
  z                           we a      Swern                 allt
                                  a                           if
                          ]           fpr!                 oe
                         ‘           of Sr
                      _@#           fof     73        i // ee iy
     i        penne              /s     PS,       “ax      ay i
     i        f       ;       pa        ES                       el |
     hs       oY            fy       os      Co       AL ee
     :        Hod          yoy             ad           7 ee
     eee             Eh        Be        oo                e ah,
     !       on               /       o                   ven
  poi          of                   a                |    wy,
  at    . . ee fis                    eae                 7 7
 wae -- geese ve   y——~-Laae a       ' : eth   a)         | — :
           ad     -    BY   7,       4  es ee Sal       ey
     i        ie o oo zl             [* a F ; sorry.        =      |
     if       iy          7     P    Shea Ry
     Ho Pe ed         oy’     4      Dey maul bya tae)   ay
     t,    Tih:      2               aS
     rf   hae   PR i ‘,              i Blea  si iy)        |
     i    | opel                   Bae           ae     OL
          Bae  Lol                 = Pelee pea eects ce   Capa om
     (eB                           3 iets ce                aad |
     '         =                     See                    bf iT
     ince                              ey ies               ik
          [erated                    ea     at         SE L/) a a
          al                         pee                     reo
           —                         ZS
                                    a,                |     Rae
         :                            le he               (Ea
                                    ete Hee etek Th.  a         Lt
                                      ee ai                 |
 gl |      ;                HB a   Tye ec] Reese)  [TER ial      Fie
 del|2)  sal ig els einige (siMOVieas =)   pee (HMI i eykeeeeeters
 z    2]  BF    le] |iltela lz Pe all a]   Beem aE
 z    3    e|, |3   5/88   etidets & || teltty: Repent Hei int ae
 :       cal i        se       Eee:
 :       BPP) | | fe Ay    |     ei c=]   a           Fa      oa
 e                                        Rear 7 i py:  4       ; ia

                                                              Page 61 of 200

Section 62

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 62 of 200

GENERAL COMMITTEE MEETING AGENDA                               28 APRIL 2014

                                               8
            if                       psieey HEF   hr 7]
                                       ay          ae
                              LTS Ky J ep   a7         Py

                ' See ROR SA S aT [ts                 y wey
                    SS             Mj          Upp. Beue
       ; —                       SD        7 Mog
  :     al               ( / i          f. ee,
  fOt- 4 |          i ! | eet tee
        RUS OS       fi   I        as aie Nets Part sacra
        Ba      > SSS ae       ‘LJ )              AURAL aN eo IE
   &- eB EN -      SS = chs   | td -        :      :  —
         lt tk                                    ee ein |
                ——         LO Sof                 oe ee ae
                areet           OK                arse          |
                ~Aa?                                          or
                ‘—_=—                     3        weap seits Wp: ei
              {|                          5        fee eT (ah
             WS it... ft                  ‘        LS A figs
                               :                  EO fle
                                                  Yeas:
                                                  Cal

    i       PER PE       eT,              peewee | 3ijHiiipl 11h
 fo                       | oars)         ae HAA          abe
      o|  SRT eel SERRE [tute e (bat is | Reaaeaey fet    TTT)
      de] GRE)      AEE          aE =)    BRE a           He
 :         eit |g      a]  3     ssiielg 23 | Beware) |= Hf   aE
          gels é     e |§  ae    Hei o>   ie fy i          La  Pel

                                                               Page 62 of 200

Section 63

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 63 of 200

vr
 ql                                                                                                                                                                        3
 S
 5                                                                                                                                                                         x
 x                                                                                                                                                                         °
                                                                           ns                         ————————————                                                         ©
 <                                                                                   SS See                                                                                ©
                             ogre                                                    \)    v   HY         —-                     AMENOMENTS
 N                                                   =      PA   =                  Lo   a                rath        oe          (eae mumrerent                           >
                                        Lh                                       he        gp                          1          ==                                       é
                                         Se fe              [oo             ip      |   IH N          |                            lene | eeieorenes fn
                                       eee                  TE           Le                                 =|
                                   Dn    ae       > Bel li    ———P        Sa        is                                                ee
                                             y                  ~Y          7           7  TANT 7/          Y         WD          re
                                                               OH         mee                                                     Sree
                                                                                                                                   Seti Cote newb te
                          oe                                                                                                      Soe     meen
                         | BEAUTY SALON <p                                  Sara Le A Pa                                 =         Smorap in ramen wore nee
                         '        =f.                                       eid tee   EY BY eee              ln      a rar                a
                         {        Ef                                     eS             po)   at    = try)   Ess   ithe Stes        ee ee
                       '      ~ fA n.      7.)                           we      =e pn      loi    aremicita wy eS a HL ieee        ASE es aes H
                oR     aes       ~~ D>.                                 eae              see       Ba       ean        sila fa     ee eae
                        : ==        Cp    .                           Bi gee aa aA = OY ee reer eck      + —— ter aS           ;   r get ea CRS fp
                ~       : &, C       g LAr                                 ee       ic     Viena Sea                   Oe ELE i pelea        cid
                          >       sey       ~<-./                     fe     b Pike eae UO      ee eR             mE rag JA
                          “ PS     Sf ee        / {/                                               NORTH ELEVATION                  ARCHITECTS
 <x                      / i 3)  im     )   4      f                                                                                QWEENSLAWO PTY LTD
 Q                        wy    Sel           hp  . by                                                                             Zo tam Sony ame O10 AT
                            x GY {4 J a Hy i       Leer Uy, Yj yer                                                                  MOREE faTA THe Tae
 g                               Op     Z        fs a [Ka a                                                                          (6) comrmeon
 o                          a      Ye              SO    eR PO ON |        UE 7             ae                                   | SARs
                                       ‘      |        Oe                          Oo fs                                           =
 =                                     Ty              >: .       iH   a <P —he © fe       RES                                       —"
                                          9 ~    ~ >     XS           :  ‘  :        Cy       Si                                 oon  HARDING
uJ                                                 "Sn    ~s)     ‘      ‘  hee} | . (ay      van
 TT}                                                  wv      Nas     i      ore    Bey   woe    La-----,                         =  HARDING RESORT
                                                                 es                        PT           |                             SNE”
 S                                                              S53 De    Ba BE        7         |      \                         ore ATUNGAMOGHTE
 wi                                       pnt       renee enn rtteg   ‘                     A =        :                          more
 i                                        '                     CA Ne                     1, =     iis |                          mer GOT sr arses
 Ee                                                                                         O% 8 0 J '                            ma  $78
 E                     ¢ ; ast noone                                                      my                                     on  JULY 2005
 =                                                                                     ‘ae                                        mse 11200883
 S                                        :                             on             BALL            I                          ato
 oO                                       hee een ana nen ewww ened         }....--..... oe                                           LODGE - FIRST
 a                                                                          ;                                                        GEN. ARRANGEMENT
 <                                                                                                    e                               ee
ui                                                                2         |                                                     a
 z                                                                                                                                =?
 O                                                                                                                              [ __ DEVELOPMENT APPROVA! | APPROVAL

Section 64

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 64 of 200

a
 =                                                                                                                                                                                                    °
 o                                                                                                                                                                                                     So
 nN                                                                                                                                                                                                   ~
 =                                                                                                                                                                                                     °o
 a                                                                                          '                                                                                                          t+
 o                                  6                                   P=                  ‘                  6                                 .                                                    o
 =                              cn, a                      __..     Pa                                                                                      ene                                        o
                         =   rT)   mo    Ty                ‘ers rT] mao        TH                                                                         ee                                          a
                         ae        a        1              '   oH        4           i                                                                    [stm [meres ex entire |
                           is      YY       :              '   =         iL          |                                                                   fone bcm Ie
                       SiZeu0)                    = (BEBO).                                                          |                                    See
                       Kh} je     0:                           J:   |e BI      |:                     |                                                  Serene
                            isle)         rege             '      hae a. ——_ eal                      ————47        ——                                  toieqrnenennnecme Bonen
                       »                                   aaa | | camel                               ————                                              See
                              ill    '                            i a            ---4                  —S3 |        —         --                         Nes Roosters sien
                                    &                             uaeenn dy                          —=6                      .      :                     oe         .
                                                                                                                                                        satan mney
                        CABIN TYPE C                         CABIN TYPE C                         CABIN TYPE C                                          (ne ton Demo enenes Sonar
                        GROUND FLOOR                         FIRST FLOOR                          LOFT FLOOR
                        3 BEDROOM UNIT                       3 BEDROOM UNIT                       3 BEDROOM UNIT                                         Sear era a
                                    &                                                                          @                                         ie site
                                     ;                                 o-¥--> _           :                                                               shee    pases oy
                                       Opal                       ,~ Te      omit ->                                                                      Paice      ccs
                             —      oi   L_                       ——      of       4                                                                      rach ats Gahy me pra
                             Ce                                       | BS                                                        Tin
                             i     Bk      lJ                      H     wis       ]                                               :
 <                      Wzeo)|                               Wem                               Soe                                Ales                     ee
                          aa                a                     aL       i   ~ NY               — 4                                      = -             ARCHITECTS
                        !            i                        Has          i                      ===                                      “—TT            SeSeaborasee
 Qo                        i a            FG                    i aye          pack                  —                             TT      lh              ink asia
 2                         UTE         ee | hi                  Woe ME LL         itt”               —————_                       P|       fe              HSSUTRE vous 716 110
 ©                                  6                                     &                                    &                       TYPICAL SECTION     © common
                                     '                                     '                                   i
 <                     CABIN TYPE B                         CABIN TYPE 8                  ;      CABIN TYPE B                                             cours ecnerssn reece
  oO                    GROUND FLOOR                         FIRST FLOOR                         LOFT FLOOR                                              remo nearer
 2                     END UNIT                              END UNIT                             END UNIT
 -                                                                                                                                                      we  HARDING
 Ld                                                                                                             >                                       a» _ HARDING RESORT
 Ww                                 °                                   8.                                     :                                        ~ =.
 =                                         |                            fl     iH                                                                           NOOSA HEADS —— OLD
                                  7 on                            ae A i                                                                                    ee
 wi                             ELI     AL                      wf     wali  Sar                                                                        cunt, ‘wernwuns
                              H——   iofs) =                       ‘       oS}      | |                                                                  —
 Lu                          {i     So       0                      Ty    Sis      T]                                          :       .                an   978
 K                                 N ‘                            1      8 ‘         ’                                                                 on   JULY 2005
 S                           Ld             \                     ey       -   "5 -                          <7                                         waz  -T1OO@AN/1:200@A3
                              ES                                  {cS                '                        Hitt |                                                  aD
 =                            a)     i                            : a      i         '                          r |                                .    cme  WA   oecxes IVA
                                 |                                 te   =      7                       bey                                               res* CABINS
                                  7  .      7                    y      i... hoe”                      ——_—-        —
  oO                            i |       ry                     al |    ect | i                       ——-            =                                     GEN, ARRANGEMENT
 —_                           Pat                                  ‘BAN nee    ue--4                   —            —
 x                                 "8                              _                                 —=                                                     oa
or                                                                                                                                                    - |omm 58 Dao
ui                     ea                                     ay                                  cn                                                    _
                                                                              :                   CABIN TYPE
 Ww                     MIDDLE UNIT                           MIDOLE UNIT                         MIDOLE UNIT                                         [mom 2709208       |
 S                                                                                                                                                             PMENT APPROVAL

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.