Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2014-04-28 General Committee Meeting Agenda Pages 1-64

of 64

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA   28 APRIL 2014




                                   Page 11 of 200

GENERAL COMMITTEE MEETING AGENDA                                                                  28 APRIL 2014

                                                                           S Iloydeoisiiine
                                                                                              eeireacnrety series

                   To ensure an effective and measured (fact-based) development of the Strategy, NC
                   has requested a two-part process:
                   Part 1 (Options Development)
                   *  Identification and assessment of waste management options (i.e. waste practices,
                      policies and activities), Including cost benefit analysis, to deliver Strategy goals
                   =  Council and community consultation/consideration of options
                   Part 2 (Waste Strategy and Action Plan)
                   *  Development of agreed Waste Strategy and an Action Plan based on selected
                      options

                   1.3 Scope of Project Plan
                   The present Options Development Project Plan (Project Plan) is limited to Part 1 of
                   the methodology for strategy development.
                   The Project Plan is intended to provide a framework for the assessment and
                   selection of a best value solution for the management of waste in the Noosa Council
                   (NC) area. The Project Plan presents priority ‘themes’ and associated options, which
                   have been identified In consultation with Council, and which should form the focus
                   of the options Gevelopment phase. In addition, the Project Plan indicates NC’s
                   preferred approach to management (timeframes, reporting, principles, procedures,
                   etc.) of the options development process. Effectively, the Project Plan presents a
                   brief for those tasked with Part 1 of the Waste Strategy preparation.

                                                              Lloyd Consulting | Introduction SS

                                                                                                 Page 11 of 200
Log in to download the original file

2014-04-28 General Committee Meeting Agenda Pages 1-64(PDF, 6MB).pdf · 5.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.