PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 8 NOVEMBER 2016
Acid Sulfate Soils
32. An acid sulfate soils investigation (with recommendations) for the management of the
proposed development must be undertaken by a qualified person* in accordance with
the Queensland Acid Sulfate Soil Technical Manual Soil Management Guideline v4.0
(2014), or a more current version and submitted with the application for Operational
Works.
33. All works must be carried out in accordance with the Acid Sulfate Soil and
Groundwater Management Plan for the development prepared by a qualified person*
and referenced in a Development Permit for Operational Works. *(Refer to Advisory
Note)
34. All waters, including stormwater runoff, groundwater seepage and leachate from acid
sulfate soils must achieve the following quality prior to release from the site:
a. a pH range of 6.5-8.5 pH units
b. 50mg/L maximum total suspended solids concentration
c. 0.3mg/L maximum total iron concentration
d. 0.2mg/L maximum total aluminium concentration
e. no visible plume at either the point of release from the site or within a waterway
35. Any underground tanks including the underground detention tank stormwater quality
improvement proprietary device must be and designed and constructed as a water
excluding structure in accordance with Australian Standard AS3735 “Concrete
Structures for Retaining Liquids” to ensure groundwater does not enter after
construction is completed.
36. All treated material must undergo verification testing at the rate of one sample per
250m³ throughout the duration of the excavation phase of the development. The
verification testing must be undertaken by a qualified person* using the SPOCAS or
Chromium Reducible Sulphur testing suite and the results must be submitted to
Council for appraisal.
ENVIRONMENTAL HEALTH
Development Code – Hazardous Industry
37. The design, specifications and construction of the Manifest Quantity Workplace
(MQW) storage and dispensing of petroleum products (Service Station) is to comply
in all respects with the Model Development Code for Hazardous Industries and
Chemicals - Workplace Health and Safety Queensland(WHSQ)
38. Certification must be provided to Council from a suitably qualified person* which
certifies that the design, construction, operation and safety of the MQW (specifically
including the design and operation of the stormwater quality improvement device:
treatment tank/Stormwater 360 pods filter cartridges & detention tank) complies in all
respects with the WHSQ Code prior to commissioning the site.
A suitably qualified person* is a Registered Professional Engineer of Queensland
with experience and knowledge in the design and operation of the storage and
dispensing of petroleum products.
Environmental Protection – General Environmental Duty S319
39. A copy of this decision notice must be kept on site in a location readily accessible to
personnel carrying out this activity.
40. Notwithstanding any other condition of this decision notice, this notice does not
authorize any release of contaminants that cause or is likely to cause an
environmental nuisance beyond the boundary of the property.
Page 11 of 70
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.