PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                             8 NOVEMBER 2016


    73.   The SQUID (treatment tank/ Stormwater 360 pods filter cartridges & detention tank)
          intended to be installed as part of the stormwater drainage system for the UFA, must
          incorporate the following design measures as a minimum:
          a.   steel bars or trash gates with at least 20mm spacing;
          b.   filtration devices such as sand filters or gross pollutant traps capable of
               removing litter (diameter greater than 5mm) and at least 70% of fine sediments
               (>125µm).
          c.   a wastewater treatment device, such as an oil and hydrocarbon separator, triple
               interceptor or equivalent, capable of removing droplets larger than 60µm (i.e.
               corresponding to outlet discharge of approximately 15mg/L) and to a point
               where there is no visible sheen or odour on stormwater. This device is to be
               able to meet these requirements during a storm up to the 2 year ARI-6 minute
               design rainfall event without surcharging or backing up the drainage system.
          d.   flow cut-off valves are to be installed at the outlet from the separator to use in
               case of an emergency or cleaning operations.
          e.   be maintained in accordance with the manufacturers recommendations.
          f.   be engineered to ventilate any likely hazchem vapour and make a safe working
               environment in accordance with the Model Development Code for Hazardous
               Industries and Chemicals - Workplace Health and Safety Queensland.
          Equipment Integrity Test (EIT) of UPSS
    74.   An EIT of the UPSS is to be conducted by a duly qualified person in accordance with
          the manufacturer’s written instructions specific to the UPSS.
    75.   The EIT must be capable of detecting a leak of 0.38 litres per hour, with a probability
          of detection of at least 95% and of false detection of 5% or less in accordance with
          AS 4897–2008 – The design, installation and operation of underground petroleum
          storage systems.
    76.   The EIT must be a nationally approved and certified method of testing that meets, at
          a minimum, the requirements or certification standards of the United States
          Environmental Protection Agency (USEPA 1990).
    77.   The EIT of the UPSS must be undertaken at the following times :
          a.   immediately before commissioning the new UPSS
          b.   immediately following any modification to the UPSS
          c.   immediately following installation of re-used equipment
          d.   immediately following any equipment retrofit
          e.   immediately following any repair to UPSS equipment
          f.   where the leak detection systems indicate failure
          g.   where there is only one method of leak detection system in use
          h.   where there is evidence of a leak
          i.   when requested by Council
    78.   The results of any EIT must be provided to Council upon commissioning the UPSS
          and as requested by Council and must provide as a minimum the following
          information:
          a.   equipment identification number
          b.   location and date of test


                                                                                  Page 15 of 70
Log in to download the original file

2016-11-08 S&O Agenda - Item 1, Attachment 1 - Annual Report 2015-16(PDF, 7MB).pdf · 7.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.