Skip to the record
Accept no imitations.

Original source · versioned page text

2016-11-08 S&O Agenda - Item 1, Attachment 1 - Annual Report 2015-16

of 70

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                           8 NOVEMBER 2016


          Water & Sewer Connections
    10.   An underground connection to reticulated water and sewerage must be provided to
          the development site in accordance with the standards and requirements of Northern
          SEQ Distributor–Retailer Authority (Unitywater).
    11.   A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
          (Unitywater) must be submitted to Council that certifies an underground connection to
          reticulated water and sewerage has been provided to the development site.
    ENGINEERING
    12.   A minimum of 18 car parking spaces and 4 motor cycle spaces must be provided on
          the site which includes 1 disabled space. One loading bay in addition to the 18 car
          spaces as indicated on the approved plans.
    13.   Eight (8) bicycle parking spaces must be provided on-site.
    14.   All car parking areas and access driveways must be maintained exclusively for
          vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
    15.   Any awnings and/or other structures in close proximity to the proposed loading zone
          must be designed to ensure no obstruction or impact on the functioning and the use
          of the loading zone.
    16.   To ensure pedestrian safety between vehicles exiting the site and pedestrians on the
          footpath, the driveway and any associated fencing or vegetation near the driveway
          must comply with the minimum sight line requirements as defined in AS 2890.1,
          section 3.2.4.
          Stormwater Drainage
    17.   Stormwater runoff from the development must be disposed of on-site generally in
          accordance with the approved engineering plans causing scour or damage to the
          subject site or any adjoining property.
          Electricity and Telecommunication Services
    18.   Unless otherwise stipulated by telecommunications legislation at the time of
          construction, the development must be provided with all necessary conduits, pits and
          pipes to accommodate the future connection of optic fibre technology
          telecommunications.
          Landscaping Works
    19.   The development site must be landscaped. The works must be undertaken in
          accordance with the approved plans and Planning Scheme Policy PSP 3
          Landscaping Plants and Guidelines.
    20.   All landscape works must be established and maintained in accordance with the
          approved design for the life of the development, and in a manner that ensures
          healthy, sustained and vigorous plant growth. All plant material must be allowed to
          grow to full form and be refurbished when its life expectancy is reached.
    ENVIRONMENTAL HEALTH
          Noise
    21.   Mechanical plant and equipment, a/c units, motors, refrigeration equipment,
          compressors, pumps etc. must be situated within the building or suitably provided
          with noise reduction measures and located as to prevent a noise nuisance beyond
          the boundary of the site and not exceed the levels specified in Table 1.




                                                                                Page 40 of 70
Log in to download the original file

2016-11-08 S&O Agenda - Item 1, Attachment 1 - Annual Report 2015-16(PDF, 7MB).pdf · 7.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.