PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 8 NOVEMBER 2016
Service Vehicles
16. All required service vehicles’ parking, manoeuvring and standing spaces must be
provided on the site. The works must be undertaken in accordance with an
Operational Works approval and must include in particular:
a. Heavy Rigid Vehicle (HRV) space.
b. A regular access for a 19m B-Double refuelling vehicle.
Pedestrian and Bicycle Facilities
17. Pedestrian and bicycle facilities must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and must
include in particular:
a. a dedicated pedestrian pathway along the northern boundary to provide a link
between the Eumundi Noosa Road footpath and the building. The pathway
must be clearly marked for pedestrian use.
b. signage and lighting at strategic locations to direct people to building entries.
c. any required pedestrian refuge areas within the carpark to ensure safe and
convenient pedestrians movements within the site.
d. a total of 3 bicycle parking spaces.
Electricity and Telecommunication Services
18. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
19. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and
all applicable legislation at the time of construction.
Undergrounding of Existing Overhead Power Connections
20. Any existing overhead electricity connections to the site must be removed and new
service connections must be provided underground.
Water & Sewer Connections
21. An underground connection to reticulated water and sewerage must be provided to
the development site in accordance with the standards and requirements of Northern
SEQ Distributor–Retailer Authority (Unitywater).
22. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection to
reticulated water and sewerage has been provided to the development site.
Damage to Services and Assets
23. Any damage caused to existing services and assets above or below the ground must
be repaired:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
Page 9 of 70
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.