Council archive · source document
F0002-AA007595-AAR-10-SMP · MCU14/0102.05
Attached to the e-mail Revised Amendments to the SMP MCU14/102.05.
Very large file (17.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
PROPOSED DEVELOPMENT
This application addresses the reconfiguration of lot component of the development. It is proposed
that two lots will be created through this development. The proposed Lot 1 (generally in the
location of existing Lot 31 SP170751) will have a site area of 0.53 Ha. The proposed Lot 2
(generally in the location of existing Lot 4 SP159610) will have a site area of 0.25 Ha.
This development currently has approval for the following uses:
– Retail Business Type 5 – Vehicle Uses (service station);
– Retail Business Type 2 – Shop & Salon (shop within service station);
– Industrial Business Type 2 – Production, Alteration, Repackaging & Repairing;
– Industrial Business Type 1 – Warehouse;
– Retail Business Type 6 – Hardware Store; and
– Entertainment and Dining Business Type 1 – Food & Beverages (restaurant/café).
Landscaping and 63 car parks and 8 motorcycle spaces will also be provided as part of this
development. Dual access is proposed to the overall site through a left in, left out access from
Eumundi Noosa Road, and access from Lionel Donovan Drive.
Access easements, as well as easements for stormwater and sewer services will be provided as
part of these works. Refer to the survey plan and proposed plans included in Appendix B.
PROPOSED INTERNAL DRAINAGE PATTERN
As much as practicably possible the proposed development will maintain and/or improve the
functionality of the existing drainage pattern. Cut and fill earthworks are proposed across the
site to generally bring the levels of Lot 31 into line with Lot 4. However, these works are not of a
significant volume nor do they alter the stormwater runoff regime.
EXTERNAL CATCHMENTS
The site is not subject to any external catchments.
FLOOD ASSESSMENT
Noosa Council provides River and Storm Tide Flood Maps to assess whether the site will be
affected by flooding. The proposed development site is not within the flood line for either River
or Storm flooding. The flood maps can be found in Appendix C.
Stormwater Management Plans
Page 4 Hyder Consulting Pty Ltd-ABN 76 104 485 289
f:\aa007595\f-reports\f0002-aar-aa007595 sbswmp report\f0002-aa007595-aar-04.-smp.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
F0002-AA007595-AAR-10-SMP.PDFRelated documentApplication case desk ↗
About this file
- File size
- 17.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.