Council archive · source document
F0002-AA007595-AAR-10-SMP · MCU14/0102.05
Attached to the e-mail Revised Amendments to the SMP MCU14/102.05.
Very large file (17.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Project: Eumundi Noosa Road
Project No.: AA007595
Designer: KF
Date: 5/11/2014
Rational Method Calculations
Project Eumundi Noosa Road
Description Catchment 2 (Western Side) Post-Developed Discharge
Time of Concentration 5.0 minutes
Area of Catchment 0.24 Hectares
Fraction Impervious 0.9
Council Chart No.
15
Council Name
#N/A
ARI C value Rainfall Intensity Discharge (m3/s) Comments
(mm/hr)
3month 0.03 Write anything here
1 year 0.71 128.57 0.06 that is applicable to
the analysis
2 year 0.76 163.17 0.08
5 year 0.85 200.83 0.11
10 year 0.89 222.29 0.13
20 year 0.93 252.10 0.16
50 year 1.00 291.10 0.19
100 year 1.00 320.76 0.21
ARI vs Discharge
6.00
5.00
Discharge (cumecs)
4.00
3.00
2.00
1.00
0.00
0 10 20 30 40 50 60 70 80 90 100
ARI
All Calculations are based on QUDM methods Version 4/05
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
F0002-AA007595-AAR-10-SMP.PDFRelated documentApplication case desk ↗
About this file
- File size
- 17.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.