SPECIFIC OUTCOMES, ACCEPTABLE SOLUTIONS AND PROBABLE SOLUTIONS
FOR THE WATER SENSITIVE DESIGN CODE
SPECIFIC OUTCOMES PROBABLE SOLUTIONS SITE COMPLIANCE
Water reuse S1.1 Complies:
O1 Development complies with - The development
Development uses a the water quality standards includes three
combination of detention in Table 2 of the SEQ bioretention systems
and retention systems to Regional Plan and a detention
capture run-off from areas Implementation Guideline basin to ensure that
on the site No.7 for Water Sensitive peak flow
AND Urban Design; discharges are
mitigated and water
O2 quality is maintained
S2.1
Water storage devices - Water detained on
must have sufficient No solution provided
site will not be for
capacity having regard to potable use
local rainfall pattern and S3.1
the catchment area of roof - Site is not within the
Captured water is plumbed Shire Business
or other hard standing to be available for all
surface Centre
external uses including
AND gardening, irrigation,
O3 ponds, filling swimming
Captured water is utilised pools and outdoor
for all non-potable uses on cleaning, as well as all
site; ground floor toilet cisterns
and washing machine cold
AND
taps;
O4
On-site detention does not AND
adversely impact on water
requirements downstream S3.2
of the site where the water Where the captured water
is required to sustain the is used for toilet flushing
ecology and hydrology of and/or laundry use, an
downstream systems automatic or manual
(environmental flows); interchange device that
AND allows alternate use of
captured water or the
O5 reticulated water supply is
Within the Shire Business installed to ensure that
Centre site, as shown on there is a continual supply
Map SBC, on-site detention of water for sanitary
measures are contained flushing and laundry use.
within the developed S4.1
areas of the site,
clear of drainage lines and No solution provided
Open Space Precincts. S5.1
No solution provide
Eumundi Stormwaster Code Compliance Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
F0002-AA007595-AAR-10-SMP.PDFRelated documentApplication case desk ↗
About this file
- File size
- 17.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.