Council archive · source document
F0002-AA007595-AAR-10-SMP · MCU14/0102.05
Attached to the e-mail Revised Amendments to the SMP MCU14/102.05.
Very large file (17.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
2.1 Components
The Puraceptor Class 1 is a gravity-type, passive, full retention flow system that treats all flows through two
chambers. Low velocity laminar flow provides quiescent conditions in the separator enabling the light liquid
content of the water to separate and rise to the surface due to the difference in density of the hydrocarbons
and water. Contaminated water cannot flow directly across the surface before effective separation has taken
place. Treatment process involves the `cleaner` water passing from the primary chamber by underflow into the
secondary chamber and finally through a coalescing filter mounted in the secondary chamber to `collect` smaller
droplets of hydrocarbons and encourage larger droplets to form enabling better removal by gravity to the
collecting area in the sealed secondary chamber. The SPEL Puraceptor is sized to treat and capture all flows.
There is no bypass facility, meaning all pollutants are captured and retained between maintenance cycles. Figure
1 illustrates a sectional view of the SPEL Puraceptor and its components.
Figure 1. SPEL Puraceptor and its major components
2.1.1 Coalescing Filter
The coalescer is a high-reticulated and high-contact surface filter with a minimum life span of eight years. It is
mounted into the secondary chamber, providing a coalescing process for the separation of smaller oil droplets.
Incorporated in the secondary chamber prevents the coalescer from being blocked in the event of major
spillages and large amounts of accumulated hydrocarbon or heavy silt content in the surface water.
SPEL Coalescer Units Guide Rail System/Lifting, Locating and Locking System
This facilitates easy insertion and removal of coalescer unit. The system is robust, manufactured throughout in
stainless steel and is action positive, leaving no doubt the coalescer unit is located properly. Brackets fixed to
the top and bottom of the coalescer unit simply engage the stainless steel guide rail fixed to the top of the stub
access shaft.
HEAD OFFICE POSTAL EMAIL ABN spel.com.au
100 Silverwater Road PO BOX 7138 [email protected] 83 151 832 629
Silverwater NSW 2128 Silverwater NSW 2128
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
F0002-AA007595-AAR-10-SMP.PDFRelated documentApplication case desk ↗
About this file
- File size
- 17.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.