Council archive · source document
F0002-AA007595-AAR-10-SMP · MCU14/0102.05
Attached to the e-mail Revised Amendments to the SMP MCU14/102.05.
Very large file (17.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Figure 9. Woolworths Lakewood site (shown by yellow line).
Grab samples were collected on 11th July 2014, from the upstream access chambers to the Puraceptor (Location
1, yellow dot) and from the treated downstream chamber of the Puraceptor (Location 2, green dot) as shown in
Figure 10. Chemical analyses were performed by eurofins I mgt laboratories.
The results of the water quality analyses are presented in Table 4. An evaluation of the percentage removal of
the pollutant concentrations as the water passes through the Puraceptor is also presented in Table 3, though it
is recognised that the grab samples provide a snapshot of a single point in time.
HEAD OFFICE POSTAL EMAIL ABN spel.com.au
100 Silverwater Road PO BOX 7138 [email protected] 83 151 832 629
Silverwater NSW 2128 Silverwater NSW 2128
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
F0002-AA007595-AAR-10-SMP.PDFRelated documentApplication case desk ↗
About this file
- File size
- 17.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.