    ENERGEX SPECIFICATION
                                                                                                                                                                                                                                                  THE BUIIDERIDEVELOPEP IS TO PROVIDE ENERGEX INITIALLY WITH A WRITTEN UNDERTAKING THAT THE CASEMENTS WILL GRANTED
                                                                                                                                                                                                                                                  SO THAT THE PROTECT MAY PPOI:EED DURING THE DESIGN PROCESS      EASEMENT SMALL COVER THE HV CABLE ROUTE.
                                                                                                                              ENERSOX'S STAFF SHALL HAVE ACCESS TO THE SUBSTATION AT ALL TIMES WITHOUT HAVING TO ENTER                            SUBSTATION SITE AND REMOTE EARTH GRID AREA THE ENERGEX NEWTWOPK WELL NOT BE COMMISSIONED UNTIL ALL THE PEOUREO
    1.0 INTRODUCTION                                                                                                          SECURITY AREAS    THE ONUS WILL BE ON THE CUSTOMER TO MAINTAIN SAID ACCESS 24 HOURS A DAY. 7                        EASEMENTS HAVE BEEN REGISTERED
                                                                                                                              DAYS A WEEK
    THIS SPE". AT'ON CATERS FOP PADMOUNTED TRANSFORMER STATIONS ON CUSTOMERS PREMISES FRONTING ONTO ROAD RESERVE                                                                                                                                  THE OEVELOPEP/BUILDER IS REQUIRED TO GRANT THE EASEMENTS AS NOTED ON THE SITE PLANS REFEREED TO BY 11EPGEX
                                                                                                                              A MINIMUM Of 20 METRES OF (LEAP ACCESS SHALL BE PROVIDED IN FRONT OF THE SUBSTATION CABINET.
    PAOMC \-C 'PANSFORMER FOUNDATIONS TO BE BUILT ACCORDING TO SITE SKETCH AND DESIGN                                         THIS WILL PROVIDE A SAFE WORKING PLATFORM AND ACCESS AROUND THE LOCKABLE ODORS WHEN OPENED                          IN THE IOPM 2216 PRIOR TO THE SUPPLY BEING MADE AVAILABLE
    STANCAD.S .ON-ANED IN THIS CO(UMENT                                                                                       FOR EMERGENCY OPERATIONS
                                                                                                                                                                                                                                                  ALL COSTS ASSOCIATED WITH THE REGISTERING. SURVEYING, DOCUMENT PERPETRATION ETC SHALL BE BOUNE BY THE BUILDER/
                                                                                                                                                                                                                                                  DEVELOPER
    IT 15 '-E %z5- \5?_-Y OF       -  "L 5 CNS.I
                                             •   TAINT TO ENSURE THAT THE INFOPMATION CONTAINED
    HFREP     DaS::\ TIC THE D--.\- .ONTPA OaS                                                                                 4.2    HEAVY EOUIPMENT . STABLE GROUND SITES-
                                                                                                                                                                                                                                                  THE BULDEPIDEVELOPEP SHALL LIAISE WITH ENERGEX5 PROPERTY DEPARTMENT N RELATION TO ENSURING THAT
                                                                                                                              PAOMOUNTED TRANSFORMERS APE HAULED BY FLAT BED TRUCKS WITH SELF CONTAINED CRANES                                    ALL NECESSARY DOCUMENTATION IS COMPLETED ILONTA(T STEVE S00 E%(PGEX PROPERTY PH )407 41311


                                                                                                                              ANY ACCESS OR MANCEUVRNG AREA WHICH WILL BE USED FOR THE PURPOSE OF OFF LOADING OR                                  THE FOLLOWING GENERA', DETAILS WILL APPLY
                                                                                                                              LOADING TRANSFORMERS SHOULD BE CONSTRUCTED TO TAKE THE LOADING N ALL WEATHER CONDITIONS                                  - ALL DD;UMENTS SHALL BE ACCEPTABLE TO THE DEPARTMENT OF NATURAL RESOURCES
                                                                                                                                                                                                                                                         THE GPANTEE SHOULD BE SHOWN AS 'ENERGEX LIMITED CACN 071 849 0551"
    UPON PE=EVNG A PEOUEST FOP ELECTRICITY SUPPLY FOR A DEVELOPER. ARCHITECT. OR BUILDER. THE
                                                                                                                               THE HEADROOM ALONG THE ACCESS ROUTE IS PEOUPEO TO BE 43M WI'N NO CUS P..7'ONS OVER THE                                    REFER 10 ME"GPANOUM NO 700541471 FOP UNDERGROUND ELECTRICITY (MEMORANDUM IS REGISTERED WITH
    FQLLOWM1G NEGO-^A'gNS TAKE PLACE-
                                                                                                                               (PANE MANOEUVRING AREA   THE WIDTH OF ACCESS RECURRED FOP PEASONAB," S-PA CH' ROUTES                                      NATURAL RESOUPCfSI
    T A TEETER OF INTENT IS SENT BY THE CUSTOMER TO ENERGEX SIRING IMEOPR4ATION WITH REGARDS TO                                SHOULD BE INCREASED ON BENDS AND IN THE MANOEUVRING AREA NEAP THE SEES-A-CON ECJAMFNT
                                                                                                                               ACCESS DOOR REQUIRED FOP THE OFF LOADING OF THE TRANSFORMER FROM THE T'L< BY THE MOBILE                            THE BU.DFRIDEVELOPEP WILL FORWARD THE DOCUMENT '0 ENEPGEX FOP REVIEW AND EXECUTION     ENEPGEX WILL THEN
      THE SIZE AND TYPE OF LOAD, SITE PANS AND DRAWINGS AND THE LOCATION OF THE REQUIRED SUPPLY
                                                                                                                               (RASE                                                                                                              RETURN THE DOCLMENTN '0 THE BULDER/DEVELOPIR IOU FLITA'PAIIQN WITH THE O(PARTIENT OF NATURAL RESOURCES

    2         IF A SUBSTATION IS RECOUPED, THE SUBSTATION SITE 15 AGREED UPON BY ENERGEX AND THE
                                                                                                                               ANY REINSTATEMENT WHICH MAY BE NECESSAP" 'N THE EVENT OF DAMAGE TO CCEPETE SLAB. PAVING                            THE BULOEPIDEVELURER IS TO RETURN A COPY OF THE REGISTRATION CONFIRMATION STATEMENT TO ENERGETIC
             CUSTOMER,
                                                                                                                               TILES OR ROAD SURFACES ETC IS THE RESPONSIBILITY OF THE OWNER OF THE PFCRERTY
    3         ENERGEX APPROVES A SITE SKETCH DETAILING THE SUBSTATION CONSTRUCTION DETAILS.                                                                                                                                                       ALL PRIVATE SERVICES EASEMENTS MUST BE REGISTERED PRIOR 10 SUPPLY BEING MADE AVAILABLE TO THE FUTURE
             SPECIE EATON. STANDARD DRAWINGS AND FORM 2226 STATING (CONDITIONS O SUPPLY FOR SIGNATURE                                                                                                                                             DEVE .OPMENT SITES
             AND RETURN

    4         C.i-.°?=    MP-ETES -UP" 2226 AND RETURNS TO ENERGEX WITH TRANSFORMER REQUIREMENT
             DAT__ a..„M,UNTO B" 'PAASFCPMEP DEPOSIT INOTE.     AT LEAST B WEEKS PRIOR NOTICE OF
             TRAYS        =EDJ'PCMLN- DATE IS PEOUIREDI                                                                                                                                                                                               'ANN :.e.. S SHALL BE INSTALLED WHERE A (HAIRDO IN 6PIND LEVEL OF 304M OR MORE N(URS WITHIN 70001141M OF THE SUBSTATION
                                                                                                                                                                                                                                                     ,A-.N : PIP (NOTE THE CLEARANCE ZONE FOP COMMON EARTH SUBSTATIONS APPLES TO ALL SITUATIONS FOR THIS (LAUS11
    S.        CUSTOMER EXCAVATES FOUNDATION AND CONDUIT TRENCHES.                                                                                                                                                                                  'N Y >,-A_. BE %SAlltfr, FOP
                                                                                                                               ALL CONDUITS, AS50CIATEO FITTINGS AND BENDS SHALL COMPLY WITH THE RECUP;MNTS OF A,/NZS 2053 AND BE
    6         ENEPGEX INSTALLS EARTHING                                                                                         15MM OR 150MM AS SPECIFIED BY ENERGEX AND SHALL BE SUPPLIED AND INS-ALLED BY THE DEVELOPER
                                                                                                                               AS PEP "METHOD OF LAYING UNDERGROUND EEC "RICA' CONDUITS" - SEE SHEET IT    CONDUITS SHALL
    7         CUSTOMER COMPLETES FOUNDATION AND CONDUIT INSTALLATION
                                                                                                                              BE SECURELY SLATED BY BUILDER TO PREVENT NGPSS OF DIRT UNTIL CABLE NSTAL'LATION BY ENERGEX
                                                                                                                              AND THEN RESEALED BY ENEPGEX ALL ABOVE G'PO„NO CONDUITS SHALL RE UV S-ASA'LISE0
    8         CUSTOMER NOTIFIES ENEPGEX OF COMPLETION OF FOUNDATION AND CONDUIT INSTALLATION
                                                                                                                                                                                                                                                  FEW:E$ANTIPEIANNJ WA SS"A,5F: JNSTRUCTED TD ENEPGfX STANDARDS TO SATISFY NNMIM CLEARM(E ZONES OF (CHIIDN EARTH
                                                                                                                               REFER ENERGEX UNDERGROUND DISTRIBUTION DOCUMENT 7576-A4 FOP DETAILS OF CONDUIT INSTALLATION                        isCIN I.JPA T'IONS
    9         ENERGEX INSPECTS THE TRANSFORMER SITE FOR COMPLIANCE WITH DESIGN REQUIREMENTS                                    WITHIN THE PAOMOUNT TRANSFORMER SITE                                                                               HNFPI,FX MAY PEOUIPf T-E )ETV-_UPIP TV PPOVOE ACIVIL CNGNCCPS ((RTEKATION OF ARETARING WAIL
    10         ENERGEX INSTALLS PADMOUNT TRANSFORMER
                                                                                                                               EACH CONDUIT TO BE FITTED WITH A 6MM BRAIDED POLYPROPYLENE DRAW POPE
                                                                                                                                                                                                                                                  SFFAPATE EARTH CONFIGURATION MAY HAVE A FENCE / RETAINING WALL POSITIONED OUTSIDE TIE (LEARAN(E ZONE OFCOMMON EARTH
    11         (US" .I'H1 P   NSTALLS HIS CONS.MCP LOU VDL-ADE MAINS                                                                                                                                                                              L]NI,;UPA T ON BUT INSIDE THE CLEARANCE ZONE REQUWED BY SEPARATE EAR IN (ONFKARATION A FENCE POSITIONED AS SUCH SHALL BE
                                                                                                                               ENERGEX MAY NEED TO INSTALL AN EARTH WIRE AND EARTH ROOS IN CONDUIT TRENCHES FROM THE
                                                                                                                                                                                                                                                  IN-IONDTXTIVE
                                                                                                                               SUBSTATION SITE,
    12         I'IPLI X NEPG.IES SUBSTATION DPTV";INC T,AT                                                                                                                                                                                        NONE METAL RETAINING WALL FENCES MAYBE USED IN CHEN AREAS
                                                                                                                                                                                                                                                  (REFER I:l l SHEET 61
                                                                                                                               POLYMERIC LARNE P6011. HON COVER SHALL BE PLACED OVER ALL CONDUITS AND CABLES OUTSIDE THE
                   1      CUSTOMER RESPONSIBILITIES ARE FULFILLED
                                                                                                                               ELECTRICITY FOOTPATH ALIGNMENT TO PROVIDE PROIEI(ION. ELEI:TPUTY SUPPLY CONDUITS AND CABLES
                   2      ALL (ONTRIBUTIGNS HAVE BEEN PAID (INCLUDING STORAGE FEE IF APPLICABLE(                               SHAT I. HAVE PNYMEIRIL CABLE PROTECTION COVERS PLACED !COMM ABOVE THE TOP CONDUIT FACE OF THE                      12.0   SUBSTATION ORIENTATION
                   3      FORM 2226 IS RETURNED                                                                                E F''. TPIIITY SUPPLY CONDUITS AND CABLES TABLE PROTECTION COVERS SHALL BE LAPPED WHEN PLACED
                                                                                                                               TLd,F TIER; INOMM MINIMUM ALONG THE LOGTUDINAL AXIS. COMM MINIMUM ALONG THE TRANSVERSE AXIS AND                    FPON' _NINY SUNS IA I ION5 SHA NI 'Jun NMI S)I H' HAT III IV AND HY PANELS ARE EASILY AC(ESSIU( FROM TIEOE
                                                                                                                               ,HA       IXTENII LOMM MINIMUM PAST THE EXTERNAL EDGES OF THE CONOUITICABLE BANK
                                                                                                                                                                                                                                                  13.0     BACKFILLING AND FINAL RESTORATION OF SURFACE
    3.0        BUILDING GENERAL                                                                                                                                                                                                                   ALL BATKFII i:IT,F VADMUUN'SI_HSTATON 5'E MLS' NE iOMPAL TIORLfORE FINAL RESTORATION OF THE SITE SURFACE
                                                                                                                               RDLYMERIC (:ABLE PROTECTION COVER SHALL BE A MINIMUM OF SMM THICK AS DESCRIBED IN THE DRAFT
        I'     VU:.TNC SERVICES -                                                                                              AUSTRALIAN STANDARD, OR 94102 FOP POLYMERIC CABLE PROTECTION COVERS.
                                                                                                                               III[ SUPPLY OF POLYMERIC (ABLE PROTECTION COVEPS AND MARKET PLASTIC WARNING TAPE SHALL BE                          Sf AI INU OF THE CABLE APERTURES IN THE PRECAST CONCRETE PLINIII AND CONSTRUCTION O THE (OWPET( SURROUND SLAB OVER THE GROUND SURFACE SMALL BE IN ACCORDANCE WITH THE
                                                                                                                               111E PISVONSIBII ITY OF THE DEVELOPER AND THEY SHALL BE MANUFACTURED AND SUPPLIED IN ACCORDANCE                     TINS TPU(TION OPAWNILS
    NO SERVICES 01$R IHAN EN14GEMS I RAPT. ISIS AND APPAILV"D PAP'S 0- I.I I.IS IrIIMI.I",
    ELE(IRICAL MAINS SHAT. PASS TI,PDUGF OR UNDER THE SUBSTATION AREA                                                          WITH (LAU$L 10.8 IN THE (NERCAX UNOEVGREUN0 DISTRIBUTION DOCUMENT


                                                                                                                                                                                                                                                         141 SEPAPA It L ARIHINU SI      I HE DISI ANTE Of IWEEN THE FDGE OF THE PI INTM AND TIN CONSUMERS BULGING/Pt SIDEN(ES FENCES LV SWITRROANC CARTH AMC METAL BUILDERS
                                                                                                                                                                                                                                                              POLES SHALL BE A MINMUM III SMI IWES AT SITES WHIPS SEVAPA If I V AND HV FAPTHINU SIST(MS APE NS IALLED THE AODII ONA, ARIA SHAH HE ROAD DESERVE OP AN
    BUILDING WORM SHALL BE COMPLETED IN A NEAI IPAIUI SMAN INI MANNER AND SMALL BE AS Of I AILED
    ON THE DRAWINGS APPROVED BY ENERGEX'S BRANCH OF'ICE BEFORE THE INSIALLAIION OF EQUIPMENT                                                                                                                                                                  EASEMENT ' PREVENT ENLPOA, lMENT THE OISTAN' F BETWEEN NNE IDLE OI THE PLINTH AND HLLSIRAS PLANT AND EQUIPMENT SHAH BE I5 MFIPFS AT SITFS'WHERE SEPARATE LV
                                                                                                                               AN FAPTIIING SYSTEM I.ONSISTING OF 79V1A EA-II- PCOS, A CONTINUOUS FARTS PING AROUND ',HE
                                                                                                                                                                                                                                                              AND IIV LAPO''IS 5H51 FM$ APT INST AI I ED
                                                                                                                               SUNGTAIION IONNFLTINE, IIIF PODS AN. LAil' 'IM1G "ALS CONNECTED TO ENEPGEX EOUIPMENT AND
                                                                                                                               GATES WILL BE INSTALLED BY ENEPGEX       -SAE IARnnNG SYSTEM MAY BE REOUIPEO TO BE EXTENDED
    33         CONSTRUCTION                                                                                                                                                                                                                              141 (OMMUN IAV IHnl•I SITES THE DISTANCE BETWEEN THE EDGE OF THE PLINTH AND IELSTRAS PLANT AND EQUIPMENT SHALL BE I METRES AT SITES WHERE COMMON EARTHING SYSTEMS
                                                                                                                               INTO I ACT F TRENCHES ADJOINING THE 'PANSFIPMEP SITE
                                                                                                                                                                                                                                                               I(MLIII AP! NSIALLLO
    THE PADMOUNTED TRANSFORMER SITE SHALL BE PREPARED BY THE CUSTOMER                                                          THE BUILDER SHALL NOTIFY ENEPGEXS WORKS CO OROINATOP ONE WEEK PRIOR TO TRENCH ANSI SITE
                                                                                                                               FOUNUATION EXIAVAIION TO AVOW CHI INSTALLATION OF THE EARTHING SYSTEM AND LOCATION OF THE
    AN ACCESS AREA OF 4800 X 5000 IS REQUIRED FOR CABLING, EARTHING, INSTALLATION AND SAFE                                     EARTHING TAILS FOR EQUIPMENT FARTHING
    OPERATION OF APPARATUS                                                                                                                                                                                                                        15.0     COMMERCIAL AND INDUSTRIAL INSTALLATIONS

                                                                                                                               IF THE SUBSTATION FLOOR IS NOT At GROUND LEVEL EARTHING MUST BE INSTALLED BELOW THE BASEMENT                       SUBS-A(IINS SI,AII 81111-AI _ N APIAS LI,LRI A M00111 I I I,ANt (ANI ASn Y A..I NS IIII Sill ICI INSTAL AND REeLA, I A SUBSTATION AT ANY TIME Of TIDE N••R11 OR DAY, SEVEN DAYS A
    THE TRANSFORMER SITE SHALL BE ABOVE THE LOCAL FLOOD LEVEL WITH THE TOP OF THE CONCRETE PLINTH                                                                                                                                                 WEEK
                                                                                                                               FOUNDATIONS WITH TWO SEPARATED, PROTECTED INSULATES I ABIE IONNECTIONS TO THE GRID
    25MM ABOVE TOLE FINISHED YARD LEVEL
    CABLE AUEPT.IPES THROUGH THE PRECAST CONIRETC PLINTH SHALL BE BACKFILLEO TO 50MM FROM THE TOP
    OF REEN>-
    THE LOIN U[-1 SLAB IS TO SLOPE AWAY FROM PLINTH FAILING AT A SLOPE OF I IN 25.                                                   FAT        ELELTPPIIY REGULATIONS 1977 - PART 2 REGULATION 8
                                                                                                                                     RBI        ASIN753000 - 2000 SAA WIRING RULES?                                                               ENEP,IEA' ABLF CONDUITS FOP THE DEAF! OPMENt MAYBE PLACED IN THE SUBSTATION SITE AND SHALL PASS DOWN THE SIDES OR THROUGH THE UNIEULVEPT FOUNDATION NO CONDUITS SHALL
                                                                                                                                     I()        UN1ORM PPAUI E MANUAL FOR PROTECTIVE EARTHING SEC (0) M2 - 1977 SECTIONS 3, 5, 7, 8 A 10          PASS LNOEV THE UNICUIVERT FOUNDATION
    THE TRANSFORMER SITE SHALL BE LEVEL - /SMM WITH A MAXIMUM CUT AND FILL OF 150 MM AND SHALL
    BE (ON(PETFD IN ACCORDANCE WITH ENERGEX UNDERGROUND DISTRIBUTION DOCUMENT 7711-A4                                                                                                                                                             CONDUITS SHALL BE ISO MM MINIMUM OEP'H BELOW THE f NSHI.II SURFACE LEVEL ENSURE END WALL KNOCKOUTS ARE GROUTED WITH A HIGH STREN1T11 SAND AND CEMENT GROUT AFTER
                                                                                                                                                                                                                                                  CUNOUI T II AOLI INSTALLATION IMRCIUUlIUNIULVHlTl(lUNCA7ION
                                                                                                                               THE PADMOUNI TRANSFORMER WILL BE SUPPLILG AND INSTALLED BY ENERGEX EXCEPT BY SPECIAL
    CONCRETE FILED 146MM 00 56MM THICK GALVANISED STEEL PIPES MAY BE REDUIREO OUTSIDE THE SITE FOR PROTECTION                  ASAEEMFNI BETWEEN TIRE CUSTOMER AND ENEPGEX                                                                        THE SITE SURFACE IS TO BE FINISIIU WITH A ONLRETE SLAB (PEI ER I TINSIPA, I ION!IPAWM,SI THE 10 METRE WIDE APRON IN FRONT O THE SUBSTATION I.ABNET SHALL BE FINISHED WITH A
    FROM VEHICLES IN CAP PARKS, ETC
                                                                                                                                                                                                                                                  CONI:PLIE SLAB SEE TIOTEO WI T H I ONSIMUL IION !OINTS 1 GP 1 A$ Y PLMUVAI II I K' AVA Il


    FOP A SEEP SLOPING SITE A RETAINING WALL AND GUARD PAL WILL BF REOUIRI0 TO BE CONSTRUCTED BY
                                                                                                                                                                                                                                                  SUBSITIONS IN ALANU$, APt AREA SMALL MAVE A FORMED PATHWAY FROM THE FOOTPATH REAL PROPERTY STREET ALIGNMENT TO THE SUBSTATION SITE THIS IS 10 PROVIDE SAFE ACCESS TO
    THE CUSTOMER   REFER TO ENERGEX UNDERGROUND DISTRIBUTION DOCUMENTS 7465 A4 TL73-A4, 1414-AL                                WHERE SUPPLY IS MADE AVAILABLE FROM THE LV BUSBAPS OF THE TRANSFORMER, THE CUSTOMER SHALL
                                                                                                                               SUPPLY ALL CONNECTORS. STAINLESS STEEL BOLTS NUTS, WASHERS, (ABLE CLEATS AND SUPPORTS AND                          THE SITE TOP FIELD PLPSONAL
                                                                                                                                                                                                                                                  WHEN PLANTING VEST IAT ION INI ANOS(APEO AREAS AND GARDENS IANE INTO (ONSID(RATION THE FULLY MATURED SIZE OF VEIN TATION fNSA INN A((ESS TO TIE SITE ONE METRE CLEAR
                                                                                                                               IONNE(t TO THE TERMINALS AS DIPECTED BY ENEPGEX
                                                                                                                                                                                                                                                  AI.,E55 AROUND IHE $DE$ ANC BACK OF fH,T SUBSTATION I$ WANT AINI0 AND TWIT ML TRES (CLAP 611(5510 THE FRONT OF THE SUBSTATION IS MAINTAI FD
                                                                                                                               WII@f SUPPLY 15 MADE AVAILABLE FROM A CIRCUIT OF A LOW VOLTAGE DISTRIBUTION BOARD. THE
                                                                                                                              'US'OMEP SHALL SUPPLY ALL CONNECTORS. STAINLESS STEEL BOLTS. NUTS, WASHERS AND CONNECT TO THE                       FNf PIFX ABI A LONDUTS FOR THE DEVELOPMENT MAYBE PLACED IN THE SUBSTATION SITE AND SHALL PASS DOWN I TIE SEES OR THROUGH THE UNEUVEPT FOUNDATION NO EONUUIS SHALL
                                                                                                                               TERMINALS AS DIRECTED BY ENERGEX                                                                                   PASS UNDIP THE uNICUI VfPT FOUNDATION
             STABLE SOIL CONDITIONS
             FLOOD FREE                                                                                                                                                                                                                           CONDUITS SHALL BE 150 MM MINIMUM DEPTH BELOW I'll FINISHED SURFACE LEVEL ENSURE (NO WALL KNOCKOUTS ARE GROUTED WITH A HOCH STRENGTH SAND AND CEMENT GROUT AFTER
                                                                                                                                                                                                                                                  C ONOUIICAALE INSTALLATION 'HROUGH UNIEULVEPT fDNWOAIIUN
             LEVEL TOPOGRAPHY
             WHERE POSSIBLE FREE FROM STEEP BATTERS
             WHERE POSSIBLE 4 METRES MNMUMFROMEDGE OF PERMSSELE
             RESIDENTIAL DWELLING C016TRU(1WN AREA
                                                                                                                                                                                                                                                  BOLLARDS SHALL N NSTAIItI) WHIP( PAUNJLNI S APE INSTALLED Al CAR PARKS Of OTHER AREA$ WHERE PADMOLNTS ARE LIKELY ID BE ANA(TEO BY VEHICLES
                                                                                                                                                                                                                                                  'HE FOLLOWING OUTLINES THE ",%MUM REOIAPEMFNT FOP THE DESIGN / INSTALLATION OF B(XLAPOS

                                                                                                                                                                                                                                                     I SHALL BE MAAUFA(TLREDa 56MM 111(11 GAL STEEL IMEOUlI
                                                                                                                                                                                                                                                     2 (XMUAR TUBE FILLED WITH (OKRETE AND CAPPED
                                                                                                                                                                                                                                                     3 MPAMLHI 1404" OD
                                                                                                                                                                                                                                                     4 BURIED 720MN N 400 X 400 X 77001 CONCRETE PAD
                                                                                                                                                                                                                                                     S hSTALLIED 900PM ABOVE GROUND AT ISM CENTRES



                                                                                                                                                                                                                                                                                                                                                                                    INFORMATION ONLY

                                                                                                                                           MARCH 2011

KORN'lN                               IW431TTl   PN                                                                                        NA                                                                                                                                                                                                                                     CIVIL DRAWING
                                                                                                                                           AT
                                                                                                                                                                 TGM GTO-o S-3 O aT
                                                                                                                                                                1315 a TAY
                                                                                                                                                                BWNYY VC 33D
                                                                                                                                                                                                                      H. TROON PTY. LTD.                                          PROPOSED BUNNINGS
                                                                                                                                                                T 035310 BNA                                                               ANI09A OOIABHAIAR IIYMt11W
                                                                                                                                                                                                                                                                                  WAREHOUSE
                                                                                                                                                                                                                                                                                                                                                           ENERGEX SPECIFICATIONS
                                                                                                                                                                FW$3A3N5

                                                                                                                                                                R8YYY1WYNk3090
                                                                                                                                                                .8N 11 12$$WrI
                                                                                                                                                                                                TGM                                                                               EUMUNDI-NOOSA ROAD
                                                                                                                                                                ._  T7_                                                                                                           NOOSAVILLE, QUEENSLAND
                                                                                                                COPFAIA.T I S X BOOM IB ITA
                                                                                                                                                                                                                                                                                                                                                                     4400-02-CE                                        E02 03 02

Used in these records

About this file

File size
6.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Proposed Bunnings Warehouse Noosaville Amended Civil Works Drawings.pdf · 6.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.