Minor Change Report 132001 210127 4 · 132001.210127.4
1907NOO_ F Site Sections and Elevations prepared by 19/06/2023
PD_A_250 Enrich Architecture
1907NOO_ E Banksia Wing Elevations prepared by Enrich 19/06/2023
PD_A_310 Architecture
1907NOO_ G Banksia South Elevations prepared by Enrich 12/09/2024
DD_A_BS302 Architecture
1907NOO_ E Administration & Communal Area Elevations 19/06/2023
PD_A_311 prepared by Enrich Architecture
1907NOO_ G Tree Removal Plan prepared by Enrich 19/06/2023
PD_A_001.2 Architecture
1907NOO_ B External Works Plan Region 2 prepared by 01/07/2024
DD_A_EW203.2 Enrich Architecture
1907NOO_ B External Works Plan Region 6 prepared by 01/07/2024
DD_A_EW203.6 Enrich Architecture
01737 LC_01 B Landscape Site Plan prepared by View March 2023
Landscape Architecture
01737 LC_02 B Landscape Concept Plan prepared by View March 2023
Landscape Architecture
01737 LC_03 B Landscape Detailed Concept Plan prepared March 2023
by View Landscape Architecture
01737 LC_04 B Suggested Planting Character prepared by March 2023
View Landscape Architecture
57. A minimum of 44 car parking spaces must be provided and marked on the site and
made available and accessible at all times while the use is open for business. The
works must be generally in accordance with Enrich Architecture’s Site Plan
(DD_A_002.0, Rev. R) dated 12 September 2024 and must include in particular:
a. pedestrian routes in accordance with the conditions of this Decision Notice; and
b. dimensions, crossfalls and gradients in accordance with Australian Standard
AS2890: Parking Facilities.
58. Stormwater runoff from the development must be connected to a lawful point of
discharge without causing scour or damage to the subject site or any adjoining
properties. The works must be undertaken in accordance with an Operational Works
approval and be generally in accordance with STP Consultants’ Stormwater Layout
Plan (SKC01) dated 21 March 2023 and (SCK02) dated 20 March 2023. The works
must include, but not be limited to:
a. All Causeways (both temporary and permanent) must be constructed to comply
with all relevant sections of Queensland Urban Drainage Manual (QUDM);
b. All Causeways (both temporary and permanent) must be constructed to comply
with Section 10.3.5 of Sunshine Coast Council’s Open Space Landscape
Infrastructure Manual 2022 (Type 5 Fire Access Trail);
Page 13 of 14
Document Set ID: 23161231
Version: 6, Version Date: 14/11/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Report 132001 210127 4Related documentApplication case desk ↗
About this file
- File size
- 6.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.