Minor Change Report 132001 210127 4 · 132001.210127.4
Existing Conditions 57 & 58
57. A minimum of 44 car parking spaces must be provided and marked on the site and
made available and accessible at all times while the use is open for business. The
works must be generally in accordance with Proposed Overall Ground Floor Plan
(PD_A_003.1 E) dated 23 March 2023.
58. Stormwater runoff from the development must be connected to a lawful point of
discharge without causing scour or damage to the subject site or any adjoining
properties. The works must be undertaken in accordance with an Operational Works
approval and be generally in accordance with STP Consultants’ Stormwater Layout
Plan (SKC01) dated 21 March 2023 and (SCK02) dated 20 March 2023. The works
must include, but not be limited to:
a. All Causeways (both temporary and permanent) must be constructed to comply
with all relevant sections of Queensland Urban Drainage Manual (QUDM);
b. All Causeways (both temporary and permanent) must be constructed to comply
with Section 10.3.5 of Sunshine Coast Council’s Open Space Landscape
Infrastructure Manual 2022 (Type 5 Fire Access Trail); and
c. Works must not adversely affect the existing water quality treatment capabilities
of the development as to result in pollutants exiting the site.
Applicant’s Request
The applicant has not requested to amend Conditions 57 & 58.
Assessment of Request
Council’s Senior Development Engineer has reviewed the application material and provided an
additional recommendation that conditions 57 and 58 are amended to the reflect that latest
development layout and stormwater treatment devices (i.e., the additional infiltration trench). The
amendments are considered necessary to ensure the development approval references the latest
approved and referenced documents.
Existing Conditions 65 & 69
65. The development site must be landscaped. The works must be undertaken in
accordance with an Operational Works approval and the Noosa Plan for that specific
area and must include in particular:
a. the works shown on the approved Landscape Concept plans shown in the
Approved Plans
b. Vegetation clearing within the site is to be offset through the rehabilitation of the
area of vegetation adjacent to Cooyar Street. The area is to incorporate
revegetation works that offset all native vegetation removal that is proposed on
the site.
c. control of all weeds species listed in the following standards and legislation:
i. declared plants under the Land Protection (Biodiversity Act 2014 and sub-
ordinate Regulation 2016).
ii. Noosa Local Government Area Pest Management Plan 2015-2019.
69. The existing Allocasurina littoralis in the south-eastern portion of the subject site must
be retained, except where required to be removed to accommodate the approved
building, in accordance with the recommendations of an Arborist Report (or part
thereof) prepared by a qualified person* and endorsed through an Operational Works
approval.
*(Refer to Advisory Note)
Page 9 of 14
Document Set ID: 23161231
Version: 6, Version Date: 14/11/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Report 132001 210127 4Related documentApplication case desk ↗
About this file
- File size
- 6.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.