Geotechnical Report
PROPOSED UNIT DEVELOPMENT
31 BOTTLEBRUSH AVENUE, NOOSA HEADS
Table of Contents
1.0 INTRODUCTION ........................................................................................................................................................ 1
2.0 PROPOSED DEVELOPMENT ................................................................................................................................... 1
3.0 METHOD OF INVESTIGATION ................................................................................................................................. 2
4.0 RESULTS OF INVESTIGATION ................................................................................................................................ 2
4.1 Site Description............................................................................................................................................. 2
4.2 Topography................................................................................................................................................... 4
4.3 Geology ........................................................................................................................................................ 5
4.4 Subsurface Conditions.................................................................................................................................. 5
4.5 Groundwater ................................................................................................................................................. 7
4.6 Surface Drainage .......................................................................................................................................... 7
4.7 Existing Structures ........................................................................................................................................ 7
5.0 SLOPE STABILITY ASSESSMENT .......................................................................................................................... 8
5.1 Existing Conditions ....................................................................................................................................... 8
5.2 Stability Assessment..................................................................................................................................... 8
6.0 GEOTECHNICAL RECOMMENDATIONS .............................................................................................................. 10
6.1 Development Limitations ............................................................................................................................ 10
6.2 Earthworks – General ................................................................................................................................. 10
6.2.1 Site Preparation and Trafficability ......................................................................................................... 10
6.2.2 Excavations ........................................................................................................................................... 10
6.2.3 Filling..................................................................................................................................................... 11
6.3 Building Foundations .................................................................................................................................. 11
6.3.1 Indicative Site Classification.................................................................................................................. 11
6.3.2 Footing Design ...................................................................................................................................... 11
6.4 Retaining Structures ................................................................................................................................... 13
6.5 Drainage ..................................................................................................................................................... 13
7.0 SUMMARY & CONCLUSIONS................................................................................................................................ 13
8.0 LIMITATIONS .......................................................................................................................................................... 14
17 December 2020
Report No. 20384-001-Rev0 iii
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Geotechnical Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.