SUPERSEDED Decision Notice - DBW22/0186
Currency Period
2. This development approval lapses if the works have not substantially started by 12 April
2025, unless an application to extend the currency period is approved by Council.
Approved Plans
3. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the tables below. The plans must be amended to incorporate
the amendments listed within the table below and resubmitted to Council prior to the issue
of any Development Permit for Operational Works.
Plan No. Rev. Plan/Document Name Date
000 Q Cover Sheet prepared by Lightbody 23/02/2023
Architects
0110 O Site Plan Proposed prepared by Lightbody 23/02/2023
Architects
1001 X Level 1 – Floor Plan prepared by Lightbody 23/03/2023
Architects
1002 N Basement – Floor Plan prepared by 23/02/2023
Lightbody Architects
1003 V Roof Plan prepared by Lightbody Architects 23/02/2023
2000 V Building Elevations prepared by Lightbody 23/02/2023
Architects
2001 K Building Elevations prepared by Lightbody 23/02/2023
Architects
2002 V Building Elevations prepared by Lightbody 23/02/2023
Architects
2003 I Building Elevations prepared by Lightbody 23/02/2023
Architects
2101 T Building Sections prepared by Lightbody 23/02/2023
Architects
2102 S Building Sections prepared by Lightbody 23/02/2023
Architects
The following plans require amendment.
Plan No. Rev. Plan/Document Name Date
1000 X Ground Floor – Floor Plan prepared by 23/02/2023
Lightbody Architects
2103 T Building Sections prepared by Lightbody 23/02/2023
Architects
Amendments Remove the fire pit as fire pits are prohibited in urban areas by
Council’s Local Laws.
Page 2 of 8
Document Set ID: 22372921
Version: 3, Version Date: 17/04/2023