Delegated Report - Code - Planning OPW25 0021 · OPW25/0021
Real property description: Lot 36 RP 897845
Planning Scheme: Noosa Plan 2020 (25 September 2020)
2. DECISION DETAILS
Council decided to issue the following type of approval:
• Development Permit for Operational Works – Electrical
3. CURRENCY PERIOD OF APPROVAL
The currency period for this development approval is stated in the conditions below.
4. ASSESSMENT MANAGER CONDITIONS
APPROVED PLANS
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
24191 B “Site Plan & Schedules” 30 January 2025
Sheet 1 of 2 Prepared by Millwell Services
24191 B “Existing & Proposed LV Geographics” 30 January 2025
Sheet 2 of 2 Prepared by Millwell Services
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 10 March 2027, unless an application to extend the currency period
is approved by Council.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
3. All necessary approvals from external service providers (e.g., Energex) and external parties
on which the development works are proposed have been obtained and a copy supplied to
Council.
4. A condition report including photographs of the frontage of the site must be completed and
submitted to council prior to the prestart meeting.
5. Certificates demonstrating currency of public liability insurance and works insurance covering
the works must be submitted to Council prior to the prestart meeting.
6. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
a. Electrical reticulation works.
7. A Construction Management Plan must be submitted prior to the prestart meeting and must
address the following:
a. Traffic management during all phases of construction;
b. Adequate parking arrangements for works and deliveries;
Page 4 of 8
Document Set ID: 23576624
Version: 3, Version Date: 04/03/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning OPW25 0021.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.