Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Attachment 1 - Proposal Plans · 51995.1645.01

Attached to the e-mail Lodgement of Development Application - 51995.1645.01.

of 6

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                                                                                                                      TENDER
                                                                                                                                                                                                                                                                                                                                                                     NOT FOR CONSTRUCTION

                                                                                                                                                                                                                                                                                                                                               GENERAL NOTES:
                                                                                                                                                                                                                                                                                                                                               (these notes apply to all drawings)

                                                                                                                                                                                                                                                                                                                                               •      These designs, drawings and specifications are copyright
                                                                                                                                                                                                                                                                                                                                                      and the property of Cayas + Ward and must not be used,
                                                                                                                                                                                                                                                                                                                                                      reproduced or copied wholly or in part without the
                                                                                                                                                                                                                                                                                                                                                      permission of Cayas + Ward.
                                                                                                                                                                                                                                                                                                                                               •      Do not scale - use figured dimensions in preference to
                                                                                                                                                                                                                                                                                                                                                      scaled dimensions.
                                                                                                                                                                                                                                                                                                                                               •      All dimensions must be checked on site prior to the
                                                                                                                                                                                                                                                                                                                                                      commencement of construction and/or manufacture of any
                                                                                                                                                                                                                                                                                                                                                      item.
                                                                                                                                                                                                                                                                                                                                               •      Where demolition work is included, allow to make good all
                                                                                                                                                                                                                                                                                                                                                      affected surfaces.
                                                                                                                                                                                                                                                                                                                                               •      Ensure that all conditions of the building certification are
                                                                                                                                                                                                                                                                                                                                                      complied with.
                                                                                                                                                                                                                                                                                                                                               •      Where ambiguities or discrepancies exist, Cayas + Ward
                                                                                                                                                                                                                                                                                                                                                      shall be contacted for clarification, or it will be deemed that
                                                                                                                                                                                                                                                                                                                                                      the more expensive option has been allowed.
                                                                                                                                                                                                                                                                                                                                               •      All work is to comply with all relevant sections of NCC
                                                                                                                                                                                                                                                                                                                                                      and/or Australian Standards.
                                                                                                                                                                                                                                                                                                                                               •      These drawings are to be read in conjunction with all other
                                                                                                                                                                                                                                                                                                                                                      documentation, schedules & consultant documentation.
                                                                                                                                                                                                                                                                                                                                               •      The contractor is to allow for all necessary floor preparation




                                                                   R
                                                                                                                                                                                                                                                                                                                                                      works.
                                                                                                                                                                                                                                                                                                                                               •      Provide all warranties as per the manufacturers & suppliers




                                                                  D
                                                                                                                                                                                                                                                                                                                                                      standard warranties.
                                                                                                                                                                                                                                                                                                                                               •      All materials, equipment, fixtures, fittings, etc. Shall be new




                                                              SA
                                                                                                                                                                                                                                                                                                                                                      first quality without exception. Supply, delivery, storage,
                                                                                                                                                                                                                                                                                                                                                      installation, etc. Is to be as per the manufacturers most




                                                              O




                                                                                                                                                                                                             EX. ROOF
                                                                                                                                                                                                                                                                                                                                                      recent written recommendations.




                                                        O
                                                                                                                                                                                                                                                                                                                                               •      Supply & install fire extinguishers to comply with Australian




                                                                                                                                                                                                             FALL
                                                                                                                                                                                                                                                                                                                                                      Standards to the area of the proposed work.




                                                      N
                                                                                                                                                                                                                                                                                                                                               •      Termite protection is to be provided to comply with AS
                                                                                                                                                                                                                                                                                                                                                      3660.1-2000 and clarification to be provided on completion.
                                                                                                                                                          FALL                                             FALL                                                                                                                                •      The construction and fit out of commercial kitchens and
                                                                                                                                                          EX. ROOF                                         EX. ROOF                                                                                                                                   bars are to comply with AS 4674-2004.
                                                                                                                                                                                                                                                                                                                                               •      Builder to inspect existing walls that are proposed to have
                                                                                                                                                                                                                                                                                                                                                      new finishes and ensure that a suitable substrate is present
                                                                                                                                                                                                                                                                                                                                                      or is provided to achieve the specified finish. Builder to
                                                                                                                                                                                                                                                        FALL     FALL                                                                                 inspect existing walls that are proposed to conceal services
                                                                                                                                                                                                                                                                                                                                                      and ensure that an adequate cavity is present or provide




                                                                                                                                                                                                                                      FALL EX. ROOF
                                                                                                                                                                                                                                                        EX. ROOF EX. ROOF




                                                                                                                                              YR
                                                                                                                                                                                                                                                                                                                                                      furring channels.




                                                                                                                                          N DA
                                                                                                                                       OU
                                                                                                                                       EB
                                                                            SUBJECT AREA OF PROPOSED
                                                                                                                                                                                                                                                                            ADJACENT RESIDENCES




                                                                                                                                    SIT
                                                                            WORKS SHOWN SHADED
                                                                                                                                                          FALL                  FALL            FALL       FALL




                                                                                                                                                                                                                                      FALL EX. ROOF
                                                                                                                                                          EX. ROOF              EX. ROOF        EX. ROOF   EX. ROOF
                                                                            NEW ENTRY AWNING TO




                                                                                                                                               EX. ROOF
                                                                            GAMING. REFER TO ELEVATION




                                                                                                                                               FALL
                                                                            BOX GUTTER


                                                                                                                                                                                                                                   FALL EX. ROOF




                                                                                                                                                                                FALL EX. ROOF




                                                                                                                                                                                                                                        FALL EX. ROOF
                                                                                                                    FALL EX. ROOF
                                     NEW WINDOW AWNING OVER



                                                                                                         FA
                                                                                                      E X LL
                                                                                                         .R
                                                                                                            OO




                                                                                                                                                                                FALL EX. ROOF
                                                                                                              F


                                                                                                                                     NOOSA REEF HOTEL
                           SUBJECT AREA OF PROPOSED
                           WORKS SHOWN SHADED
                                                                                                      NEW
                                                                                         BOX GUTTER




                           EXISTING SIGNAGE PYLON                                                     ROOF




                                                                                                                                                                FALL EX. ROOF
                           NEW ENTRY AWNING
                           STRUCTURE OVER

                           NEW PICKET FENCING TO
                           REPLACE EXISTING




                                                                                                                                                                                                                 FA
                                                                                                                                                                                                                    LL
                                                                                                                                                                                                                        EX
                                                                                                                                                                                                                         .R
                                                                                                                                                                                                                             OO
                                                                                                                                                                                                                               F
                                                                                                                  ADJOINING BWS TENNANCY


                                                                                                                                                                                                                                                                                                                                       V E
                                                                                                                                                                                                                                                                                                                                     A
                                                                                                                                                                                                                                                                                                                               T T
                                                                                                                                                                                                                                                                                                                             E
                                                                                                                                                                                                                                                                                                                         N
                                                                                                                                                                                                                                                                                                                B   EN
                                                                      H
                                                                       IB




                                                                                                                                                                                                                                                                                                           AR
                                                                          IS




                                                                                                                                                                                                                                                                                                       G
                                                                                                                                                                                                                                                                                                  ED
                                                                                                                                                                                                                                                                                                                                                D               General Updates                  RH        16.05.25
                                                                            C




                                                                                                                                                                                                                                                                                                                                                C               General updates                  DV        29.04.25
                                                                               U




                                                                                                                                                                                                                                                                                                                                                B               Consultant Issue                 RH        12.02.25
                                                                                  S




                                                                                                                                                                                                                                                                                                                                                A               Consultant Issue                 RH        24.01.25
                                                                                                                                                                                                                                                                                                                                              issue                   revision                  initials     date
                                                                                      A




                                                                                                                                                                                                                                                                                                                                                             Cayas
                                                                                              V
                                                                                                      E




                                                                                                                                                                                                                                                                                                                                                               + Ward
                                                                                                                                                                                                                                                                                                                                              Suite 2, 19-25 Musk Avenue, Kelvin Grove. PO Box 360, Wilston Q 4051
                                                                                                                                                                                                                                                                                                                                                          p 07 3356 6100 e [email protected]
    Proposed - Site Plan                                                                                                                                                                                                                                                                                                                             NSW Nominated Architect: Kimberley James Garton 8891
1   1 : 200                                                                                                                                                                                                                                                                                                                                  client                     ALH Group


                                                                                                                                                                                                                                                                                                                                             project                    Noosa Reef Hotel
                                                                                                                                                                                                                                                                                                                                                                        19 Noosa Dr, Noosa Heads
                                                                                                                                                                                                                                                                                                                                                                        QLD 4567
                                                                                                                                                                                                                                                                                                                                             drawing title              Proposed Site Plan




                                                                                                                                                                                                                                                                                                                                                                      drawn         RH
                                                                                                                                                                                                                                                                                                                                                                      date          MAY 2025
                                                                                                                                                                                                                                                                                                                                                                      scale         1 : 200@A1
                                                                                                                                                                                                                                                                                                                                             project no.               drawing number                         issue

                                                                                                                                                                                                                                                                                                                                             2395                      A100.00                                  D
Full text of the other 5 pages

Page 2

                                                                                                                                                                                                                                                                                                 TENDER
                                                                                                                                                                                                                                                                                                NOT FOR CONSTRUCTION

                                                                                                                                                                                                                                                                          GENERAL NOTES:
              1.                                            2                                                                    3                                                 4                                                                       5        6     (these notes apply to all drawings)

                                                                                                                                                                                                                                                                          •      These designs, drawings and specifications are copyright
                                                                                                                                                                                                                                                                                 and the property of Cayas + Ward and must not be used,
                                                                                                                                                                                                                                                                                 reproduced or copied wholly or in part without the
                                                                                                                                                                                                                                                                                 permission of Cayas + Ward.
                                                                                                                                                                                                                                                                          •      Do not scale - use figured dimensions in preference to
                                                                                                                                                                                                                                                                                 scaled dimensions.
                                                                                                                                                                                                                                                                          •      All dimensions must be checked on site prior to the
                                                                                                                                                                                                                                                                                 commencement of construction and/or manufacture of any
                                                                                                                                                                                                                                                                                 item.
                                                                                                                                                                                                                                                                          •      Where demolition work is included, allow to make good all
                                                                                                                                                                                                                                                                                 affected surfaces.
                                                                                                                                                                                                                                                                          •      Ensure that all conditions of the building certification are
                                                                                                                                                                                                                                                                                 complied with.
                                                                                                                                                                                                                                                                          •      Where ambiguities or discrepancies exist, Cayas + Ward
                                                                                                                                                                                                                                                                                 shall be contacted for clarification, or it will be deemed that
                                                                                                                                                                                                                                                                                 the more expensive option has been allowed.
                                                                                                                                                                                                                                                                          •      All work is to comply with all relevant sections of NCC
                                                                                                                                                                                                                                                                                 and/or Australian Standards.
                                                                                                                                                                                                                                                                          •      These drawings are to be read in conjunction with all other
                                                                                                                                                                                                                                                                                 documentation, schedules & consultant documentation.
                                                                                                                                                                                                                                                                          •      The contractor is to allow for all necessary floor preparation
                                                                                                                                                                                                                                                                                 works.
                                                                                                                                                                                                                                                                          •      Provide all warranties as per the manufacturers & suppliers
                                                                                                                                                                                                                                                                                 standard warranties.
                                                                                                                                                                                                                                                                          •      All materials, equipment, fixtures, fittings, etc. Shall be new
                                                                                                                                                                                                                                                                                 first quality without exception. Supply, delivery, storage,
                                                                                                                                                                                                                                                                                 installation, etc. Is to be as per the manufacturers most
                                                                                                                                                                                                                                                                                 recent written recommendations.
                                                                                                                                                                                                                                                                          •      Supply & install fire extinguishers to comply with Australian
                                                                                                                                                                                                                                                                                 Standards to the area of the proposed work.
                                                                                                                                                                                                                                                                          •      Termite protection is to be provided to comply with AS
                                                                                                                                                                                                                                                                                 3660.1-2000 and clarification to be provided on completion.
                                                                                                                                                                                                                                                                          •      The construction and fit out of commercial kitchens and
                                                                                                                                                                                                                                                                                 bars are to comply with AS 4674-2004.
                                                                                                                                                                                                                                                                          •      Builder to inspect existing walls that are proposed to have




                                                                                                                                                                     A N IN G
                                                                                                                                                                                                                                                                                 new finishes and ensure that a suitable substrate is present




                                                                                                                                                                          R
                                                                                                                                                                   PL IST
                                                                                                                                                                        TE
                                                                                                                                                                                                                      UP                                                         or is provided to achieve the specified finish. Builder to




                                                                                                                                                                     EX
                                                                                                                                                                                                                                                                                 inspect existing walls that are proposed to conceal services
                                                                                                                                                                                                                                                                                 and ensure that an adequate cavity is present or provide
                                                                                                                                                                                                                                                                                 furring channels.


                                                                                                                                                                                             ROO
                                                                                                                                                                                                F OV
                                                                                                                                                                                                          ERH
                                                                                                                                                                                                                EAD




                                                                                                                                                     A N IN G
                                                                                                                                                          R
                                                                                                                                                   PL IST
                                                                                                                                                        TE
                                                                                                                                                     EX
A
                                                                                                                                                                                               LOWER DECK                                           LOWER TERRACE

                                                                                                                                                                                                                                       UP

                                                                                                                                                                                                          UP




                                                                               R
B


                                                                          D
                                                                    SA                                                                                               DOSA
                                                                O
                                                                O



                                                                                                                                                                                                     AIRLOCK
                                                           N



                                                                    A100.05                                                                                                                                                  SUNKEN LOUNGE
                                                                              12
                                                                                                                                                                                                                                 OUT OF SCOPE
                                                                                                                                                                                                                            UP




C                                                                                                                                                                                                                      UP




                                                                                                                                                                                   PLANTER
                                                                                          A N IN G




                                                                                                                                                                                                RAMP UP
                                                                                                                                               GAMING ROOM
                                                                                               R
                                                                                        PL IST
                                                                                             TE
                                                                                          EX




                                                                                                                                                                                                                                 GAMING ROOM
D
                                                           UP                                                               UP




                                                                                                                                                                                   PLANTER
                                                                                   UP


                                                                                                                                                    UP
                   EXTENT OF NEW                                                                                                                                                                UP
                   AWNING ROOF OVER                                                             STORE                                                           BANQUETTE
                   SHOWN DASHED                                                             OUT OF SCOPE                                                        UP
                                                                                                                       UP            RAMP UP
                                                 RAMP UP                                                                             UP
                                                                                                                                                                                RAMP UP
                                                                              FOYER
                                                                                                                     PLANTER

E
                                                                                                                                                                                                                      OUT OF SCOPE
                                                                                                                                                                                                                      MECHANICAL                SERVICES
                                      MALE                                    OFFICE


                                                                                                                                                GAMING BAR
                                                                                                           PLANTER




                                                                                                                                                                                                                                                                           D               General Updates                  RH        16.05.25
                                                                                                                                                                                             STAIR                                                                         C               General updates                  DV        29.04.25
                                        MECHANICAL
                             RY




                                                                                                                                                                                                                                                                           B               Consultant Issue                 RH        12.02.25
                           DA




                                                                                                                                                                                                                                                                           A               Consultant Issue                 RH        24.01.25
                            N




                                                                                                                                                                                                                                                                         issue                   revision                  initials     date
                         OU




                                                                                                                                                                                                                                                                                        Cayas
                    EB
                   SIT




                                                                                                                                                                                                                                                                                          + Ward
                                                                                                                                                                                                                                                                         Suite 2, 19-25 Musk Avenue, Kelvin Grove. PO Box 360, Wilston Q 4051
                                                                                                                                                                                                                                                                                     p 07 3356 6100 e [email protected]
                                                                                                                                                                                                                                                                                NSW Nominated Architect: Kimberley James Garton 8891

                                                                                                                                                                                                                                                                        client                     ALH Group
F



                                                                                                                                                                                                                                                                        project                    Noosa Reef Hotel
                                                                                                                                                                                                                                                                                                   19 Noosa Dr, Noosa Heads
                                                                                                                                                                                                                                                                                                   QLD 4567
                                                                                                                                                                                                                                                                        drawing title              Proposed Lower Ground
                                                                                                                                                                                                                                                                                                   Floor Plan

        Proposed Lower Ground - Floor Plan
    1   1 : 100                                                                                                                                                                                                                                                                                  drawn         RH
                                                                                                                                                                                                                                                                                                 date          MAY 2025
                                                                                                                                                                                                                                                                                                 scale         1 : 100@A1
                                                                                                                                                                                                                                                                        project no.               drawing number                         issue

                                                                                                                                                                                                                                                                        2395                      A100.01                                  D

Page 3

                                                                                                                                                    1.                                                                                2                                                                                                   3                                                                      4                                                       5                        6
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    TENDER
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   NOT FOR CONSTRUCTION

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             GENERAL NOTES:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             (these notes apply to all drawings)

                                     A                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       •      These designs, drawings and specifications are copyright
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    and the property of Cayas + Ward and must not be used,
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    reproduced or copied wholly or in part without the
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    permission of Cayas + Ward.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             •      Do not scale - use figured dimensions in preference to
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    scaled dimensions.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             •      All dimensions must be checked on site prior to the
                                                                                                                                                                                                                                                                                                                                                                                                      UPPER TERRACE 2                                                                                                               commencement of construction and/or manufacture of any
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    item.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             •      Where demolition work is included, allow to make good all
                                                                                                                                                                                                                                                                                                                                                                                                       ROOF OVERHEAD
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    affected surfaces.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                         UP                                                  •      Ensure that all conditions of the building certification are
                                     B                                                                                                                                                                                                                                                                                                                                                                           UP                                                                                                                 complied with.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             •      Where ambiguities or discrepancies exist, Cayas + Ward
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    shall be contacted for clarification, or it will be deemed that
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    the more expensive option has been allowed.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             •      All work is to comply with all relevant sections of NCC
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    and/or Australian Standards.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             •      These drawings are to be read in conjunction with all other
                                                                                                                                                                                                                                                                                                                                                                    ROOF OVERHEAD                                                                                                                                                   documentation, schedules & consultant documentation.
                                                                                                                                                                                                                                                A100.05                                                                                                                                                                                                                                                                      •      The contractor is to allow for all necessary floor preparation
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    works.
                                                                                                                                                                                                                                                                12
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             •      Provide all warranties as per the manufacturers & suppliers
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    standard warranties.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             •      All materials, equipment, fixtures, fittings, etc. Shall be new
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    first quality without exception. Supply, delivery, storage,
                                                                                                                                                                                                                                                                                                                                                                                     UPPER TERRACE                                                                                                                                  installation, etc. Is to be as per the manufacturers most
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    recent written recommendations.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                    UP                                                       •      Supply & install fire extinguishers to comply with Australian
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Standards to the area of the proposed work.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             •      Termite protection is to be provided to comply with AS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    3660.1-2000 and clarification to be provided on completion.
                                                                                                                                                                                                                                                                                                                                                                                                                                   ROOF OVERHEAD                                                                             •      The construction and fit out of commercial kitchens and
                                     C




                                                                                                                                                                                                       R
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    bars are to comply with AS 4674-2004.




                                                                                                                                                                                                     D




                                                                                                                                                                                                                                                                                                                          ROOF OVERHEAD
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             •      Builder to inspect existing walls that are proposed to have
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  RAISED DINING                                     new finishes and ensure that a suitable substrate is present




                                                                                                                                                                                                 SA
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    or is provided to achieve the specified finish. Builder to
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    inspect existing walls that are proposed to conceal services
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    and ensure that an adequate cavity is present or provide




                                                                                                                                                                                             O
                                                                                                                                                                                                                                                                                                                                                                                                                                                                             UP                                                     furring channels.




                                                                                                                                                                                         O
                                                                                                                                                                                                                    3090




                                                                                                                                                                                    N
                                                                                                                                                                                                                                                                                                                                                                                                                                     UP

                                                                                                                                                                                                                                                                                                                                                                                                     BAR

                                     D
                                                                                                                                                                         SUBJECT AREA OF PROPOSED                                    UP
                                                                                                                                                                         WORKS SHOWN SHADED                                                                           UP




                                                                                                                                                                                                                                                                                                                                                                                                                                           FUNCTION 2
                                                                                                                                                           3540




                                                                                                                                                                         NEW ENTRY AWNING TO
                                                                                                                                                                                                                                                                                                                                                                 BANQUETTE




                                                                                                                                                                                                                           FALL
                                                                                                                                                                         GAMING. REFER TO ELEVATION
                                                                                                                                                                                                                                                                                                                                                       PLANTER                                         UP
                                                                                                                                                                                                                                                                                                                                                             WAITERS STATION

                                     E

                                                                                                                                                                                                                                                                                                                                                                                                                                                               STORE




                                                                                                                                                                                                                                                                               BANQUETTE
                                                                                                                                                                                                                                    MALE
                                                                                                                                                                                                                                                                                                                                                                                                                              UP
                                                                                                                                                                                             R
                                                                                                                                                                                           TE
                                                                                                                                                                                         AN
                                                                                                                                                                                        PL
                                                                                                                                                                                     G
                                                                                                                                                                                   IN




                                                                                                                                                                                                        FEMALE
                                                                                                                                                                                 IS T
                                                                                                                                                                               EX




                                                                                                                                                                                                                                                                                                                                                                                                                                                        KEG ROOM
                                                                                                                             NEW WINDOW AWNING                                                                                                                                                                                                BISTRO
                                                                                                                00




                                                                                                                                                                  20
                                                                                                                             OVER SHOWN DASHED                       0
                                                                                                             49




                                                                                                                                                                                                                                                                                                                                                                                                              SERVICES
                                                                                                                                                                                                                                                                                           FIRE PLACE
                                                                                                                                                                                                                                                                                                                                                                                                                         POST MIX CORRIDOR
                                                                                                                                                                                                         VISION WALL

                                                                                                                                                                                                                                                                                                                                                                                                                                                        COOL ROOM
                                                                                                35
                                                                                             24




                                     F
                                                                                                                                                                                                                                                                                                                                                                                                                         UP
                                                                                                                                                                                                                                                    BANQUETTE




                                                                                 NEW OPENING TO EXISTING
                                                                                                                                                                                                                                                                     PLANTER




                                                                                 WALL FOR NEW WINDOW
                                                                                                                                                                                                                                                                                                                                                                                                      ATM




                                                                  SUBJECT AREA OF PROPOSED
                                                                                                                                                                                                 SPORTS BAR                                                                                                                                                                                                                                           ENTRY
                                                                  WORKS SHOWN SHADED                                                          TAB
                                                                                                                                      495
345




                                                                                                                                            345




                                     G


                              NEW PICKET FENCE EXTENSION
                                                                                                                                                         EXISTING ENTRY
                              NEW LANDSCAPE LIGHTING                                                                                                                                                                                        BAR

                              EXISTING SIGNAGE PYLON
       AWNING




                                                                                                                                                                                                                                                                                                                KITCHEN                                                                KIDS ROOM                                                                                                       ENTRY
7895




                              NEW PICKET FENCE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      CORRIDOR
                              NEW ENTRY AWNING
                              STRUCTURE OVER
                       DOOR
                1920




                              WIDEN EXISTING
                              DOOR OPENING
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              D               General Updates                  RH        16.05.25
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  UP                                          C               General updates                  DV        29.04.25
                                                              Y




                                     H
                                                              R




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              B               Consultant Issue                 RH        12.02.25
                                                           DA




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              A               Consultant Issue                 RH        24.01.25
                                                          N




                                                                                                OUTDOOR DINING
                                                       OU




                                                                                                                                                                                                                                                                                                                                                                                UP                                                                                                                                          issue                   revision                  initials     date
                                                     EB




                                                                                                                                                                                                                                                                                                                    COLD ROOM
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Cayas
                                                  SIT




                                                                                                                                       3370
                                                                                                                                   AWNING
                                                                                                                                                                                                                                  FEMALE                                                                DRY STORE                                                                                                                                                                                                PARKING
                                                                                                                                                                                                                                                                                                                                                                                                                           CASH ROOM
                                                                                                                                                                                                              PWD                                                                                                                                         CHANGE
                                                                                                                                                                                                                                                                                                                                                           ROOM
                                                                                                                                                                                                                                                                                                                                                                               STAFF ROOM
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             + Ward
                                                                                                                                                                                                                                                                                                                     FREEZER                                                                                                                                                                                                Suite 2, 19-25 Musk Avenue, Kelvin Grove. PO Box 360, Wilston Q 4051
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        p 07 3356 6100 e [email protected]
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   NSW Nominated Architect: Kimberley James Garton 8891
                                                                                                           NEW TILE FLOOR FINISH TO
                                                                                                           REPLACE EXISTING
                                                                                                                                                                                                                                                                        UP                                                                                                                                  OFFICE                     FILE STORAGE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           client                     ALH Group
                                                                                                           NEW LOOSE PLANTER POTS
                                                                                                           NEW PRIVACY SCREENING


                                                                                                                                                                                                                                                                                                                                                 UP
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           project                    Noosa Reef Hotel
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      19 Noosa Dr, Noosa Heads
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      QLD 4567
                                                                                                                                                                                                                                          BWS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           drawing title              Proposed Upper Ground
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      Floor Plan

                                                                                                                                                                                                                                                                                                                                                                               BWS STAFF
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    drawn         RH
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    date          MAY 2025
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    scale         1 : 100@A1
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           project no.               drawing number                         issue

                              Proposed Upper Ground - Floor Plan                                                                                                                                                                                                                                                                                                                                                                                                                                                           2395                      A100.02                                  D
            1                  1 : 100

Page 4

                                                                                     1.                                                                 2                                                  3                                                                4                                     5   6
                                                                                                                                                                                                                                                                                                                                                   TENDER
                                                                                                                                                                                                                                                                                                                                                  NOT FOR CONSTRUCTION

                                                                                                                                                                                                                                                                                                                            GENERAL NOTES:
                                                                                                                                                                                                                                                                                                                            (these notes apply to all drawings)

       A                                                                                                                                                                                                                                                                                                                    •      These designs, drawings and specifications are copyright
                                                                                                                                                                                                                                                                                                                                   and the property of Cayas + Ward and must not be used,
                                                                                                                                                                                                                                                                                                                                   reproduced or copied wholly or in part without the
                                                                                                                                                                                                                                                                                                                                   permission of Cayas + Ward.
                                                                                                                                                                                                                                                                                                                            •      Do not scale - use figured dimensions in preference to
                                                                                                                                                                                                                                                                                                                                   scaled dimensions.
                                                                                                                                                                                                                                                                                                                            •      All dimensions must be checked on site prior to the
                                                                                                                                                                                                                                                                                                                                   commencement of construction and/or manufacture of any
                                                                                                                                                                                                                                                                                                                                   item.
                                                                                                                                                                                                                                                                 DASH INDICATES ROOF BELOW                                  •      Where demolition work is included, allow to make good all
                                                                                                                                                                                                                                                                                                                                   affected surfaces.
                                                                                                                                                                                                                                                                                                                            •      Ensure that all conditions of the building certification are
       B                                                                                                                                                                                                                                                                                                                           complied with.
                                                                                                                                                                                                                                                                                                                            •      Where ambiguities or discrepancies exist, Cayas + Ward
                                                                                                                                                                                                                                                                                                                                   shall be contacted for clarification, or it will be deemed that
                                                                                                                                                                                                                                                                      EXISTING ROOF                                                the more expensive option has been allowed.
                                                                                                                                                                                                                                                                                                                            •      All work is to comply with all relevant sections of NCC
                                                                                                                                                                                                                                                                                                                                   and/or Australian Standards.
                                                                                                                                                                                                                                                                                                                            •      These drawings are to be read in conjunction with all other
                                                                                                                                                                                                                                      ROOF OVERHEAD                                                                                documentation, schedules & consultant documentation.
                                                                                                                                                            A100.05                                                                                                                                                         •      The contractor is to allow for all necessary floor preparation
                                                                                                                                                                                                                                                                                                                                   works.
                                                                                                                                                                      12
                                                                                                                                                                                                                                                                                                                            •      Provide all warranties as per the manufacturers & suppliers
                                                                                                                                                                                                                                                                                                                                   standard warranties.
                                                                                                                                                                                                                                                                                                                            •      All materials, equipment, fixtures, fittings, etc. Shall be new
                                                                                                                                                                                                           EXISTING ROOF                BALCONY                  EXISTING ROOF                                                     first quality without exception. Supply, delivery, storage,
                                                                                                                                                                                                                                                                                                                                   installation, etc. Is to be as per the manufacturers most
                                                                                                                        EXISTING LEVEL 1, NO NEW WORK                                                                                                                                                                              recent written recommendations.
                                                                                                                                                                                                                                                                                                                            •      Supply & install fire extinguishers to comply with Australian
                                                                                                                                                                                                                                                                                                                                   Standards to the area of the proposed work.
                                                                                                                                                                                                                                                                                                                            •      Termite protection is to be provided to comply with AS
                                                                                                                                                                                                                                                                                                                                   3660.1-2000 and clarification to be provided on completion.
                                                                                                                                                                                                                                                                                                                            •      The construction and fit out of commercial kitchens and
       C                                                                                                                                                                                                                                                                                                                           bars are to comply with AS 4674-2004.
                                                                                                                                                                                                                                                                                                                            •      Builder to inspect existing walls that are proposed to have




                                                                                                                             R
                                                                                                                                                                                                                                                                                                                                   new finishes and ensure that a suitable substrate is present
                                                                                                                                                                                                                                                                                                                                   or is provided to achieve the specified finish. Builder to




                                                                                                                          D
                                                                                                                                                                                                                                                                                                                                   inspect existing walls that are proposed to conceal services
                                                                                                                                                                                                                                                                                                                                   and ensure that an adequate cavity is present or provide




                                                                                                                    SA
                                                                                                                                                                                                                                                                                                                                   furring channels.
                                                                                                                                                                                                                           BEDROOM                                                                EXISTING ROOF




                                                                                                                    O
                                                                                                                                                                                                                                                       LIVING ROOM




                                                                                                                O
                                                                                                                N
       D



                                                 SUBJECT AREA OF PROPOSED
                                                 WORKS SHOWN SHADED
                                                                                                                                                                                                                BATHROOM
                                                 NEW ENTRY AWNING BELOW TO                                                                                                                                                                                 KITCHEN
                                                                                                                                                                           EXISTING ROOF                                             BEDROOM                                                      EXISTING ROOF
                                                 GAMING. REFER TO ELEVATION




                                                                                                                                        FALL
                                                 NEW WINDOW AWNING BELOW


       E


                                                                                                                                                                                                                                                                                 STAIR
                                                                                                                                                                                                                                                                                             UP
                                                                                                                                                                                                                                 EXISTING ROOF BELOW
                                                                                                           RY
                                                                                                         DA
                                                                                                          N
                                                                                                       OU
                                                                                                  EB
                                                                                                 SIT




                                                                                          20
                                                                                             0



                                                                                                                                 EXISTING ROOF




       F




                                                                                                                                                                                           EXISTING ROOF



       G


SUBJECT AREA OF PROPOSED
WORKS SHOWN SHADED


EXISTING SIGNAGE PYLON TO REMAIN

                                                                              FALL



NEW ENTRY AWNING
STRUCTURE                                                                                                                                                                                  EXISTING ROOF


                                                                                                                                                                                                                                                                                                                             D               General Updates                  RH        16.05.25
                                                                                                                                                                                                                                                                                                                             C               General updates                  DV        29.04.25
       H                                                                                                                                                                                                                                                                                                                     B               Consultant Issue                 RH        12.02.25
                                                                                                                                                                                                                                                                                                                             A               Consultant Issue                 RH        24.01.25
                                                                                                                                                                                                                                                                                                                           issue                   revision                  initials     date


                                                                                                                                                                                                                                                                                                                                          Cayas
                                                                                                                                                                                                                                                                                                                                            + Ward
                                                                                                                                                                                                                                                                                                                           Suite 2, 19-25 Musk Avenue, Kelvin Grove. PO Box 360, Wilston Q 4051
                                                                                                                                                                                                                                                                                                                                       p 07 3356 6100 e [email protected]
                                                                                                                                                                                                                                                                                                                                  NSW Nominated Architect: Kimberley James Garton 8891

                                                                                                                                                                                                                                                                                                                          client                     ALH Group


                                                                                                                                                                                                                                                                                                                          project                    Noosa Reef Hotel
                                                                                                                                                                                                                                                                                                                                                     19 Noosa Dr, Noosa Heads
                                                                                                                                                                                                                                                                                                                                                     QLD 4567
                                                                                                                                                                                                                                                                                                                          drawing title              Proposed Level 1 Floor Plan


                                                                                                                                                 ADJOINING BWS TENNANCY
                                                                                                                                                                                                                                                                                                                                                   drawn         RH
                                                                                                                                                                                                                                                                                                                                                   date          MAY 2025
                                                                                                                                                                                                                                                                                                                                                   scale         1 : 100@A1
                                                                                                                                                                                                                                                                                                                          project no.               drawing number                         issue
                 Existing Level 1 - Floor Plan
           1       1 : 100                                                                                                                                                                                                                                                                                                2395                      A100.03                                  D
                                                                                                                                                            OUT OF SCOPE

Page 5

                                                                                                                                                                                                                                                                                     TENDER
                                                                                                                                                                                                                                                                                    NOT FOR CONSTRUCTION

                                                                                                                                                                                                                                                              GENERAL NOTES:
                                                                                                                                                                                                                                                              (these notes apply to all drawings)

                                                                                                                                                                                                                                                              •      These designs, drawings and specifications are copyright
                                                                                                                                                                                                                                                                     and the property of Cayas + Ward and must not be used,
                                                                                                                                                                                                                                                                     reproduced or copied wholly or in part without the
                                                                                                                                                                                                                                                                     permission of Cayas + Ward.
                                                                                                                                                                                                                                                              •      Do not scale - use figured dimensions in preference to
                                                                                                                                                                                                                                                                     scaled dimensions.
                                                                                                                                                                                                                                                              •      All dimensions must be checked on site prior to the
                                                                                                                                                                                                                                                                     commencement of construction and/or manufacture of any
                                                                                                                                                                                                                                                                     item.
                                                                                                                                                                                                                                                              •      Where demolition work is included, allow to make good all
                                                                                                                                                                                                                                                                     affected surfaces.
                                                                                                                                                                                                                                                              •      Ensure that all conditions of the building certification are
                                                                                                                                                                                                                                                                     complied with.
                                                                                                                                                                                                                                                              •      Where ambiguities or discrepancies exist, Cayas + Ward
                                                                                                                                                                                                                                                                     shall be contacted for clarification, or it will be deemed that
                                                                                                                                                                                                                                                                     the more expensive option has been allowed.
                                                                                                                                                                                                                                                              •      All work is to comply with all relevant sections of NCC
                                                                                                                                                                                                                                                                     and/or Australian Standards.
                                                                                                                                                                                                                                                              •      These drawings are to be read in conjunction with all other
                                                                                                                                                                                                                                                                     documentation, schedules & consultant documentation.
                                                                                                                                                                                                                                                              •      The contractor is to allow for all necessary floor preparation
                                                                                                                                                                                                                                                                     works.
                                                                                                                                                                                                                                                              •      Provide all warranties as per the manufacturers & suppliers
                                                                                                                                                                                                                                                                     standard warranties.
                                                                                                                                                                                                                                                              •      All materials, equipment, fixtures, fittings, etc. Shall be new
                                                                                                                                                                                                                                                                     first quality without exception. Supply, delivery, storage,
                                                                                                                                                                                                                                                                     installation, etc. Is to be as per the manufacturers most
                                                                                                                                                                                                                                                                     recent written recommendations.
                                                                                                                               EXISTING AWNINGS TO BE REMOVED                                                             EXISTING SIGNAGE TO BE MODIFIED     •      Supply & install fire extinguishers to comply with Australian
                                                                                                                               SHOWN DASHED                                                                                                                          Standards to the area of the proposed work.
                                                                                                                                                                                                                                                              •      Termite protection is to be provided to comply with AS
                                                                                                                                                                                                                                                                     3660.1-2000 and clarification to be provided on completion.
                                                                                                                                                                                                                                                              •      The construction and fit out of commercial kitchens and
                                                                                                                                                                                                                                                                     bars are to comply with AS 4674-2004.
                                                                                                                                                                                                                                                              •      Builder to inspect existing walls that are proposed to have
                                                                                                                                                                                                                                                                     new finishes and ensure that a suitable substrate is present
           Level 1                                                                                                                                                                                                                                                   or is provided to achieve the specified finish. Builder to
                                                                                                                                                                                                                                                                     inspect existing walls that are proposed to conceal services
                                                                                                                                                                                                      2               3
           16.785                                                                                                                                                                                                                                                    and ensure that an adequate cavity is present or provide
                                                                                                                                                                                                                                                                     furring channels.




                                                                                                                           1
           Upper Ground Floor
           13.410



                                                                                                                                                                                                    LOCATION OF NEW
                                                                                                                                                                                                    OPENING FOR NEW
                                                                                                                                                                                                    WINDOW
           Lower Ground Floor
           10.000




             Existing + Demolition - West Elevation
      1        1 : 100




                                                                               EXISTING AWNING TO BE REMOVED                                                    EXISTING AWNING TO BE REMOVED




                                                                                                                                                   2                                                   3


                                                              1                             2
EXISTING AWNING TO BE REMOVED




                                                                                                                                                                                                                                                               D               General Updates                  RH        16.05.25
                                                                                                                                                                                                                                                               C               General updates                  DV        29.04.25
                                                                                                                                                                                                                                                               B               Consultant Issue                 RH        12.02.25
                                                                                                                                                                                                                                                               A               Consultant Issue                 RH        24.01.25
                                                                                                                                                                                                                                                             issue                   revision                  initials     date


                                                                                                                                                                                                                                                                            Cayas
                                                                                                                                                                                                                                                                              + Ward
                                                                                                                                                                                                                                                             Suite 2, 19-25 Musk Avenue, Kelvin Grove. PO Box 360, Wilston Q 4051
                                                                                                                                                                                                                                                                         p 07 3356 6100 e [email protected]
                                                                                                                                                                                                                                                                    NSW Nominated Architect: Kimberley James Garton 8891

                                                                                                                                                                                                                                                            client                     ALH Group


                                                EXISTING GAMING ENTRY AWNING                             EXISTING AWNING                                                    EXISTING ENTRY AWNING                                                           project                    Noosa Reef Hotel
                                                                                                                                                                                                                                                                                       19 Noosa Dr, Noosa Heads
                                                                                                                                                                                                                                                                                       QLD 4567
                                                                                                                                                                                                                                                            drawing title              Existing West Elevation




                                                                                                                                                                                                                                                                                     drawn         RH
                                                                                                                                                                                                                                                                                     date          MAY 2025
                                                                                                                                                                                                                                                                                     scale         1 : 100@A1
                                                                                                                                                                                                                                                            project no.               drawing number                         issue

                                                                                                                                                                                                                                                            2395                      A100.04                                  D

Page 6

                                                                                                                                                                                                                                                                                                                                                                                            TENDER
                                                                                                                                                                                                                                                                                                                                                                                           NOT FOR CONSTRUCTION

                                                                                                                                                                                                                                                                                                                                                                     GENERAL NOTES:
                                                                                                                                                                                                                                                                                                                                                                     (these notes apply to all drawings)

                                                                                                                                                                                                                                                                                                                                                                     •      These designs, drawings and specifications are copyright
                                                                                                                                                                                                                                                                                                                                                                            and the property of Cayas + Ward and must not be used,
                                                                                                                                                                                                                                                                                                                                                                            reproduced or copied wholly or in part without the
                                                                                                                                                                                                                                                                                                                                                                            permission of Cayas + Ward.
                                                                                                                                                                                                                                                                                                                                                                     •      Do not scale - use figured dimensions in preference to
                                                                                                                                                                                                                                                                                                                                                                            scaled dimensions.
                                                                                                                                                                                                                                                                                                                                                                     •      All dimensions must be checked on site prior to the
                                                                                                                                                                                                                                                                                                                                                                            commencement of construction and/or manufacture of any
                                                                                                                                                                                                                                                                                                                                                                            item.
                                                                                                                                                                                                                                                                                                                                                                     •      Where demolition work is included, allow to make good all
                                                                                                                                                                                                                                                                                                                                                                            affected surfaces.
                                                                                                                                                                                                                                                                                                                                                                     •      Ensure that all conditions of the building certification are
                                                                                                                                                                                                                                                                                                                                                                            complied with.
                                                                                                                                                                                                                                                                                                                                                                     •      Where ambiguities or discrepancies exist, Cayas + Ward
                                                                                                                                                                                                                                                                                                                                                                            shall be contacted for clarification, or it will be deemed that
                                                                                                                                                                                                                                                                                                                                                                            the more expensive option has been allowed.
                                                                                                                                                                                                                                                                                                                                                                     •      All work is to comply with all relevant sections of NCC
                                                                                                                                                                                                                                                                                                                                                                            and/or Australian Standards.
                                                                                                                                                                                                                                                                                                                                                                     •      These drawings are to be read in conjunction with all other
                                                                                                                                                                                                                                                                                                                                                                            documentation, schedules & consultant documentation.
                                                                                                                                                                                                                                                                                                                                                                     •      The contractor is to allow for all necessary floor preparation
                                                                                                                                                                                                                                                                                                                                                                            works.
                                                                                                                                                                                                                                                                                                                                                                     •      Provide all warranties as per the manufacturers & suppliers
                                                                                                                                                                                                                                       FC1                                                      FC2                                                                         standard warranties.
                                                                                                                                                                                                                                                                                                                                                                     •      All materials, equipment, fixtures, fittings, etc. Shall be new
                                                                                                                                                                                                                                       ALUMINIUM SCREEN                                         FIBRE CEMENT CLADDING                                                       first quality without exception. Supply, delivery, storage,
                                                                                                                                                                                                                                                                                                                                                                            installation, etc. Is to be as per the manufacturers most
                                                                                                                                                                                                                                                                                                                                                                            recent written recommendations.
                                                                                                                                                                                                                                                                                                                                                                     •      Supply & install fire extinguishers to comply with Australian
                                                                                                                                                                                                                                                                                                                                                                            Standards to the area of the proposed work.
                                                                                                                                                                                                                                                                                                                                                                     •      Termite protection is to be provided to comply with AS
                                                                                                                                                                                                                                                                                                                                                                            3660.1-2000 and clarification to be provided on completion.
                                                                                                                                                                                                                                                                                                                                                                     •      The construction and fit out of commercial kitchens and
                                                                                                                                                                                                                                                                                                                                                                            bars are to comply with AS 4674-2004.
                                                                                                          NO WORK TO LEVEL 1                                                                                                                                                                                                                                         •      Builder to inspect existing walls that are proposed to have
                                                                                                                                                                                                                                                                                                                                                                            new finishes and ensure that a suitable substrate is present
                                                                                                                                                                                                                                                                                                                                                                            or is provided to achieve the specified finish. Builder to
                                                                                                                                                                                                                                                                                                     4                                                                      inspect existing walls that are proposed to conceal services
                                                                                                                                                                               2                                                             3                                                                                                                              and ensure that an adequate cavity is present or provide
                                                                                                                                                                                                                                                                                                   A100.05
                                                                                                                                                                             A100.05                                                   A100.05                                                                                                                              furring channels.
                                                                                                                                                                                                                                                           NEW WINDOW AWNING
                                                                                                                                                                                                                                                                                                                                          EXISTING SIGNAGE PYLON
                                                                                                                                                                                                                                                                                                                                          TO REMAIN, SHOWN
                                                                                                                                                                                                                                                           NEW GLAZING TO EXISTING WALL                                                   DASHED FOR CLARITY

                                                                                                                                                                                             NEW SCREEN                                                    NEW ENTRY AWNING AND FEATURE WALL


                                                                                                                                                                                             NEW ENTRY AWNING TO GAMING ROOM




Level 1                                                                                                                                                                                                                                                                                                  FC1




                                                                                                                                                                                                                                                                                                                        1425
16.785                                                                                                                                                             FC1
                                                                                                                                                                                                                                                                             FC1                         FC2




                                                                                                                                                                                                                               440
                                                                                                                                                                                                                               1150

                                                                                                                                                                                                                                      1150




                                                                                                                                                                                                                                                                                                                        2625
                                                                                                                                                                                   FC1




                                                                                                                                                                                             1095
Upper Ground Floor                                                                                                                                                                 FC2

13.410




                                                                                                                                                                                             2415
                                                                                                                                                                                                                                                                                                                                          NEW PICKET FENCE

                                                                                                                                                                                                                                                                                                                                          WIDENED OPENING BEYOND


     Lower Ground Floor
    10.000




          Proposed - West Elevation
1         1 : 100



                                                                                                                                                                                                                                                                                                                               EXISTING SIGNAGE PYLON
                                                                                                                                                                                                                                                                                                                               TO REMAIN, SHOWN
                                                                                                                                                                                                                                                                                                                               DASHED FOR CLARITY


                                                                        NEW SCREEN
                                                                                                                                              NEW WINDOW AWNING
                                                                        NEW ENTRY AWNING TO GAMING ROOM


                                                                                                                                              NEW GLAZING TO EXISTING WALL


                                                                                                                                                                                                                                                                                          FC1
             Level 1




                                                                                                                                                                                                                                                                                                                        1425
             16.785                        FC1
                                                                                                                                                                                       FC1                                                                                                FC2
                                                                                                                  440
                                                                                                                  1150

                                                                                                                         1150




                                                                                                                                                                                                                                                                                                                        2625
                                                                                                                                                                                                                                                                                                                                                                      A               General Updates                  RH        16.05.25
                                                                                                                                                                                                                                                                                                                                                                    issue                   revision                  initials     date
                                                        FC1
                                                                                                                                                                                                                                                                                                                                                                                   Cayas
                                                                          1095




             Upper Ground Floor
                                                        FC2
                                                                                                                                                                                                                                                                                                                                                                                     + Ward
                                                                                                                                                                                                                                                                                                                                                                    Suite 2, 19-25 Musk Avenue, Kelvin Grove. PO Box 360, Wilston Q 4051
             13.410                                                                                                                                                                                                                                                                                                                                                             p 07 3356 6100 e [email protected]
                                                                                                                                                                                                                                                                                                                                                                           NSW Nominated Architect: Kimberley James Garton 8891

                                                                                                                                                                                                                                                                                                                                                                   client                     ALH Group
                                                                          2415




                                                                                                                                                                                                                                                                                                                               NEW PICKET FENCE                    project                    Noosa Reef Hotel
                                                                                                                                                                                                                                                                                                                                                                                              19 Noosa Dr, Noosa Heads
                                                                                                                                                                                                                                                                                                                                                                                              QLD 4567
                                                                                                                                                                                                                                                                                                                               WIDENED OPENING BEYOND
                                                                                                                                                                                                                                                                                                                                                                   drawing title              Proposed West Elevation




             Lower Ground Floor                                                                                                                                                                                                                                                                                                                                                             drawn        RH
             10.000                                                                                                                                                                                                                                                                                                                                                                         date         MAY 2025
                                  Elevation - Proposed Gaming Entry Awning                                      Elevation - Proposed Window                                                                                                      Elevation - Proposed Entry Awning                                                                                                          scale        As indicated@A1
                          2       1 : 50
                                                                                                          3       1 : 50
                                                                                                                                                                                                                                             4   1 : 50                                                                                                            project no.               drawing number                         issue

                                                                                                                                                                                                                                                                                                                                                                   2395                      A100.05                                  A

Used in these records

About this file

File size
5.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 1 - Proposal Plans.pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.