Skip to the record
For the highest quality transcripts.

Council archive · source document

Attachment 1 - Proposal Plans · 51995.1645.01

Attached to the e-mail Lodgement of Development Application - 51995.1645.01.

of 6

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                                                                                                                                                                                                                                                                                                                            TENDER
                                                                                                                                                                                                                                                                                                                                                                                           NOT FOR CONSTRUCTION

                                                                                                                                                                                                                                                                                                                                                                     GENERAL NOTES:
                                                                                                                                                                                                                                                                                                                                                                     (these notes apply to all drawings)

                                                                                                                                                                                                                                                                                                                                                                     •      These designs, drawings and specifications are copyright
                                                                                                                                                                                                                                                                                                                                                                            and the property of Cayas + Ward and must not be used,
                                                                                                                                                                                                                                                                                                                                                                            reproduced or copied wholly or in part without the
                                                                                                                                                                                                                                                                                                                                                                            permission of Cayas + Ward.
                                                                                                                                                                                                                                                                                                                                                                     •      Do not scale - use figured dimensions in preference to
                                                                                                                                                                                                                                                                                                                                                                            scaled dimensions.
                                                                                                                                                                                                                                                                                                                                                                     •      All dimensions must be checked on site prior to the
                                                                                                                                                                                                                                                                                                                                                                            commencement of construction and/or manufacture of any
                                                                                                                                                                                                                                                                                                                                                                            item.
                                                                                                                                                                                                                                                                                                                                                                     •      Where demolition work is included, allow to make good all
                                                                                                                                                                                                                                                                                                                                                                            affected surfaces.
                                                                                                                                                                                                                                                                                                                                                                     •      Ensure that all conditions of the building certification are
                                                                                                                                                                                                                                                                                                                                                                            complied with.
                                                                                                                                                                                                                                                                                                                                                                     •      Where ambiguities or discrepancies exist, Cayas + Ward
                                                                                                                                                                                                                                                                                                                                                                            shall be contacted for clarification, or it will be deemed that
                                                                                                                                                                                                                                                                                                                                                                            the more expensive option has been allowed.
                                                                                                                                                                                                                                                                                                                                                                     •      All work is to comply with all relevant sections of NCC
                                                                                                                                                                                                                                                                                                                                                                            and/or Australian Standards.
                                                                                                                                                                                                                                                                                                                                                                     •      These drawings are to be read in conjunction with all other
                                                                                                                                                                                                                                                                                                                                                                            documentation, schedules & consultant documentation.
                                                                                                                                                                                                                                                                                                                                                                     •      The contractor is to allow for all necessary floor preparation
                                                                                                                                                                                                                                                                                                                                                                            works.
                                                                                                                                                                                                                                                                                                                                                                     •      Provide all warranties as per the manufacturers & suppliers
                                                                                                                                                                                                                                       FC1                                                      FC2                                                                         standard warranties.
                                                                                                                                                                                                                                                                                                                                                                     •      All materials, equipment, fixtures, fittings, etc. Shall be new
                                                                                                                                                                                                                                       ALUMINIUM SCREEN                                         FIBRE CEMENT CLADDING                                                       first quality without exception. Supply, delivery, storage,
                                                                                                                                                                                                                                                                                                                                                                            installation, etc. Is to be as per the manufacturers most
                                                                                                                                                                                                                                                                                                                                                                            recent written recommendations.
                                                                                                                                                                                                                                                                                                                                                                     •      Supply & install fire extinguishers to comply with Australian
                                                                                                                                                                                                                                                                                                                                                                            Standards to the area of the proposed work.
                                                                                                                                                                                                                                                                                                                                                                     •      Termite protection is to be provided to comply with AS
                                                                                                                                                                                                                                                                                                                                                                            3660.1-2000 and clarification to be provided on completion.
                                                                                                                                                                                                                                                                                                                                                                     •      The construction and fit out of commercial kitchens and
                                                                                                                                                                                                                                                                                                                                                                            bars are to comply with AS 4674-2004.
                                                                                                          NO WORK TO LEVEL 1                                                                                                                                                                                                                                         •      Builder to inspect existing walls that are proposed to have
                                                                                                                                                                                                                                                                                                                                                                            new finishes and ensure that a suitable substrate is present
                                                                                                                                                                                                                                                                                                                                                                            or is provided to achieve the specified finish. Builder to
                                                                                                                                                                                                                                                                                                     4                                                                      inspect existing walls that are proposed to conceal services
                                                                                                                                                                               2                                                             3                                                                                                                              and ensure that an adequate cavity is present or provide
                                                                                                                                                                                                                                                                                                   A100.05
                                                                                                                                                                             A100.05                                                   A100.05                                                                                                                              furring channels.
                                                                                                                                                                                                                                                           NEW WINDOW AWNING
                                                                                                                                                                                                                                                                                                                                          EXISTING SIGNAGE PYLON
                                                                                                                                                                                                                                                                                                                                          TO REMAIN, SHOWN
                                                                                                                                                                                                                                                           NEW GLAZING TO EXISTING WALL                                                   DASHED FOR CLARITY

                                                                                                                                                                                             NEW SCREEN                                                    NEW ENTRY AWNING AND FEATURE WALL


                                                                                                                                                                                             NEW ENTRY AWNING TO GAMING ROOM




Level 1                                                                                                                                                                                                                                                                                                  FC1




                                                                                                                                                                                                                                                                                                                        1425
16.785                                                                                                                                                             FC1
                                                                                                                                                                                                                                                                             FC1                         FC2




                                                                                                                                                                                                                               440
                                                                                                                                                                                                                               1150

                                                                                                                                                                                                                                      1150




                                                                                                                                                                                                                                                                                                                        2625
                                                                                                                                                                                   FC1




                                                                                                                                                                                             1095
Upper Ground Floor                                                                                                                                                                 FC2

13.410




                                                                                                                                                                                             2415
                                                                                                                                                                                                                                                                                                                                          NEW PICKET FENCE

                                                                                                                                                                                                                                                                                                                                          WIDENED OPENING BEYOND


     Lower Ground Floor
    10.000




          Proposed - West Elevation
1         1 : 100



                                                                                                                                                                                                                                                                                                                               EXISTING SIGNAGE PYLON
                                                                                                                                                                                                                                                                                                                               TO REMAIN, SHOWN
                                                                                                                                                                                                                                                                                                                               DASHED FOR CLARITY


                                                                        NEW SCREEN
                                                                                                                                              NEW WINDOW AWNING
                                                                        NEW ENTRY AWNING TO GAMING ROOM


                                                                                                                                              NEW GLAZING TO EXISTING WALL


                                                                                                                                                                                                                                                                                          FC1
             Level 1




                                                                                                                                                                                                                                                                                                                        1425
             16.785                        FC1
                                                                                                                                                                                       FC1                                                                                                FC2
                                                                                                                  440
                                                                                                                  1150

                                                                                                                         1150




                                                                                                                                                                                                                                                                                                                        2625
                                                                                                                                                                                                                                                                                                                                                                      A               General Updates                  RH        16.05.25
                                                                                                                                                                                                                                                                                                                                                                    issue                   revision                  initials     date
                                                        FC1
                                                                                                                                                                                                                                                                                                                                                                                   Cayas
                                                                          1095




             Upper Ground Floor
                                                        FC2
                                                                                                                                                                                                                                                                                                                                                                                     + Ward
                                                                                                                                                                                                                                                                                                                                                                    Suite 2, 19-25 Musk Avenue, Kelvin Grove. PO Box 360, Wilston Q 4051
             13.410                                                                                                                                                                                                                                                                                                                                                             p 07 3356 6100 e [email protected]
                                                                                                                                                                                                                                                                                                                                                                           NSW Nominated Architect: Kimberley James Garton 8891

                                                                                                                                                                                                                                                                                                                                                                   client                     ALH Group
                                                                          2415




                                                                                                                                                                                                                                                                                                                               NEW PICKET FENCE                    project                    Noosa Reef Hotel
                                                                                                                                                                                                                                                                                                                                                                                              19 Noosa Dr, Noosa Heads
                                                                                                                                                                                                                                                                                                                                                                                              QLD 4567
                                                                                                                                                                                                                                                                                                                               WIDENED OPENING BEYOND
                                                                                                                                                                                                                                                                                                                                                                   drawing title              Proposed West Elevation




             Lower Ground Floor                                                                                                                                                                                                                                                                                                                                                             drawn        RH
             10.000                                                                                                                                                                                                                                                                                                                                                                         date         MAY 2025
                                  Elevation - Proposed Gaming Entry Awning                                      Elevation - Proposed Window                                                                                                      Elevation - Proposed Entry Awning                                                                                                          scale        As indicated@A1
                          2       1 : 50
                                                                                                          3       1 : 50
                                                                                                                                                                                                                                             4   1 : 50                                                                                                            project no.               drawing number                         issue

                                                                                                                                                                                                                                                                                                                                                                   2395                      A100.05                                  A

Used in these records

About this file

File size
5.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 1 - Proposal Plans.pdf · 5.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.