Council archive · source document
17155 - Stormwater Quantity Assessment Letter - Rev 0 · OPW17/0612
Attached to the e-mail Operational Works Application OPW17/0612 1 of 2 – Precinct E2 Noosa Springs, Noosa Heads - (MCU15/0109).
MORGAN CONSULTING
E NGINEERS P TY LTD
16003/CG
Page 2
drainage infrastructure within Resort Drive and connections to the development have been
designed for the 10 year ARI (minor storm) event while the drainage flow paths through
Noosa Springs Resort, which includes overland flow paths and underground drainage, have
been designed for the 100 year ARI (major storm) event.
Figure 1: Drawing SW 1 from Noosa Spring Master Drainage Report (June 1995) by Ralph Grierson
Based on this report, the Resort Drive road pipe drainage and property connections to the
development have been designed for the minor storm event with the site developed to an
imperviousness of 50%.
2.0 Stormwater Quantity Analysis
XP-RAFTS was used to model the peak discharges from the development under both existing
(pre development) and proposed (post development) conditions.
2.1 Pre Development
Refer to the enclosed Pre Development Catchment Plan for the catchment details.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
17155 - Stormwater Quantity Assessment Letter - Rev 0.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.